惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

WordPress大学
WordPress大学
酷 壳 – CoolShell
酷 壳 – CoolShell
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
腾讯CDC
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Jina AI
Jina AI
N
Netflix TechBlog - Medium
有赞技术团队
有赞技术团队
博客园 - 【当耐特】
MongoDB | Blog
MongoDB | Blog
P
Proofpoint News Feed
L
LangChain Blog
aimingoo的专栏
aimingoo的专栏
GbyAI
GbyAI
B
Blog
F
Fortinet All Blogs
T
Tailwind CSS Blog
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
G
Google Developers Blog
A
About on SuperTechFans
C
Check Point Blog
Microsoft Security Blog
Microsoft Security Blog
MyScale Blog
MyScale Blog
B
Blog RSS Feed

Business News Today: Latest Business News, Finance News

Markets’ dilemma: Trust the bark or wag of oil prices The sector call illusion Bandu’s Blockbusters For April 12, 2026 Mastering Derivatives: Does Lag Impact Effectiveness Of OI? Who Am I? April 12, 2026 Index Outlook: Rising From Dire Straits US Market Outlook: Gaining Strength Bullion Cues: Gold And Silver Futures Face Barrier F&O Tracker: Tentative Shift In Trend F&O Strategy: Buy L&T Put Maruti Suzuki to launch 4 EVs by 2031 India Inc flags surge in cost of packaging raw material, seeks relief measures India-flagged LPG tanker Jag Vikram crosses Strait of Hormuz after US-Iran ceasefire Muted pricing power, rising costs to curb benefits of demand in cement sector: HDFC Securities Iran's new supreme leader Mojtaba Khamenei has severe and disfiguring wounds, sources say No road tax, registration fees for electric vehicles priced up to ₹30 lakh till March 2030: Delhi’s draft EV policy Central Railway to run four special local trains for Ambedkar Jayanti West Asia tensions push up costs for India; further impact hinges on stability: Report ED initiates fresh raids against former Bengal minister Chatterjee in teacher recruitment scam Election Commission reverses Mittal’s DVAC posting, appoints him DGP, TN Armed Police Israel and Lebanon are expected to hold talks. Here’s what to know US, Iran set for peace talks but doubts emerge over Lebanon, sanctions Cotton Association revises output estimates for 2025-26 up at 324 lakh bales of 170 kg each Orbicular gets USFDA’s tentative nod for generic Semaglutide Injection in partnership with Apotex Malls, high-streets in NCR clock 45% rise in leasing of retail spaces in Jan-Mar: C&W FIIs pull ₹28,375 crore in five sessions; domestic buyers cushion fall as indices post best week in months Nifty and Bank Nifty Prediction for the week 13 Apr’26 to 17 Apr’26 by BL GURU Proposed Trump arch in Washington DC includes winged figure, eagles, lions and gold inscriptions 'Ladakh' replaces 'Jammu and Kashmir' in Aadhaar records for UT residents Misri ends US trip with focus on civil nuclear cooperation and LPG exports
CERC approves 3 pre-specified time slots for term ahead m...
2026-05-22 · via Business News Today: Latest Business News, Finance News
TAM on power exchanges provides products allowing participants to buy or sell electricity on a term basis for up to 90 days 

TAM on power exchanges provides products allowing participants to buy or sell electricity on a term basis for up to 90 days  | Photo Credit: JOTHI RAMALINGAM B

The Central Electricity Regulatory Commission (CERC) on Thursday approved three pre-specified time slots — round-the-clock (RTC), solar and non-solar — for the term ahead market (TAM) at power exchanges.

TAM on power exchanges provides a range of products allowing participants to buy or sell electricity on a term basis for a duration of up to 90 days.

The regulator was hearing petitions from Indian Energy Exchange (IEX), Power Exchange India (PXIL) and Hindustan Power Exchange (HPX) for approval of pre-specified slots TAM, Green TAM (G-TAM) and High Price TAM (HP-TAM) on their platforms.

‘Core intent’

The CERC said the “core intent” behind proposing pre-specified timeslots in TAM contracts is to align with the conditions specified in the Commission’s Orders (June 7, 2022 and December 13, 2022) and avoid the scope of any manipulation by restricting the slots to a fixed specification.

The Commission also informed that Grid India has proposed to structure the TAM contracts as “solar and non-solar hours” rather than “peak and off-peak”.

This is because a common four-hour peak hour slot cannot be defined at the national level for bidding at power exchanges because each State reaches its peak demand at a different time based on its demand curve, it added.

Besides, imposing uniform peak hours across all regions would hinder buyers from optimising their power procurement strategies with their actual demand profiles. Another factor is that region-wise peak hour slots will lead to liquidity fragmentation in TAM.

Grid India also said that low visibility of peak and off-peak hours for future months because peak and off-peak hours are declared only a month in advance by RLDCs, while power exchanges offer contracts in TAM up to 3 months in advance, CERC said.

The regulator said that it finds “merit” in Grid India’s suggestion for structuring TAM contracts based on solar and non-solar hours instead of peak and off-peak hours.

Slot structures

With regard to the various slot structures and recommendations submitted by all the power exchanges and stakeholders, the Commission has observed that while the exchanges and stakeholders have proposed region-specific peak hours, two-hourly delivery slots, and seasonally adjusted variations, such proposals are not aligned with the objectives of pre-specified time slots in TAM, GTAM and HPTAM envisaged in the order dated April 28, 2025, it added.

While the duration of RTC contracts is 24 hours, solar contracts duration will be from 6 AM to 6 PM and non-solar contracts from 6PM to 6AM.

“Broadly, we approve three types of pre-specified time slots for TAM contracts, namely, RTC, solar and non-solar contracts. Under solar and non-solar contracts, there shall be further classification of contracts… These time slots are based on the prevailing national solar and non-solar hours,” CERC said in the order.

It also directed Grid India to issue a detailed procedure for separately notifying solar and non-solar hours on a national basis, factoring in regional variation as far as possible.

“The directions to the power exchanges pertaining to pre-specified time slots for TAM/ HP-TAM/ GTAM (hydro) and GTAM (other than hydro) contracts shall come into effect within a week from the date of the order. However, all such contracts traded or entered into before the date of this order shall continue to be valid,” the CERC order said.

Published on May 22, 2026