惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

量子位
D
Docker
月光博客
月光博客
MongoDB | Blog
MongoDB | Blog
Vercel News
Vercel News
美团技术团队
博客园 - 叶小钗
I
InfoQ
Jina AI
Jina AI
博客园 - 司徒正美
雷峰网
雷峰网
B
Blog
Y
Y Combinator Blog
A
About on SuperTechFans
WordPress大学
WordPress大学
酷 壳 – CoolShell
酷 壳 – CoolShell
大猫的无限游戏
大猫的无限游戏
Microsoft Security Blog
Microsoft Security Blog
Stack Overflow Blog
Stack Overflow Blog
腾讯CDC
H
Hackread – Cybersecurity News, Data Breaches, AI and More
Recent Announcements
Recent Announcements
V
V2EX
N
Netflix TechBlog - Medium

Latest Logistics, Transport News | The HinduBusinessLine

Hyderabad Metro Rail takeover: Telangana govt likely to extend April 30 deadline Time to focus on ‘desi’ fleet creation Northern Railway to operate regular Delhi-Kashmir parcel train service from April 17 GE, HAL clinch tech deal on joint jet engine plan Air India-SIA top brass meet amid leadership flux, massive losses Telangana launches project Sanjeevani for integrated trauma care on highways Delhi airport traffic stalls in CY 25, drops off busiest airport list Glydways targets $1 billion valuation with $250 million funding push Datamatics powers Mumbai Metro Lines 2B & 9 with AFC, mobile ticketing Jeh Aerospace inks pact with Liebherr-Aerospace to supply high-precision components Indian LPG vessel Jag Vikram reaches Kandla Port after crossing Strait of Hormuz Telangana govt ready for dialogue with TGSRTC staff: Minister 63 Moons’ cybersecurity arm pilots GPS-spoofing solution at Indian airports GE Aerospace–HAL move closer to F414-INS6 engine co-production deal PM Modi inaugurates Delhi–Dehradun Economic Corridor to accelerate regional connectivity GE Aerospace, HAL inching closer to seal jet engine deal Highways ministry notifies amendment to streamline fee for overloaded vehicles on NHs Global aviation crisis deepens as fuel shortage, Iran conflict hit airlines Reduction in airport tariff credit neutral, minimal impact on revenue: Ind-Ra Bluspring Enterprises to acquire LSG Sky Chefs India, enters aviation catering sector Maharashtra: Marathi mandatory for rickshaw and taxi drivers from May 1 Airlines may get ₹5,000 crore credit support under proposed ECLGS variant Kirloskar Brothers boosts naval capability with contribution to INS Taragiri A1 adds 10 multi-axle tankers to expand fleet No immediate impact of US blocking Iranian vessels on India’s crude cargoes US naval blockade of Iranian ports begins; UKMTO confirms enforcement GE Aerospace to set up Tejas engine maintenance facility for IAF India strengthens Sri Lanka maritime push, counters China with strategic bets Indore SEZ exports surge 10.50% to cross ₹14,000 crore in FY 2026 GE Aerospace-IAF tie up for depo-level maintenance iof F404 -IN20 engines
DMRC launches mid-life refurbishment of Blue Line trains ...
By ANI · 2026-04-12 · via Latest Logistics, Transport News | The HinduBusinessLine

The Delhi Metro Rail Corporation (DMRC) has undertaken a comprehensive mid-life refurbishment (retrofit) initiative for its Blue Line trains to enhance passenger safety, comfort, and overall travel experience. Under this initiative, the oldest Rolling Stock (RS-1) trains are being upgraded with modern technology and improved facilities to ensure they remain reliable and meet current standards, the metro operator said.

As part of its mid-life refurbishment programme, DMRC is refurbishing 70 trains of the Red and Blue lines in a phased manner. In the first phase, 12 trains have already been upgraded. In the second phase, 18 trains have been refurbished, and work on another 9 trains will begin soon, followed by work on the remaining 9 trains. In the third phase, 22 Blue Line trains will be refurbished by November 2027.

These trains, inducted between 2002 and 2007, have completed nearly 19 to 24 years of service and are being upgraded with modern systems and features to align with the latest rolling Stock standards. Dr. Vikas Kumar, Managing Director of DMRC, inspected the first refurbished train of the third phase before it was inducted into passenger service. With this, a total of 31 trains have been refurbished so far, showing DMRC's continued focus on modernisation.

According to the release, the refurbishment work includes major improvements to both the train interiors and systems. The interior areas, including passenger sections and driver cabins, have been repainted to restore aesthetics and fix wear and tear from many years of use.

Electrical panels have also been upgraded to enhance performance and reliability.State-of-the-art IP-based Passenger Announcement and Passenger Information Systems (PA-PIS), CCTV systems, and LCD-based Dynamic Route Map (DRM), along with display screens, have been installed.

These systems provide real-time information about routes, current time, and expected arrival at stations. They also enable communication between passengers and train operators during emergencies. A new Fire Detection System, equipped with smoke and heat detectors, has been installed in all coaches.

Old relays and Miniature Circuit Breakers (MCBs) have also been replaced with advanced units to improve safety and ensure smooth operations. To meet passenger needs, mobile and laptop charging points have been introduced in all coaches. New jumper cables and connectors have also been installed to support upgraded systems like PA-PIS and Fire Detection Systems, as well as to accommodate future upgrades.

Published on April 12, 2026