惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

aimingoo的专栏
aimingoo的专栏
G
Google Developers Blog
B
Blog RSS Feed
A
About on SuperTechFans
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
V
V2EX
Stack Overflow Blog
Stack Overflow Blog
C
Check Point Blog
H
Hackread – Cybersecurity News, Data Breaches, AI and More
Engineering at Meta
Engineering at Meta
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
博客园 - 司徒正美
D
Docker
F
Fortinet All Blogs
Hugging Face - Blog
Hugging Face - Blog
Last Week in AI
Last Week in AI
H
Help Net Security
WordPress大学
WordPress大学
MyScale Blog
MyScale Blog
博客园 - Franky
人人都是产品经理
人人都是产品经理
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
Blog — PlanetScale
Blog — PlanetScale
L
LangChain Blog

Business News Today: Latest Business News, Finance News

Markets’ dilemma: Trust the bark or wag of oil prices The sector call illusion Bandu’s Blockbusters For April 12, 2026 Mastering Derivatives: Does Lag Impact Effectiveness Of OI? Who Am I? April 12, 2026 Index Outlook: Rising From Dire Straits US Market Outlook: Gaining Strength Bullion Cues: Gold And Silver Futures Face Barrier F&O Tracker: Tentative Shift In Trend F&O Strategy: Buy L&T Put Maruti Suzuki to launch 4 EVs by 2031 India Inc flags surge in cost of packaging raw material, seeks relief measures India-flagged LPG tanker Jag Vikram crosses Strait of Hormuz after US-Iran ceasefire Muted pricing power, rising costs to curb benefits of demand in cement sector: HDFC Securities Iran's new supreme leader Mojtaba Khamenei has severe and disfiguring wounds, sources say No road tax, registration fees for electric vehicles priced up to ₹30 lakh till March 2030: Delhi’s draft EV policy Central Railway to run four special local trains for Ambedkar Jayanti West Asia tensions push up costs for India; further impact hinges on stability: Report ED initiates fresh raids against former Bengal minister Chatterjee in teacher recruitment scam Election Commission reverses Mittal’s DVAC posting, appoints him DGP, TN Armed Police Israel and Lebanon are expected to hold talks. Here’s what to know US, Iran set for peace talks but doubts emerge over Lebanon, sanctions Cotton Association revises output estimates for 2025-26 up at 324 lakh bales of 170 kg each Orbicular gets USFDA’s tentative nod for generic Semaglutide Injection in partnership with Apotex Malls, high-streets in NCR clock 45% rise in leasing of retail spaces in Jan-Mar: C&W FIIs pull ₹28,375 crore in five sessions; domestic buyers cushion fall as indices post best week in months Nifty and Bank Nifty Prediction for the week 13 Apr’26 to 17 Apr’26 by BL GURU Proposed Trump arch in Washington DC includes winged figure, eagles, lions and gold inscriptions 'Ladakh' replaces 'Jammu and Kashmir' in Aadhaar records for UT residents Misri ends US trip with focus on civil nuclear cooperation and LPG exports
India’s data centre pipeline reaches 8.33 GW on AI and cl...
ANI · 2026-06-20 · via Business News Today: Latest Business News, Finance News
The surge in early-stage projects highlights strong investor confidence in India’s long-term digital economy growth and its positioning as a major global data centre destination.

The surge in early-stage projects highlights strong investor confidence in India’s long-term digital economy growth and its positioning as a major global data centre destination.

India’s data centre sector is witnessing an unprecedented infrastructure build-up, with the total development pipeline across major markets reaching 8.33 GW, according to Knight Frank India. The scale of future supply, driven by accelerating artificial intelligence adoption, cloud computing growth and data localisation requirements, is more than five times the country’s current live data centre capacity of 1.6 GW.

Knight Frank India said India currently has 0.32 GW of data centre capacity under construction, while another 2.92 GW has reached the committed stage. An additional 5.41 GW is in early stages of development, underscoring the depth of supply planned across key hubs.

“The significant share of early-stage developments--representing nearly two-thirds of the total pipeline--demonstrates strong confidence in India’s long-term digital economy prospects,” Knight Frank India noted.

Mumbai leads India’s data centre expansion with 3.75 GW pipeline

Mumbai continues to dominate the landscape with the largest pipeline at 3.75 GW, comprising 0.17 GW under construction, 1.54 GW in committed projects and 2.21 GW in early-stage development. The city’s advantage stems from its status as India’s financial capital, extensive fibre connectivity, robust power infrastructure and concentration of international subsea cable landings, making it the preferred location for large-scale cloud and AI deployments.

Hyderabad and Chennai emerge as key digital infrastructure hubs

Hyderabad has emerged as the second-largest future market with a 1.93 GW pipeline, supported by proactive government policies, lower operating costs and growing investments from global technology companies. Chennai’s pipeline has reached 1.36 GW, backed by its role as India’s key gateway for Southeast Asian digital traffic, strong subsea cable connectivity and competitive power tariffs.

Regional specialisation shapes India’s data centre growth story

Regional specialisation is becoming a key theme, Knight Frank India said. Viral Desai, International Partner, Senior Executive Director- Occupier Strategy & Solutions, Industrial & Logistics, Capital Markets & Retail, Knight Frank India, said, “India’s data centre growth story is increasingly becoming a tale of regional specialization. While Mumbai continues to anchor hyperscale deployments owing to its connectivity advantages, Hyderabad is emerging as a preferred AI infrastructure destination, and Chennai is strengthening its role as a strategic gateway for international data traffic from east. At the same time, Vizag has rapidly emerged as one of India’s most active greenfield data centre markets, attracting gigawatt-scale development proposals backed by government support, availability of sizeable land parcels and planned subsea cable connectivity.”

NCR, Pune and Bengaluru are also expanding capacity, with pipelines of 0.54 GW, 0.43 GW and 0.18 GW respectively. Knight Frank India expects India’s data centre ecosystem to remain one of the fastest-growing globally over the coming decade as global technology companies invest in next-generation computing infrastructure.

Published on June 20, 2026