惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

腾讯CDC
博客园 - Franky
MyScale Blog
MyScale Blog
L
LangChain Blog
Martin Fowler
Martin Fowler
Recent Announcements
Recent Announcements
Stack Overflow Blog
Stack Overflow Blog
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园 - 司徒正美
量子位
A
About on SuperTechFans
C
Check Point Blog
大猫的无限游戏
大猫的无限游戏
Last Week in AI
Last Week in AI
小众软件
小众软件
Apple Machine Learning Research
Apple Machine Learning Research
I
InfoQ
V
Visual Studio Blog
Vercel News
Vercel News
B
Blog
爱范儿
爱范儿
aimingoo的专栏
aimingoo的专栏
U
Unit 42

Business News Today: Latest Business News, Finance News

Markets’ dilemma: Trust the bark or wag of oil prices The sector call illusion Bandu’s Blockbusters For April 12, 2026 Mastering Derivatives: Does Lag Impact Effectiveness Of OI? Who Am I? April 12, 2026 Index Outlook: Rising From Dire Straits US Market Outlook: Gaining Strength Bullion Cues: Gold And Silver Futures Face Barrier F&O Tracker: Tentative Shift In Trend F&O Strategy: Buy L&T Put Maruti Suzuki to launch 4 EVs by 2031 India Inc flags surge in cost of packaging raw material, seeks relief measures India-flagged LPG tanker Jag Vikram crosses Strait of Hormuz after US-Iran ceasefire Muted pricing power, rising costs to curb benefits of demand in cement sector: HDFC Securities Iran's new supreme leader Mojtaba Khamenei has severe and disfiguring wounds, sources say No road tax, registration fees for electric vehicles priced up to ₹30 lakh till March 2030: Delhi’s draft EV policy Central Railway to run four special local trains for Ambedkar Jayanti West Asia tensions push up costs for India; further impact hinges on stability: Report ED initiates fresh raids against former Bengal minister Chatterjee in teacher recruitment scam Election Commission reverses Mittal’s DVAC posting, appoints him DGP, TN Armed Police Israel and Lebanon are expected to hold talks. Here’s what to know US, Iran set for peace talks but doubts emerge over Lebanon, sanctions Cotton Association revises output estimates for 2025-26 up at 324 lakh bales of 170 kg each Orbicular gets USFDA’s tentative nod for generic Semaglutide Injection in partnership with Apotex Malls, high-streets in NCR clock 45% rise in leasing of retail spaces in Jan-Mar: C&W FIIs pull ₹28,375 crore in five sessions; domestic buyers cushion fall as indices post best week in months Nifty and Bank Nifty Prediction for the week 13 Apr’26 to 17 Apr’26 by BL GURU Proposed Trump arch in Washington DC includes winged figure, eagles, lions and gold inscriptions 'Ladakh' replaces 'Jammu and Kashmir' in Aadhaar records for UT residents Misri ends US trip with focus on civil nuclear cooperation and LPG exports
Major hydropower expansion in J&K underway as Uri-I Stage...
By Gulzar Bhat · 2026-06-01 · via Business News Today: Latest Business News, Finance News
The project is being developed by NHPC at an estimated cost of over ₹2,700 crore and will feature two generating units of 120 MW each

The project is being developed by NHPC at an estimated cost of over ₹2,700 crore and will feature two generating units of 120 MW each | Photo Credit: NISSAR AHMAD

Construction activity gathered pace at the Uri-I Stage-II Hydroelectric Project in north Kashmir last week after engineers carried out the first controlled blast for excavation of an underground tunnel, marking the start of a major phase in the project’s development.

The hydropower project, coming up in north Kashmir’s Baramulla district, is expected to add 240 megawatts of electricity generation capacity to Jammu and Kashmir’s power sector once completed.

Officials associated with the project said the tunnel excavation work would facilitate the creation of critical underground structures required for power generation. 

The project is being developed by NHPC at an estimated cost of over ₹2,700 crore and will feature two generating units of 120 MW each. Authorities expect the project to strengthen the region’s power infrastructure and contribute to meeting the growing demand for electricity.

Power resources 

Jammu and Kashmir possesses vast hydropower resources, with an estimated generation potential of about 18,000 MW. Of this, nearly 14,900 MW has been identified for development, but less than a quarter has been tapped so far, reflecting the significant scope for expansion in the sector.

At present, the Union Territory has an installed hydropower capacity of around 3,540 MW spread across 31 operational projects managed by central and local agencies as well as independent power producers.

The government is seeking to substantially increase generation capacity through several large hydroelectric projects currently under construction. Four major projects with a combined capacity of more than 3,000 MW are expected to be commissioned by 2028, a move officials say could nearly double Jammu and Kashmir’s existing hydropower output and strengthen its energy security.

Reducing dependence on imports

Energy experts say the expansion of hydropower infrastructure is crucial for reducing the Union Territory’s dependence on electricity imports, particularly during peak demand periods. 

Official figures show that Jammu and Kashmir remains heavily dependent on power imports, during the winter months when electricity demand surges and local generation dips.  

In December, more than 95 per cent of the region’s electricity requirement was met through imports. During peak demand hours, power imports ranged between 2,900 MW and 3,100 MW, while imports during off-peak hours fluctuated between 2,400 MW and 2,800 MW.

“Additional hydropower capacity will help improve energy security and reduce dependence on electricity purchased from other states”, said the experts. 

They said that completion of projects such as 240 MW Uri would make meaningful contributions to the region’s power generation capacity. 

Published on June 1, 2026