惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Google DeepMind News
Google DeepMind News
B
Blog RSS Feed
量子位
aimingoo的专栏
aimingoo的专栏
V
Visual Studio Blog
Y
Y Combinator Blog
Vercel News
Vercel News
云风的 BLOG
云风的 BLOG
宝玉的分享
宝玉的分享
Engineering at Meta
Engineering at Meta
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
GbyAI
GbyAI
人人都是产品经理
人人都是产品经理
博客园 - 叶小钗
Stack Overflow Blog
Stack Overflow Blog
大猫的无限游戏
大猫的无限游戏
Microsoft Security Blog
Microsoft Security Blog
B
Blog
Last Week in AI
Last Week in AI
有赞技术团队
有赞技术团队
博客园 - 聂微东
腾讯CDC
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
J
Java Code Geeks

Latest Business News, Business News India Today | The HinduBusinessLine

Draft CAFE-3 Norms: Govt eases penalties, focuses on carbon credit trading for auto sector Modi seeks opposition backing to implement women’s reservation before 2029 polls West Asia crisis: Ludhiana handtool export units face labour, gas supply shortages, high input costs Patent application filings in India rise 30.2% to 1.43 lakh in 2025-26: Goyal Meet the man with 138 degrees: Dashrath Singh, an ex-serviceman, earns latest qualification from IGNOU Europe missed AI bus, but India has potential to catch up: Former WEF Director AIG Hospitals, ICMR team up for digital health innovation Juno Joule Bio Fuels begins construction of compressed bio-gas project in Telangana Legendary playback singer Asha Bhosle dies at 92 Signature Global cuts net debt by 77% to ₹200 crore in FY26 Iran aims to restore majority of refining capability within two months Supreme Court to hear on Monday pleas related to SIR of electoral rolls in West Bengal US, India hold engagements to advance defence cooperation Trump shares article suggesting option with him to enforce naval blockade on Iran NCLAT reaffirms project-specific insolvency proceedings against realty firms Iran-US talks in Pakistan ended without deal as Tehran cites ‘excessive demands’ from US Two supertankers U-turn in Hormuz as US-Iran talks break down Time has come to implement Women's Reservation Act: PM Modi's letter to LS, RS floor leaders Iran war diverts US military, attention from Asia ahead of Trump's summit with China's leader Trump says China will have big problems if it ships arms to Iran India will soon become self-reliant in defence sector, find itself among leading nations of the world: Rajnath Singh Pakistan to continue facilitating US-Iran talks, says Dar; urges ceasefire More than 2,000 people killed by Israeli strikes in Lebanon during Israel-Hezbollah war: officials Iran denies US claims of mine clearing ships’ passage through Strait of Hormuz AI to reduce uncertainties and expand opportunities - RBI DG EAM Jaishankar meets members of Indian community in UAE 4 ways war in Iran has weakened United States in great power game US-Iran talks fail after 21 hours in Islamabad, JD Vance cites nuclear deadlock Delhi EV Policy: Electric 3-Wheelers Only by 2027, 2-Wheelers by 2028 Islamabad talks: US and Iran begin negotiations aimed at ending West Asia conflict
Health ministry proposes amendments to Medical Devices Rules
PTI · 2026-06-28 · via Latest Business News, Business News India Today | The HinduBusinessLine

The Union health ministry has proposed amendments to the Medical Devices Rules, 2017 to shorten the timelines for the grant of manufacturing licences for medical devices across different risk categories.

The draft notification, published in the official gazette, seeks to simplify and expedite the licensing process while ensuring continued compliance with quality, safety and performance requirements, the ministry said on Sunday

The proposed amendments seek to rationalise the timelines for the grant of manufacturing licences for medical devices across different risk categories. The initiative is aimed at enhancing the ease of doing business, improving regulatory efficiency, and facilitating the timely availability of quality medical devices in the country, the ministry said.

Under the Medical Devices Rules, 2017, medical devices are classified into four risk-based categories — Class A, Class B, Class C and Class D — with Class D comprising the highest-risk devices.

The rules prescribe statutory timelines for processing applications for manufacturing licences for each category.

The proposed amendments seek to reduce these timelines, thereby enabling faster regulatory approvals while maintaining the established standards of quality, safety and performance.

For Class B medical devices, which include low to moderate risk devices such as blood pressure monitors, hypodermic needles and pulse oximeters, the timeline for grant of manufacturing licence has been proposed to be reduced from 140 days to 115 days.

Similarly, for Class C and Class D medical devices, which include high-risk devices such as cardiac stents, hip and knee implants, and other orthopaedic implants, the timeline for grant of manufacturing licence has been proposed to be reduced from 105 days to 90 days.

The draft amendments also introduce clearly defined timelines for each stage of the licensing process, including scrutiny of applications, audit by notified bodies, verification of compliance and issuance of licences.

This is expected to bring greater transparency, predictability and efficiency to the regulatory framework, benefiting both the medical device industry and patients through faster access to quality-assured medical devices, the ministry said.

The draft notification has been placed in the public domain for comments and suggestions from all stakeholders. The notification is available in the official gaazette and on the website of the Central Drugs Standard Control Organisation (CDSCO). Stakeholders are invited to submit their comments and suggestions within the prescribed period.

Published on June 28, 2026