惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园_首页
大猫的无限游戏
大猫的无限游戏
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
Apple Machine Learning Research
Apple Machine Learning Research
B
Blog
B
Blog RSS Feed
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
P
Proofpoint News Feed
MyScale Blog
MyScale Blog
Engineering at Meta
Engineering at Meta
量子位
H
Hackread – Cybersecurity News, Data Breaches, AI and More
T
Tailwind CSS Blog
Stack Overflow Blog
Stack Overflow Blog
N
Netflix TechBlog - Medium
T
The Blog of Author Tim Ferriss
U
Unit 42
aimingoo的专栏
aimingoo的专栏
博客园 - 叶小钗
博客园 - 【当耐特】
云风的 BLOG
云风的 BLOG
博客园 - Franky
博客园 - 聂微东

Business News Today: Latest Business News, Finance News

Markets’ dilemma: Trust the bark or wag of oil prices The sector call illusion Bandu’s Blockbusters For April 12, 2026 Mastering Derivatives: Does Lag Impact Effectiveness Of OI? Who Am I? April 12, 2026 Index Outlook: Rising From Dire Straits US Market Outlook: Gaining Strength Bullion Cues: Gold And Silver Futures Face Barrier F&O Tracker: Tentative Shift In Trend F&O Strategy: Buy L&T Put Maruti Suzuki to launch 4 EVs by 2031 India Inc flags surge in cost of packaging raw material, seeks relief measures India-flagged LPG tanker Jag Vikram crosses Strait of Hormuz after US-Iran ceasefire Muted pricing power, rising costs to curb benefits of demand in cement sector: HDFC Securities Iran's new supreme leader Mojtaba Khamenei has severe and disfiguring wounds, sources say No road tax, registration fees for electric vehicles priced up to ₹30 lakh till March 2030: Delhi’s draft EV policy Central Railway to run four special local trains for Ambedkar Jayanti West Asia tensions push up costs for India; further impact hinges on stability: Report ED initiates fresh raids against former Bengal minister Chatterjee in teacher recruitment scam Election Commission reverses Mittal’s DVAC posting, appoints him DGP, TN Armed Police Israel and Lebanon are expected to hold talks. Here’s what to know US, Iran set for peace talks but doubts emerge over Lebanon, sanctions Cotton Association revises output estimates for 2025-26 up at 324 lakh bales of 170 kg each Orbicular gets USFDA’s tentative nod for generic Semaglutide Injection in partnership with Apotex Malls, high-streets in NCR clock 45% rise in leasing of retail spaces in Jan-Mar: C&W FIIs pull ₹28,375 crore in five sessions; domestic buyers cushion fall as indices post best week in months Nifty and Bank Nifty Prediction for the week 13 Apr’26 to 17 Apr’26 by BL GURU Proposed Trump arch in Washington DC includes winged figure, eagles, lions and gold inscriptions 'Ladakh' replaces 'Jammu and Kashmir' in Aadhaar records for UT residents Misri ends US trip with focus on civil nuclear cooperation and LPG exports
Sensex today | Stock Market Live Updates: Stock to buy to...
2026-05-11 · via Business News Today: Latest Business News, Finance News

Citi Industry report, 6 May 2026 | Industry distillation

THE HEADLINE STORY

India is in its first-ever multi-vector capex upcycle — thermal + renewables + transmission + grid storage, all running in parallel. This isn’t a single-theme rally. It’s broader, more durable, and policy-anchored. 

GENCO capacity additions over FY26-32E are projected at 2.3-2.5x the FY19-25 levels.

━━━━━━━━━━━━━━

THIS CYCLE vs LAST CYCLE (FY04-12 vs FY24-32E)

The risk has fundamentally migrated:

•⁠ ⁠Old problem: 

Aggregate energy shortage, weak fuel supply, weak grids

•⁠ ⁠New problem: 

“Not enough dispatchable energy at the right hour” — non- solar-hour adequacy

•⁠ ⁠Old demand: 

Industrial capex (steel, cement, infra)

•⁠ ⁠New demand: 

Cooling, data centers, electrification, PLI manufacturing — broader base

•⁠ ⁠Old build: 

Coal IPPs (UMPPs, sub/supercritical)

•⁠ ⁠New build: Parallel buildout — RE + thermal + storage + transmission + nuclear

•⁠ ⁠Old risk: Fuel shortages, imported coal shocks, over-leverage, DISCOM insolvency

•⁠ ⁠New risk: Execution, dispatchability, contracting quality, weather sensitivity

•⁠ ⁠Old policy: Capacity expansion focus

•⁠ ⁠New policy: CEA resource adequacy plans, long-term transmission/generation plans

━━━━━━━━━━━━━━

⚡ DEMAND DYNAMICS

Long-term trajectory:

•⁠ ⁠~5% CAGR over past 2 decades

•⁠ ⁠Medium-term forecast: 5-6% CAGR

•⁠ ⁠FY26 saw weather-driven softness (~1% growth) — viewed as outlier, not trend break

•⁠ ⁠El Niño tailwinds expected in 2026 (boosts agri-pump + cooling demand)

Peak Demand Story:

•⁠ ⁠2010: ~119 GW → 2025: ~250 GW

•⁠ ⁠CEA expects 265-270 GW peak in 2026

•⁠ ⁠By FY32E: ~351 GW projected

NEW LOAD VECTORS driving the next leg:

1️⃣ Data Centers — currently ~1.5 GW IT load (Mumbai, Chennai, NCR, Bengaluru). Could reach 10-15+ GW by FY32/35, accounting for ~2.5-3% of national peak by 2030/32. Recently, DCs being granted DISCOM licenses.

