惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

宝玉的分享
宝玉的分享
NISL@THU
NISL@THU
E
Exploit-DB.com RSS Feed
L
LINUX DO - 热门话题
L
Lohrmann on Cybersecurity
K
Kaspersky official blog
Project Zero
Project Zero
Cisco Talos Blog
Cisco Talos Blog
T
The Exploit Database - CXSecurity.com
P
Palo Alto Networks Blog
C
CXSECURITY Database RSS Feed - CXSecurity.com
T
Threatpost
S
Schneier on Security
G
GRAHAM CLULEY
The Hacker News
The Hacker News
T
Threat Research - Cisco Blogs
Scott Helme
Scott Helme
Threat Intelligence Blog | Flashpoint
Threat Intelligence Blog | Flashpoint
P
Privacy & Cybersecurity Law Blog
C
Cyber Attacks, Cyber Crime and Cyber Security
Cyberwarzone
Cyberwarzone
C
CERT Recently Published Vulnerability Notes
T
Tor Project blog
AWS News Blog
AWS News Blog
Simon Willison's Weblog
Simon Willison's Weblog
cs.CL updates on arXiv.org
cs.CL updates on arXiv.org
爱范儿
爱范儿
P
Privacy International News Feed
云风的 BLOG
云风的 BLOG
P
Proofpoint News Feed
S
Securelist
G
Google Developers Blog
The Last Watchdog
The Last Watchdog
Google Online Security Blog
Google Online Security Blog
美团技术团队
F
Fortinet All Blogs
小众软件
小众软件
Recorded Future
Recorded Future
V
Visual Studio Blog
B
Blog RSS Feed
H
Help Net Security
CTFtime.org: upcoming CTF events
CTFtime.org: upcoming CTF events
Google DeepMind News
Google DeepMind News
Blog — PlanetScale
Blog — PlanetScale
博客园 - 聂微东
Stack Overflow Blog
Stack Overflow Blog
Martin Fowler
Martin Fowler
Latest news
Latest news
Spread Privacy
Spread Privacy
H
Heimdal Security Blog

Health, Aviation, Automobiles, Entrepreneurs, India, Technology, Luxury | The HinduBusinessLine

暂无文章

India’s ambitions for nuclear energy face a tariff test
By M Ramesh · 2026-05-21 · via Health, Aviation, Automobiles, Entrepreneurs, India, Technology, Luxury | The HinduBusinessLine

The passage of the SHANTI Act, 2025, allowing the private sector to set up and run nuclear power plants in India has created a buzz. But few seem to have looked at nuclear energy’s soft underbelly — the cost.

India’s existing nuclear power plants produce electricity competitively — at ₹2.72–3.87 a kWhr. But these plants were built decades ago.

What will be the cost of new nuclear power plants? A peek into this was provided by experts at a recent workshop on the SHANTI Act that was organised by the Central Electricity Authority. A pressurised heavy water reactor (PHWR) — the Nuclear Power Corporation of India is building 10 of these at 700 MW capacity each — will cost ₹21 crore a MW.

Using the existing pricing formula — 15.5 per cent return on equity, 2.33 per cent annual depreciation, and so on — the tariff works out to be ₹7.77 a kWhr. In the case of a pressurised water reactor (as opposed to heavy water), the tariff rises to ₹7.78 a kWhr.

Who will buy this at a time when renewable energy supplied continuously through battery or pumped storage is available at around ₹4 and expected to get cheaper over the years?

The workshop deliberated on this point. It has been said that the cost of nuclear power can be reduced by 20 paise by lowering the GST from 18 per cent GST to 5 per cent, and by 30 paise if the tax is eliminated, thereby lowering return expectations — 10 paise for 1 percentage point lower ROI, and 15 paise if the normative interest rate drops by 1 percentage point. The interest rate has one more complexity. The normative rates are calculated on the basis of a 30-year loan. The absence of a 30-year loan product came up at the workshop, and the solution suggested was rollover or refinance of loans for a 30-year period. However, this could expose the projects to uncertainty over future interest rates and sustained reduction in financing costs. Further reduction in tariffs is possible by operating the plant above the normative PLF of 72.5 per cent.

However, despite the potential for tariff reduction, nuclear energy is still expensive. Moreover, the indicative tariffs are valid for the present. Projects set up later would entail a 10 paise rise in tariffs each year, due to the normative increase in O&M costs. A nuclear power project takes 13 years to build.

Cost in private

Now, another question pertains to how costly will be the nuclear power plants set up by the private sector? Till date, the private sector has not gone beyond expressing an interest in nuclear energy — perhaps because the rules are yet to be framed. But when they do embark on a project, they are likely to face the biggest challenge of all: the market.

Furthermore, future nuclear power projects will have to be run on imported uranium — 50 GW nuclear power plants will need about 6,000 tonnes of uranium a year. The Nuclear Fuel Complex in India, even after the proposed expansion, can supply 2,900 tonnes — which will go to supply the upcoming plants of NPCIL. The cost of imported uranium will be impacted by global supply, geopolitics and the attendant factor of exchange rate.

Under the Electricity Act, tariffs are fixed in two ways — cost-plus basis under Section 62; and competitive bidding under Section 63. Tariffs of nuclear power plants are not governed by the Electricity Act — they are fixed by the Department of Atomic Energy in consultation with the Central Electricity Authority, again on cost-plus basis. The tariffs of the private sector projects set up under the SHANTI Act will be fixed in this manner. It is hard to see these as competitive against firm renewable energy.

The picture blurs when we move from large projects to small modular reactors (SMRs), because nobody knows how the costs will pan out.

So, will the SHANTI Act engender a fleet of nuclear power plants that can raise India’s nuclear energy capacity from 8 GW to 100 GW by 2047? Fingers crossed.

Published on May 21, 2026