惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

爱范儿
爱范儿
WordPress大学
WordPress大学
C
Check Point Blog
GbyAI
GbyAI
U
Unit 42
Google DeepMind News
Google DeepMind News
B
Blog RSS Feed
Blog — PlanetScale
Blog — PlanetScale
J
Java Code Geeks
I
InfoQ
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Hugging Face - Blog
Hugging Face - Blog
Vercel News
Vercel News
博客园 - 【当耐特】
美团技术团队
小众软件
小众软件
S
SegmentFault 最新的问题
Jina AI
Jina AI
阮一峰的网络日志
阮一峰的网络日志
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
The Cloudflare Blog
Last Week in AI
Last Week in AI
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
V
Visual Studio Blog

Latest Logistics, Transport News | The HinduBusinessLine

Time to focus on ‘desi’ fleet creation Northern Railway to operate regular Delhi-Kashmir parcel train service from April 17 GE, HAL clinch tech deal on joint jet engine plan Air India-SIA top brass meet amid leadership flux, massive losses Telangana launches project Sanjeevani for integrated trauma care on highways Delhi airport traffic stalls in CY 25, drops off busiest airport list Glydways targets $1 billion valuation with $250 million funding push Datamatics powers Mumbai Metro Lines 2B & 9 with AFC, mobile ticketing Jeh Aerospace inks pact with Liebherr-Aerospace to supply high-precision components Indian LPG vessel Jag Vikram reaches Kandla Port after crossing Strait of Hormuz Telangana govt ready for dialogue with TGSRTC staff: Minister 63 Moons’ cybersecurity arm pilots GPS-spoofing solution at Indian airports GE Aerospace–HAL move closer to F414-INS6 engine co-production deal PM Modi inaugurates Delhi–Dehradun Economic Corridor to accelerate regional connectivity GE Aerospace, HAL inching closer to seal jet engine deal Highways ministry notifies amendment to streamline fee for overloaded vehicles on NHs Global aviation crisis deepens as fuel shortage, Iran conflict hit airlines Reduction in airport tariff credit neutral, minimal impact on revenue: Ind-Ra Bluspring Enterprises to acquire LSG Sky Chefs India, enters aviation catering sector Maharashtra: Marathi mandatory for rickshaw and taxi drivers from May 1 Airlines may get ₹5,000 crore credit support under proposed ECLGS variant Kirloskar Brothers boosts naval capability with contribution to INS Taragiri A1 adds 10 multi-axle tankers to expand fleet No immediate impact of US blocking Iranian vessels on India’s crude cargoes US naval blockade of Iranian ports begins; UKMTO confirms enforcement GE Aerospace to set up Tejas engine maintenance facility for IAF India strengthens Sri Lanka maritime push, counters China with strategic bets Indore SEZ exports surge 10.50% to cross ₹14,000 crore in FY 2026 GE Aerospace-IAF tie up for depo-level maintenance iof F404 -IN20 engines France, UK to lead multinational mission to restore navigation in Strait of Hormuz: Macron
Mumbai-Ahmedabad bullet train: Tunnel breakthrough achiev...
By PTI · 2026-06-02 · via Latest Logistics, Transport News | The HinduBusinessLine

The Mumbai-Ahmedabad bullet train project has achieved another milestone with the excavation of a mountain tunnel in Maharashtra's Palghar, which is the third in the district in the last five months, officials said on Tuesday.

The National High Speed Rail Corporation Limited (NHSRCL), which is implementing the project, said this significant breakthrough was achieved on June 1.

Engineers successfully completed the excavation of the third mountain tunnel (MT-07) at Ambesari village in Dahanu taluka of Palghar district, marking a crucial step forward for the Mumbai-Ahmedabad bullet train project, the NHSRCL said in a statement on Tuesday.

With this latest achievement, the project has successfully excavated three mountain tunnels within the last five months alone, signaling rapid construction progress in one of the corridor's most geographically complex stretches, it said.

The newly-excavated tunnel spans 417 metres in length and features a massive width of 14.4 metres. The structure has been specifically designed to accommodate both the up and down tracks of the high-speed bullet train corridor, according to the statement.

To carve through the rugged terrain, the NHSRCL used a highly coordinated controlled drilling and blasting method, executing the excavation simultaneously from both ends.

Given the logistical challenges of mountain excavation, advanced monitoring systems and geotechnical instruments were deployed to ensure total structural stability, it said.

The site featured real-time monitoring technologies, including Surface Settlement Points (SSP) and 3D targets to track ground movement; strain gauges and seismographs to continuously monitor vibrations and tunnel behavior, protecting nearby structures.

Strict safety protocols were in place for workers, including state-of-the-art ventilation systems, fire safety measures, and controlled access arrangements, the NHSRCL said.

The successful excavation of MT-07 officially completes all three mountain tunnels (MT-08, MT-07, and MT-06) located between the Vapi (Gujarat) and Boisar (Maharashtra) bullet train stations.

This specific section of the corridor cuts through a vital industrial belt.

The rapid completion of these tunnels ensures that the high-speed link between these two major economic hubs remains on track.

The ambitious project requires a total of eight mountain tunnels, with seven located in Palghar and one in the Valsad (Gujarat).

The 508-km railway project connecting Mumbai and Ahmedabad, which passes through Gujarat, Maharashtra, and Dadra and Nagar Haveli, is India's only high-speed rail project designed to operate bullet trains at a speed of 320 kmph.

The project is being executed with technical and financial assistance from the Japanese government.

The corridor will connect major cities, including Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi, Boisar, Virar, Thane, and Mumbai. Once completed, the project will reduce travel time between Mumbai and Ahmedabad to just 1 hour and 58 minutes, officials have said.

The project achieved its second tunnel breakthrough in February this year near Saphale village in Palghar district. A month prior to that (in January), another breakthrough of the MT-5 tunnel was achieved near Saphale.

Published on June 2, 2026