惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

博客园_首页
Blog — PlanetScale
Blog — PlanetScale
腾讯CDC
aimingoo的专栏
aimingoo的专栏
Microsoft Azure Blog
Microsoft Azure Blog
A
About on SuperTechFans
J
Java Code Geeks
G
Google Developers Blog
N
Netflix TechBlog - Medium
Vercel News
Vercel News
Y
Y Combinator Blog
Recent Announcements
Recent Announcements
I
InfoQ
Stack Overflow Blog
Stack Overflow Blog
酷 壳 – CoolShell
酷 壳 – CoolShell
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
T
The Blog of Author Tim Ferriss
罗磊的独立博客
GbyAI
GbyAI
小众软件
小众软件
大猫的无限游戏
大猫的无限游戏
WordPress大学
WordPress大学
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More

Latest Logistics, Transport News | The HinduBusinessLine

Time to focus on ‘desi’ fleet creation Northern Railway to operate regular Delhi-Kashmir parcel train service from April 17 GE, HAL clinch tech deal on joint jet engine plan Air India-SIA top brass meet amid leadership flux, massive losses Telangana launches project Sanjeevani for integrated trauma care on highways Delhi airport traffic stalls in CY 25, drops off busiest airport list Glydways targets $1 billion valuation with $250 million funding push Datamatics powers Mumbai Metro Lines 2B & 9 with AFC, mobile ticketing Jeh Aerospace inks pact with Liebherr-Aerospace to supply high-precision components Indian LPG vessel Jag Vikram reaches Kandla Port after crossing Strait of Hormuz Telangana govt ready for dialogue with TGSRTC staff: Minister 63 Moons’ cybersecurity arm pilots GPS-spoofing solution at Indian airports GE Aerospace–HAL move closer to F414-INS6 engine co-production deal PM Modi inaugurates Delhi–Dehradun Economic Corridor to accelerate regional connectivity GE Aerospace, HAL inching closer to seal jet engine deal Highways ministry notifies amendment to streamline fee for overloaded vehicles on NHs Global aviation crisis deepens as fuel shortage, Iran conflict hit airlines Reduction in airport tariff credit neutral, minimal impact on revenue: Ind-Ra Bluspring Enterprises to acquire LSG Sky Chefs India, enters aviation catering sector Maharashtra: Marathi mandatory for rickshaw and taxi drivers from May 1 Airlines may get ₹5,000 crore credit support under proposed ECLGS variant Kirloskar Brothers boosts naval capability with contribution to INS Taragiri A1 adds 10 multi-axle tankers to expand fleet No immediate impact of US blocking Iranian vessels on India’s crude cargoes US naval blockade of Iranian ports begins; UKMTO confirms enforcement GE Aerospace to set up Tejas engine maintenance facility for IAF India strengthens Sri Lanka maritime push, counters China with strategic bets Indore SEZ exports surge 10.50% to cross ₹14,000 crore in FY 2026 GE Aerospace-IAF tie up for depo-level maintenance iof F404 -IN20 engines France, UK to lead multinational mission to restore navigation in Strait of Hormuz: Macron
Cabinet approves rail multitracking projects in Uttar Pra...
2026-04-18 · via Latest Logistics, Transport News | The HinduBusinessLine

The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, on Saturday approved two projects of the Ministry of Railways with a total cost of approx. Rs. 24,815 crore. According to an offical release, these projects include Ghaziabad - Sitapur 3rd and 4th Line, with a route length of 403 km and a track length of 859 km and the estimated cost of this line is Rs14,926 crore (approx.) and the Rajahmundry (Nidadavolu) - Visakhapatnam (Duvvada) 3rd and 4th Line, with route and track lengths of 198 km and 458 km, respectively and the estimated cost is Rs 9,889 crore (approx.).

Boost to capacity, efficiency and connectivity

The increased line capacity will significantly enhance mobility, resulting in improved operational efficiency and service reliability for Indian Railways. These multi-tracking proposals are poised to streamline operations and alleviate congestion. The projects are in line with the Prime Minister Narendra Modiji’s Vision of a New India, which will make people of the region “Atmanirbhar” by way of comprehensive development in the area, which will enhance their employment/ self-employment opportunities.

Aligned with PM Gati Shakti plan

The projects are planned on the PM-Gati Shakti National Master Plan with a focus on enhancing multi-modal connectivity & logistic efficiency through integrated planning and stakeholder consultations. These projects will provide seamless connectivity for the movement of people, goods, and services, the release noted. The two projects covering 15 Districts across the states of Uttar Pradesh and Andhra Pradesh will increase the existing network of Indian Railways by about 601 Kms.

