惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Recent Announcements
Recent Announcements
爱范儿
爱范儿
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
宝玉的分享
宝玉的分享
T
Tailwind CSS Blog
博客园_首页
IT之家
IT之家
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - 三生石上(FineUI控件)
有赞技术团队
有赞技术团队
大猫的无限游戏
大猫的无限游戏
雷峰网
雷峰网
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园 - 司徒正美
WordPress大学
WordPress大学
Last Week in AI
Last Week in AI
人人都是产品经理
人人都是产品经理
Jina AI
Jina AI
月光博客
月光博客
小众软件
小众软件
S
SegmentFault 最新的问题
量子位
阮一峰的网络日志
阮一峰的网络日志
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知

Latest Business News, Business News India Today | The HinduBusinessLine

Draft CAFE-3 Norms: Govt eases penalties, focuses on carbon credit trading for auto sector Modi seeks opposition backing to implement women’s reservation before 2029 polls West Asia crisis: Ludhiana handtool export units face labour, gas supply shortages, high input costs Patent application filings in India rise 30.2% to 1.43 lakh in 2025-26: Goyal Meet the man with 138 degrees: Dashrath Singh, an ex-serviceman, earns latest qualification from IGNOU Europe missed AI bus, but India has potential to catch up: Former WEF Director AIG Hospitals, ICMR team up for digital health innovation Juno Joule Bio Fuels begins construction of compressed bio-gas project in Telangana Legendary playback singer Asha Bhosle dies at 92 Signature Global cuts net debt by 77% to ₹200 crore in FY26 Iran aims to restore majority of refining capability within two months Supreme Court to hear on Monday pleas related to SIR of electoral rolls in West Bengal US, India hold engagements to advance defence cooperation Trump shares article suggesting option with him to enforce naval blockade on Iran NCLAT reaffirms project-specific insolvency proceedings against realty firms Iran-US talks in Pakistan ended without deal as Tehran cites ‘excessive demands’ from US Two supertankers U-turn in Hormuz as US-Iran talks break down Time has come to implement Women's Reservation Act: PM Modi's letter to LS, RS floor leaders Iran war diverts US military, attention from Asia ahead of Trump's summit with China's leader Trump says China will have big problems if it ships arms to Iran India will soon become self-reliant in defence sector, find itself among leading nations of the world: Rajnath Singh Pakistan to continue facilitating US-Iran talks, says Dar; urges ceasefire More than 2,000 people killed by Israeli strikes in Lebanon during Israel-Hezbollah war: officials Iran denies US claims of mine clearing ships’ passage through Strait of Hormuz AI to reduce uncertainties and expand opportunities - RBI DG EAM Jaishankar meets members of Indian community in UAE 4 ways war in Iran has weakened United States in great power game US-Iran talks fail after 21 hours in Islamabad, JD Vance cites nuclear deadlock Delhi EV Policy: Electric 3-Wheelers Only by 2027, 2-Wheelers by 2028 Islamabad talks: US and Iran begin negotiations aimed at ending West Asia conflict
Cabinet clears four national highway projects worth over ...
By Rohit Vaid · 2026-06-03 · via Latest Business News, Business News India Today | The HinduBusinessLine
In all, these four projects put together will cover more than 700 km

In all, these four projects put together will cover more than 700 km | Photo Credit: ANI

India will build as well as upgrade four national highway projects with a combined investment of over ₹24,000 crore across Madhya Pradesh, Telangana, Bihar and Odisha.

Accordingly, the Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, approved these four individual projects located in Madhya Pradesh, Telangana, Bihar and Odisha.

In all, these four projects put together will cover more than 700 km, and are expected to improve regional connectivity, ease congestion, reduce travel time and strengthen logistics integration under the PM GatiShakti framework.

Madhya Pradesh project

On individual basis, the CCEA approved the upgradation of the Hiwarkhedi-Roshni-Ashapur-Rudhy section of NH-347B to a two-lane paved shoulder standard and the widening of the Deshgaon-Julwaniya section of NH-347B to four lanes in Madhya Pradesh.

The 233.65-km project will be developed under the Hybrid Annuity Mode (HAM) at a cost of ₹4,415.60 crore.

This corridor passes through Betul, Khandwa, Khargone and Barwani districts and is expected to address geometric deficiencies, sharp curves and congestion across built-up areas.

An additional 16.20-km greenfield bypass around Khargone will also be constructed as part of the project.

The project is expected to improve connectivity to six economic nodes, five social nodes and five logistics nodes, including textile clusters, mega food parks, thermal power plants, airports and railway stations.

Telangana project

The CCEA also approved the widening of the Armoor-Jagtial-Mancherial section of NH-63 and the Jagtial-Karimnagar section of NH-563 in Telangana.

The 190.76-km project will be executed under a combination of Hybrid Annuity Mode and Build-Operate-Transfer (Toll) mode at a total cost of ₹7,597.16 crore.

At present, these highway sections experience significant congestion across major urban centres, including Armoor, Korutla, Jagtial, Dharmapuri, Lakshettipet, Mancherial and Karimnagar.

The project includes bypasses around built-up areas and is designed for speeds of up to 100 km per hour.

Upon completion, travel time between Armoor and Mancherial is expected to reduce by about one hour and 30 minutes, while travel time between Jagtial and Karimnagar is expected to reduce by around 45 minutes.

The corridor will connect five economic nodes, seven social nodes and ten logistics nodes.

Bihar project

Besides, the CCEA approved the upgradation of the Khagaria-Purnea section of NH-31 and NH-231 in Bihar to four-lane standards.

The 143.53-km project will be implemented under BOT (Toll) mode at a cost of ₹3,936.05 crore.

This project passes through Khagaria, Bhagalpur, Katihar and Purnia districts and aims to address congestion, sharp curves and geometric deficiencies along the route.

A 6.73-km greenfield bypass around Purnea city will also be developed.

The project is expected to reduce travel time by around two hours while improving road safety, fuel efficiency and vehicle operating costs.

After completion, the upgraded corridor will connect five economic nodes and eleven logistics nodes, including railway stations, airports and key highway corridors.

Odisha project

Furthermore, the CCEA approved construction of a new coastal highway from Rameshwar to Paradeep in Odisha.

The 160.18-km project will be developed under the Hybrid Annuity Mode at a cost of ₹8,300.79 crore.

The proposed corridor will pass through Khurda, Puri, Kendrapada and Jagatsinghpur districts and is aimed at improving connectivity along Odisha’s coastal belt.

In addition, the project will comprise a four-lane section between Rameshwar and Konark and a two-lane paved shoulder section from Konark to Paradeep.

As per the CCEA, the project will reduce travel time between Rameshwar and Paradeep by around two hours and 30 minutes.

The highway will connect nine economic nodes and five logistics nodes and is expected to improve freight movement while reducing fuel consumption, carbon emissions and vehicle operating costs.

Published on June 3, 2026