惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

博客园 - Franky
U
Unit 42
MyScale Blog
MyScale Blog
B
Blog
阮一峰的网络日志
阮一峰的网络日志
量子位
IT之家
IT之家
The GitHub Blog
The GitHub Blog
F
Fortinet All Blogs
Recent Announcements
Recent Announcements
V
Visual Studio Blog
G
Google Developers Blog
Last Week in AI
Last Week in AI
雷峰网
雷峰网
博客园 - 聂微东
博客园 - 叶小钗
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
J
Java Code Geeks
博客园 - 司徒正美
Y
Y Combinator Blog
T
The Blog of Author Tim Ferriss
月光博客
月光博客
aimingoo的专栏
aimingoo的专栏

Business News Today: Latest Business News, Finance News

Markets’ dilemma: Trust the bark or wag of oil prices The sector call illusion Bandu’s Blockbusters For April 12, 2026 Mastering Derivatives: Does Lag Impact Effectiveness Of OI? Who Am I? April 12, 2026 Index Outlook: Rising From Dire Straits US Market Outlook: Gaining Strength Bullion Cues: Gold And Silver Futures Face Barrier F&O Tracker: Tentative Shift In Trend F&O Strategy: Buy L&T Put Maruti Suzuki to launch 4 EVs by 2031 India Inc flags surge in cost of packaging raw material, seeks relief measures India-flagged LPG tanker Jag Vikram crosses Strait of Hormuz after US-Iran ceasefire Muted pricing power, rising costs to curb benefits of demand in cement sector: HDFC Securities Iran's new supreme leader Mojtaba Khamenei has severe and disfiguring wounds, sources say No road tax, registration fees for electric vehicles priced up to ₹30 lakh till March 2030: Delhi’s draft EV policy Central Railway to run four special local trains for Ambedkar Jayanti West Asia tensions push up costs for India; further impact hinges on stability: Report ED initiates fresh raids against former Bengal minister Chatterjee in teacher recruitment scam Election Commission reverses Mittal’s DVAC posting, appoints him DGP, TN Armed Police Israel and Lebanon are expected to hold talks. Here’s what to know US, Iran set for peace talks but doubts emerge over Lebanon, sanctions Cotton Association revises output estimates for 2025-26 up at 324 lakh bales of 170 kg each Orbicular gets USFDA’s tentative nod for generic Semaglutide Injection in partnership with Apotex Malls, high-streets in NCR clock 45% rise in leasing of retail spaces in Jan-Mar: C&W FIIs pull ₹28,375 crore in five sessions; domestic buyers cushion fall as indices post best week in months Nifty and Bank Nifty Prediction for the week 13 Apr’26 to 17 Apr’26 by BL GURU Proposed Trump arch in Washington DC includes winged figure, eagles, lions and gold inscriptions 'Ladakh' replaces 'Jammu and Kashmir' in Aadhaar records for UT residents Misri ends US trip with focus on civil nuclear cooperation and LPG exports
India can save ₹2.27 lakh crore by easing renewable energ...
M Ramesh · 2026-06-15 · via Business News Today: Latest Business News, Finance News

India could save ₹2.27 lakh crore in power-system costs by relaxing renewable energy “build limits” by 50 per cent, according to a study conducted by the All India Discoms Association (AIDA).

Speaking at a wind industry conference in Goa on Sunday to mark Global Wind Day, Alok Kumar, Director General, AIDA and former Secretary, Ministry of Power, said that current power-sector planning assumptions place limits on the pace at which new renewable energy capacity can be added. Relaxing these “build limits” by 50 per cent would enable faster deployment of renewable energy projects and lower overall system costs, he said.

Build limits are assumptions used in power-system planning models to cap the amount of new generation capacity that can be added over a given period. The limits reflect factors such as project development timelines, supply-chain constraints, availability of land and transmission infrastructure, and the sector’s ability to absorb new capacity additions.

According to Kumar, a 50 per cent relaxation in these limits would require an additional capital expenditure of ₹1.24 lakh crore but would unlock operating cost savings of ₹3.51 lakh crore, resulting in a net saving of ₹2.27 lakh crore.

He further said that such a relaxation would eliminate the need to install about 22 GW of battery energy storage systems (BESS), reducing the overall cost of the power system.

Kumar said the proposal would require approval from the Central Electricity Authority (CEA), as build limits are part of the assumptions used in long-term power-system planning exercises.

The proposal to relax build limits drew an immediate response from Union Minister for New and Renewable Energy Prahalad Joshi, who was attending the event. Joshi said the Ministry would examine the suggestion in detail and directed Santosh Kumar Sarangi to study the proposal and its implications.

8 GW this year

The Indian wind industry expects to install 8 GW of fresh capacity in 2026-27, up from the record 6.05 GW added in 2025-26, according to Girish Tanti, President, the Indian Wind Turbine Manufacturers Association.

Speaking at a panel discussion during the Global Wind Day event, Tanti said the industry was confident of sustaining the momentum and scaling up annual installations to 10 GW in the following year.

The projections come amid growing expectations of stronger policy support, expansion of transmission infrastructure and increased demand for renewable energy from both utilities and commercial consumers.

Published on June 15, 2026