2️⃣ Cooling load — AC penetration rising sharply

3️⃣ Electrification of end-uses traditionally on other fuels

4️⃣ EV charging

5️⃣ Green hydrogen — long-dated industrial layer

6️⃣ PLI-linked manufacturing — sticky industrial base

7️⃣ Energy security concerns post Middle East crisis

⚠️ Key shift: More demand is now weather-sensitive AND time-of -day sensitive — evening/night peaks now stress the system more than daytime.

Sectoral mix: Residential + Agri form a sizeable proportion → more weather-sensitive system overall.

━━━━━━━━━━━━━━━

SUPPLY MIX — WHERE THE MONEY IS GOING

Current state (FY26):

•⁠ ⁠Total installed capacity: ~533 GW (doubled since 2014)

•⁠ ⁠Non-fossil share: ~50% (~275 GW)

•⁠ ⁠Solar: 150 GW | Wind: 56 GW

•⁠ ⁠Coal: 222 GW | Gas: 20 GW | Hydro: 51 GW | Nuclear: 9 GW

CEA’s FY32 trajectory:

•⁠ ⁠Total capacity: ~821 GW (could go higher if demand surprises)

•⁠ ⁠Coal: ~272 GW | 

Solar: ~295 GW | 

Wind: ~97 GW | 

Nuclear: 15 GW

•⁠ ⁠RE share (incl hydro): rising from 27% → 35%

Capacity additions outlook:

•⁠ ⁠~44-45 GW/year over FY26E-32E

•⁠ ⁠vs ~19 GW/year over last 7 years

•⁠ ⁠That’s a ~2.3x step- up

⚫ COAL — Still very much alive:

•⁠ ⁠~97 GW additional coal capacity under construction or planned by 2032

•⁠ ⁠Coal generation rises from 1,250 BU (FY26E) → 1,536 BU (FY32E)

•⁠ ⁠Positioned as a reliability asset, not a growth asset

•⁠ ⁠Night-time peaks need dispatchable capacity

☀️ RENEWABLES — Largest incremental contributor:

•⁠ ⁠Solar nearly doubles by FY32E

•⁠ ⁠Wind grows from 56 → 97 GW

⚛️ NUCLEAR — Ambitious national plan:

•⁠ ⁠National target: 100 GW by 2047

•⁠ ⁠Capex guide: ~Rs200mn/MW

•⁠ ⁠Tariffs: Rs6-8/kWh under cost-plus RoE

•⁠ ⁠Long-duration assets (60-year life)

•⁠ ⁠Must-run status in merit order

🏔️ HYDRO + STORAGE:

•⁠ ⁠Hydro: 51 → 59 GW by FY32E

•⁠ ⁠Storage becoming the new “coal availability equivalent” of the last cycle

━━━━━━━━━━━━━━━

🔋 STORAGE — THE BREAKOUT THEME

CEA’s energy storage roadmap (cumulative):

•⁠ ⁠2026-27: BESS 6 GW + PSP 5 GW = 11 GW

•⁠ ⁠2030-31: BESS 28 GW + PSP 32 GW = 60 GW

•⁠ ⁠2035-36: BESS 80 GW + PSP 94 GW = 174 GW

Storage required to avoid peak deficit: ~10 GW by FY27E, ~11 GW by FY29E

Why it matters: Solar curtailment events between May-Dec 2025 highlighted the operational difficulty of integrating large RE volumes — daytime demand-supply mismatch, limited coal ramping, transmission bottlenecks.

CEA flags risk of Planning Reserve Margin turning negative in non-solar hours over FY27-29 if capacity slips.

━━━━━━━━━━━━━━━

🔌 TRANSMISSION — MASSIVE OPPORTUNITY

📋 Two major CEA plans frame the next leg:

Plan 1 — March 2026: “Transmission Plan for 900+ GW Non-Fossil by 2035-36”

•⁠ ⁠1,37,500 ckm of lines + 8,27,600 MVA substation capacity

•⁠ ⁠Cost: Rs7.93 trillion over FY27-FY36

•⁠ ⁠Focus: RE evacuation from Rajasthan, Gujarat, AP, Karnataka, Maharashtra

•⁠ ⁠Covers both ISTS and intra-state systems

Plan 2 — October 2025: “Brahmaputra Basin Hydro Evacuation Master Plan”

•⁠ ⁠65GW hydro + 11GW PSP in NE

•⁠ ⁠31,397 ckm lines + 109,935 MVA/MW capacity

•⁠ ⁠Cost: Rs6.43 trillion total

•⁠ ⁠~Rs1.9trn till 2035, Rs4.5trn beyond FY35

💰 Total transmission opportunity (industry view): ~Rs15 trillion over the long term when combining domestic + Brahmaputra + international interconnects.