Tourism, freight and environmental benefits

The proposed capacity enhancement will improve rail connectivity to several prominent tourist destinations across the country, including Dudheshwarnath Temple, Garhmukteshwar Ganga Ghat, Dargah Shah Wilayat Jama Masjid (Amroha), Naimisharanya (Sitapur), Annavaram, Antarvedi, Draksharamam, etc. The proposed projects are essential routes for transportation of commodities such as coal, foodgrains, cement, POL, iron and steel, containers, fertilisers, sugar, chemical salts, limestone, etc. The Railways, being environment friendly and energy-efficient mode of transportation, will help both in achieving climate goals and minimising logistics cost of the country, lowering CO2 emissions (180.31 Crore kg), which is equivalent to the plantation of 7.33 Crore trees, according to the release.

Ghaziabad–Sitapur corridor to ease congestion

The Ghaziabad - Sitapur is an existing double-line section forming a key part of the Delhi- Guwahati High Density Network (HDN 4). This project is crucial for improving connectivity between the Northern and Eastern regions of the country. The existing line capacity utilisation of the section is up to 168% and is projected to be up to 207% in case the project is not taken up. The line traverses through Ghaziabad, Hapur, Amroha, Moradabad, Rampur, Bareilly, Sahjahanpur, Lakhimpur Kheri and Sitapur districts of Uttar Pradesh.

The project route passes through major industrial centres - Ghaziabad (machinery, electronics, pharmaceuticals), Moradabad (brassware and handicrafts), Bareilly (furniture, textiles, engineering), Shahjahanpur (carpets and cement-related industries), and Roza (thermal power plant). For seamless transportation, the project alignment is planned to bypass congested stations of Hapur, Simbhaoli, Moradabad, Rampur, Bareilly, Shahjahanpur, and Sitapur, and accordingly, six new stations are proposed on the bypassing sections. Key tourist/religious places along/near the project section are Dudheshwarnath Temple, Garhmukteshwar Ganga Ghat, Dargah Shah Wilayat Jama Masjid (Amroha), and Naimisharanya (Sitapur), among others.

Anticipated additional freight traffic is 35.72 MTPA, consisting of Coal, Foodgrains, Chemical Manures, Finished Steel, etc and employment generation scope of 274 lakh human-days. Meanwhile, the CO2 emissions of about 128.77 crore kg will be saved while logistic cost till Rs. 2,877.46 crore will be saved every year vis-a-vis road transportation, the release highlighted.

Rajahmundry–Visakhapatnam line to support coastal growth

On the other hand, the Rajahmundry (Nidadavolu) - Visakhapatnam (Duvvada) section forms part of the Howrah - Chennai High Density Network (HDN).

The proposed project is part of the quadrupling initiative of the Howrah-Chennai High-Density Network (HDN) route. The project traverses through East Godavari, Konaseema, Kakinada, Anakapalle and Vishakapatnam districts of Andhra Pradesh. Visakhapatnam is identified as an Aspirational District in the Aspirational Districts Programme. It provides connectivity to major ports along the East Coast such as Visakhapatnam, Gangavaram, Machilipatnam and Kakinada.

The project route runs along the eastern coastline and is among the busiest, predominantly freight-oriented sections of the East Coast Rail Corridor. The line capacity utilisation of the section has already reached up to 130%, leading to frequent congestion and operational delays. The line capacity is expected to increase further due to the proposed expansion of ports and industries in the region. The project section includes a 4.3 km rail bridge over the Godavari River, 2.67 km viaduct, 3 bypasses and the new alignment is around 8 km shorter than the existing route, improving connectivity and operational efficiency.

The proposed section will also boost tourism by improving access to key destinations such as Annavaram, Antarvedi and Draksharamam, etc. Additional freight traffic of 29.04 MTPA consisting of Coal, Cement, Chemical Manures, Iron and Steel, Foodgrains, Containers, Bauxite, Gypsum, Limestone, etc is anticipated, while employment generation is expected up to 135 lakh human-days. CO2 emissions of about 51.49 crore kg CO2 equivalent to 2.06 Cr trees and logistic cost of Rs. 1,150.56 crore every year vis-a-vis road transportation, will be saved, the release emphasised.

Published on April 18, 2026