惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

博客园 - Franky
N
Netflix TechBlog - Medium
宝玉的分享
宝玉的分享
Google DeepMind News
Google DeepMind News
腾讯CDC
G
Google Developers Blog
Martin Fowler
Martin Fowler
Microsoft Security Blog
Microsoft Security Blog
Recent Announcements
Recent Announcements
爱范儿
爱范儿
Engineering at Meta
Engineering at Meta
Microsoft Azure Blog
Microsoft Azure Blog
A
About on SuperTechFans
aimingoo的专栏
aimingoo的专栏
有赞技术团队
有赞技术团队
Jina AI
Jina AI
人人都是产品经理
人人都是产品经理
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
M
MIT News - Artificial intelligence
罗磊的独立博客
博客园 - 三生石上(FineUI控件)
美团技术团队
WordPress大学
WordPress大学
阮一峰的网络日志
阮一峰的网络日志

Economy News, Latest Economic News Today | The HinduBusinessLine

GE, HAL clinch tech deal on joint jet engine plan India rejects USTR allegations, seeks termination of Section 301 probe Indian automobile sales record highest-ever sales in FY26, first time after FY19: SIAM Madhya Pradesh CM says basmati rice from the State is exported to 47 nations 63 Moons’ cybersecurity arm pilots GPS-spoofing solution at Indian airports Highways ministry notifies amendment to streamline fee for overloaded vehicles on NHs Global aviation crisis deepens as fuel shortage, Iran conflict hit airlines TRI launches agri-voltaic project to help farmers earn double income Hotel industry to hit $31 billion in 2029; listed hotel firms set to add 70k rooms by 2030: CBRE Temperatures may trend up over North-West, Central India until weekend Reduction in airport tariff credit neutral, minimal impact on revenue: Ind-Ra Global coffee prices rise as fertiliser costs and West Asia tensions threaten supply Bluspring Enterprises to acquire LSG Sky Chefs India, enters aviation catering sector China says policy to improve relations with India remains unchanged amid Arunachal naming row Research firms divided over impact of below normal monsoon on food inflation Unnat Krishi Mahotsav concludes, farmers to emerge as energy, fuel & hydrogen providers, says Gadkari Airlines may get ₹5,000 crore credit support under proposed ECLGS variant How kashmir’s breakthrough is making Gucchi mushroom farming possible Centre not taking away State’s power on bonus for agri produces, says FM Sitharaman Carriers cut flights on cost pressures, uncertain demand GE Aerospace scales AI from pilots to production; India anchors global capability West Asia crisis may push India’s current account deficit to 2% of GDP: Crisil Tax Dept to resume Tiger Global reassessment, says GAAR relief won’t alter SC ruling Ceasefire talks fail to restore vessel movement in Strait of Hormuz, fate of 599 ships remain inconclusive DMRC launches mid-life refurbishment of Blue Line trains to enhance safety and passenger experience Retail inflation likely rose 3.5-4% in March India-UK free trade pact may come into force from second week of May: Official 'West Asia war a good opportunity for energy reforms, lower costs for industry' India’s marine exports surge to ₹62,408 crore in 2024-25, Govt sets ₹1 lakh crore target PM Modi to inaugurate Dehradun-Delhi Expressway on April 14
No blanket extension on ALMM for solar PV cells beyond Ju...
By BL New Delhi Bureau · 2026-05-25 · via Economy News, Latest Economic News Today | The HinduBusinessLine
Projects commissioned after June 1 will be required to comply with the ALMM provisions.

Projects commissioned after June 1 will be required to comply with the ALMM provisions. | Photo Credit: KUMAR SS

The Ministry of New & Renewable Energy (MNRE) said on Monday that no blanket extension of the deadline for applicability of Approved List of Models and Manufacturers (ALMM) List-II for solar PV cells beyond June 1, 2026 is required.

The decision has been taken after detailed examination of representations received from stakeholders and wider consultations held with the industry, it added.

Under the existing framework for ALMM List-II for solar PV cells, net-metering projects and open access projects commissioned prior to June 1, 2026 are exempt from the applicability of ALMM List-II. Projects commissioned after this date will be required to comply with the ALMM provisions.

The Ministry had received several representations regarding the timeline of June 1, 2026, with some stakeholders seeking extension of the deadline and others seeking that no extension be granted.

During the review process, the Ministry also considered the Office Memorandum dated April 29, 2026 issued by the Department of Expenditure, which, inter alia, advised treatment of the ongoing West Asia situation as war and suggested that time extension for a period of not less than two months and not more than four months may be considered on the basis of specific situations and not through a blanket policy, MNRE said.

“After detailed examination of the representations received and wider stakeholder consultations, it has been decided that no blanket extension of the deadline for applicability of ALMM List-II for solar PV cells beyond June 1, 2026 is required to be provided,” it added.

However, in order to protect investments already made in the larger public interest, certain net-metering, open access and renewable energy power projects will be considered for appropriate time extension on a case-to-case basis.

These include projects where installation of solar modules has been completed but commissioning is pending, or projects where effective steps towards implementation have already been undertaken by Renewable Energy power developers. Such effective steps will include land acquisition, financial closure, connectivity arrangements, approval of electrical drawings, and arrival or installation of solar modules.

Such cases will be considered for appropriate time extension in respect of applicability of ALMM List-II for solar PV cells after objective assessment of the supporting information and documentary proof submitted by the concerned developers, the Ministry said.

Renewable power project developers seeking time extension beyond June 1, 2026, may submit their claims, along with requisite documentary proof, through a dedicated portal developed by the National Institute of Solar Energy (NISE) for this purpose on or before June 30, 2026.

Such claims shall be examined by an expert committee to be constituted by the Ministry to recommend project-wise, case-to-case claims based on the information provided by the concerned Renewable Energy power developers, MNRE said.

Published on May 25, 2026