Architecture shift: From incremental network additions → system architecture (765 kV, HVDC corridors, pooling stations, 1,200 kV future).

The principle: Transmission must be planned ahead of generation — line gestation is longer; delays cause curtailment, stranded assets, regional congestion.

━━━━━━━━━━━━━━━

💵 POWER PRICING & MARKETS

Mixed structure:

•⁠ ⁠Long-term PPAs (cost-plus or lowest-bid) — bulk of supply

•⁠ ⁠Regulated tariffs

•⁠ ⁠Merchant/exchange markets — growing

📊 IEX day-ahead snapshot (Apr-May 2026):

•⁠ ⁠Spot prices range from near-zero during surplus solar hours → near-ceiling levels during evening peaks

•⁠ ⁠Massive intraday price swings reflect the variable RE integration challenge

•⁠ ⁠Headline deficits have meaningfully reduced, BUT intra-day variations persist

━━━━━━━━━━━━━━━

DRAFT NATIONAL ELECTRICITY PLAN 2026 — KEY REFORMS

🏛️ Regulatory architecture:

•⁠ ⁠Electricity Act 2003 = foundation

•⁠ ⁠CEA = technical standards, planning

•⁠ ⁠CERC = inter-state tariffs/transmission

•⁠ ⁠SERCs = intra-state tariffs, DISCOMs

🎯 Resource Adequacy as formal planning discipline:

•⁠ ⁠CEA: long-term national demand forecasts (annual review)

•⁠ ⁠SLDCs: state-level forecasts

•⁠ ⁠Resource Adequacy Plans at national + state + DISCOM levels

Fixing DISCOMs & industrial competitiveness:

•⁠ ⁠Timely tariff orders (before FY start; true-up within FY; conclude in 120 days)

•⁠ ⁠From FY27: fully cost-reflective tariffs, no regulatory assets, index-linked auto- revision if delayed

•⁠ ⁠Monthly pass-through of power purchase costs

•⁠ ⁠Cross-subsidy reduction — no tariff below 50% of ACoS

•⁠ ⁠Free power should be avoided; subsidies paid in advance

•⁠ ⁠Target: single-digit AT&C losses

•⁠ ⁠Solarisation of agri feeders by 2030

•⁠ ⁠Pro-competition stance — relief for large users (manufacturing, railways/metro)

DISCOM risk has moved from broad insolvency → more nuanced, selective. SECI and central structures remain important buffers.

━━━━━━━━━━━━━━━

CAPEX FUNDING — WHERE THE CAPITAL FLOWS

•⁠ ⁠Mix: corporate balance sheets + project finance debt + dedicated infra lenders

•⁠ ⁠Typical D:E for projects: 70:30 or 80:20

•⁠ ⁠Equity from internal accruals + own books

Critical RBI data point:

•⁠ ⁠Power sector’s share of total bank/FI capex tie-up funding jumped to 40% in FY25 (vs 24% in FY24, 20% in FY23)

•⁠ ⁠This happened even as overall capex tie-ups fell — meaning power is gaining clear preferential allocation

Sectoral breakdown of bank/FI capex funding (FY25):

•⁠ ⁠Power: 40%

•⁠ ⁠Roads & bridges: 9%

•⁠ ⁠Construction: 6%

•⁠ ⁠Metals: 5%

•⁠ ⁠Electrical equipment: 5%

•⁠ ⁠Others: 34% ━━━━━━━━━━━━━━━

🎯 KEY TRENDS TO WATCH

✅ Bullish drivers:

•⁠ ⁠Multi-vector capex visibility (rare in Indian power)

•⁠ ⁠Policy anchors providing long-duration support

•⁠ ⁠Data center buildout creating local grid pressure points

•⁠ ⁠Storage emerging as a major new investment theme

•⁠ ⁠Transmission entering structurally larger investment phase

•⁠ ⁠Nuclear becoming a real opportunity, not just aspiration

⚠️ Key risks for the sector:

•⁠ ⁠Execution slippages (transmission RoW, RE land/grid connectivity)

•⁠ ⁠Sustained unfavorable demand variability (weather-linked)

•⁠ ⁠Adverse regulatory developments

•⁠ ⁠PPA-less RE pipeline conversion failure

•⁠ ⁠Storage tariff design / bankability of storage contracts

•⁠ ⁠Input cost volatility (especially under TBCB transmission tariffs)

•⁠ ⁠Vendor concentration in transformers/reactors/HVDC equipment

━━━━━━━━━━━━━━━

🧭 BOTTOM LINE

India’s power sector has shifted from a “not enough energy” problem to a “not enough flexible, dispatchable energy at the right hour” problem. 

Capital is flowing into a parallel buildout — thermal restart, RE scale-up, transmission rebound, and the first real storage wave — anchored by policy. Demand base is broader, weather- sensitive, and time-of -day sensitive. The next decade is about execution and architecture, not aggregate capacity.