惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

D
DataBreaches.Net
N
Netflix TechBlog - Medium
F
Fortinet All Blogs
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
宝玉的分享
宝玉的分享
Y
Y Combinator Blog
博客园 - 聂微东
WordPress大学
WordPress大学
酷 壳 – CoolShell
酷 壳 – CoolShell
B
Blog RSS Feed
小众软件
小众软件
The GitHub Blog
The GitHub Blog
S
SegmentFault 最新的问题
Hugging Face - Blog
Hugging Face - Blog
Jina AI
Jina AI
Microsoft Azure Blog
Microsoft Azure Blog
V
V2EX
B
Blog
H
Help Net Security
D
Docker
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
罗磊的独立博客
月光博客
月光博客
博客园 - 司徒正美

Economy News, Latest Economic News Today | The HinduBusinessLine

GE, HAL clinch tech deal on joint jet engine plan India rejects USTR allegations, seeks termination of Section 301 probe Indian automobile sales record highest-ever sales in FY26, first time after FY19: SIAM Madhya Pradesh CM says basmati rice from the State is exported to 47 nations 63 Moons’ cybersecurity arm pilots GPS-spoofing solution at Indian airports Highways ministry notifies amendment to streamline fee for overloaded vehicles on NHs Global aviation crisis deepens as fuel shortage, Iran conflict hit airlines TRI launches agri-voltaic project to help farmers earn double income Hotel industry to hit $31 billion in 2029; listed hotel firms set to add 70k rooms by 2030: CBRE Temperatures may trend up over North-West, Central India until weekend Reduction in airport tariff credit neutral, minimal impact on revenue: Ind-Ra Global coffee prices rise as fertiliser costs and West Asia tensions threaten supply Bluspring Enterprises to acquire LSG Sky Chefs India, enters aviation catering sector China says policy to improve relations with India remains unchanged amid Arunachal naming row Research firms divided over impact of below normal monsoon on food inflation Unnat Krishi Mahotsav concludes, farmers to emerge as energy, fuel & hydrogen providers, says Gadkari Airlines may get ₹5,000 crore credit support under proposed ECLGS variant How kashmir’s breakthrough is making Gucchi mushroom farming possible Centre not taking away State’s power on bonus for agri produces, says FM Sitharaman Carriers cut flights on cost pressures, uncertain demand GE Aerospace scales AI from pilots to production; India anchors global capability West Asia crisis may push India’s current account deficit to 2% of GDP: Crisil Tax Dept to resume Tiger Global reassessment, says GAAR relief won’t alter SC ruling Ceasefire talks fail to restore vessel movement in Strait of Hormuz, fate of 599 ships remain inconclusive DMRC launches mid-life refurbishment of Blue Line trains to enhance safety and passenger experience Retail inflation likely rose 3.5-4% in March India-UK free trade pact may come into force from second week of May: Official 'West Asia war a good opportunity for energy reforms, lower costs for industry' India’s marine exports surge to ₹62,408 crore in 2024-25, Govt sets ₹1 lakh crore target PM Modi to inaugurate Dehradun-Delhi Expressway on April 14
Cabinet clears four national highway projects worth over ...
By Rohit Vaid · 2026-06-03 · via Economy News, Latest Economic News Today | The HinduBusinessLine
In all, these four projects put together will cover more than 700 km

In all, these four projects put together will cover more than 700 km | Photo Credit: ANI

India will build as well as upgrade four national highway projects with a combined investment of over ₹24,000 crore across Madhya Pradesh, Telangana, Bihar and Odisha.

Accordingly, the Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, approved these four individual projects located in Madhya Pradesh, Telangana, Bihar and Odisha.

In all, these four projects put together will cover more than 700 km, and are expected to improve regional connectivity, ease congestion, reduce travel time and strengthen logistics integration under the PM GatiShakti framework.

Madhya Pradesh project

On individual basis, the CCEA approved the upgradation of the Hiwarkhedi-Roshni-Ashapur-Rudhy section of NH-347B to a two-lane paved shoulder standard and the widening of the Deshgaon-Julwaniya section of NH-347B to four lanes in Madhya Pradesh.

The 233.65-km project will be developed under the Hybrid Annuity Mode (HAM) at a cost of ₹4,415.60 crore.

This corridor passes through Betul, Khandwa, Khargone and Barwani districts and is expected to address geometric deficiencies, sharp curves and congestion across built-up areas.

An additional 16.20-km greenfield bypass around Khargone will also be constructed as part of the project.

The project is expected to improve connectivity to six economic nodes, five social nodes and five logistics nodes, including textile clusters, mega food parks, thermal power plants, airports and railway stations.

Telangana project

The CCEA also approved the widening of the Armoor-Jagtial-Mancherial section of NH-63 and the Jagtial-Karimnagar section of NH-563 in Telangana.

The 190.76-km project will be executed under a combination of Hybrid Annuity Mode and Build-Operate-Transfer (Toll) mode at a total cost of ₹7,597.16 crore.

At present, these highway sections experience significant congestion across major urban centres, including Armoor, Korutla, Jagtial, Dharmapuri, Lakshettipet, Mancherial and Karimnagar.

The project includes bypasses around built-up areas and is designed for speeds of up to 100 km per hour.

Upon completion, travel time between Armoor and Mancherial is expected to reduce by about one hour and 30 minutes, while travel time between Jagtial and Karimnagar is expected to reduce by around 45 minutes.

The corridor will connect five economic nodes, seven social nodes and ten logistics nodes.

Bihar project

Besides, the CCEA approved the upgradation of the Khagaria-Purnea section of NH-31 and NH-231 in Bihar to four-lane standards.

The 143.53-km project will be implemented under BOT (Toll) mode at a cost of ₹3,936.05 crore.

This project passes through Khagaria, Bhagalpur, Katihar and Purnia districts and aims to address congestion, sharp curves and geometric deficiencies along the route.

A 6.73-km greenfield bypass around Purnea city will also be developed.

The project is expected to reduce travel time by around two hours while improving road safety, fuel efficiency and vehicle operating costs.

After completion, the upgraded corridor will connect five economic nodes and eleven logistics nodes, including railway stations, airports and key highway corridors.

Odisha project

Furthermore, the CCEA approved construction of a new coastal highway from Rameshwar to Paradeep in Odisha.

The 160.18-km project will be developed under the Hybrid Annuity Mode at a cost of ₹8,300.79 crore.

The proposed corridor will pass through Khurda, Puri, Kendrapada and Jagatsinghpur districts and is aimed at improving connectivity along Odisha’s coastal belt.

In addition, the project will comprise a four-lane section between Rameshwar and Konark and a two-lane paved shoulder section from Konark to Paradeep.

As per the CCEA, the project will reduce travel time between Rameshwar and Paradeep by around two hours and 30 minutes.

The highway will connect nine economic nodes and five logistics nodes and is expected to improve freight movement while reducing fuel consumption, carbon emissions and vehicle operating costs.

Published on June 3, 2026