惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

罗磊的独立博客
L
LangChain Blog
aimingoo的专栏
aimingoo的专栏
IT之家
IT之家
B
Blog
博客园_首页
博客园 - 司徒正美
有赞技术团队
有赞技术团队
博客园 - 聂微东
I
InfoQ
美团技术团队
GbyAI
GbyAI
阮一峰的网络日志
阮一峰的网络日志
H
Help Net Security
大猫的无限游戏
大猫的无限游戏
MyScale Blog
MyScale Blog
WordPress大学
WordPress大学
The GitHub Blog
The GitHub Blog
A
About on SuperTechFans
人人都是产品经理
人人都是产品经理
Microsoft Azure Blog
Microsoft Azure Blog
Engineering at Meta
Engineering at Meta
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
The Cloudflare Blog

Futurism

Light Pollution is Causing Fish to Live Miserable, Bitter Lives, Researchers Find Massive Data Center Cooks Nearby Residents Alive Amidst Deadly Heatwave We've Blown So Far Past a Doomer 2014 Climate Project That It's Scary All But Five US States Are Currently Experiencing Droughts Government Scientists Fired by Trump Launch New Website for Sharing Climate Data Mass Deaths Attributed to Brutal Heat Wave Trump's Reflecting Pool Is No Match for the AlgaeBTQ Agenda Scientists Say New Method Turns Coffee Grounds Into High-Potency Renewable Fuel Illinois Is Getting Battered by Freak Tornadoes Musk Furious After SpaceX Stock Gets Worst Possible Report Card Volunteer Under Investigation for Cleaning Polluted River Without a License, Faces Two Years in Prison Weather So Brutal That Dean Passes Out at College Graduation Out-of-Control Icebergs Are Wreaking Havoc on the Oceans The Funniest Possible Thing Happened After Trump Painted the Lincoln Reflecting Pool Blue Scientists Detected Strange Rumbling Beneath Utah Almost 50 Years Ago. They Just Figured Out What It Was Earth's Underground Fungus Network Is So Gigantic That If You Stretched It Out, It Would Reach to Other Star Systems Scientists Horrified as Huge Heatwave Hits Antarctica Autonomous Robots Confirmed to Have Killed Human Soldiers The El Niño Situation Is Looking Absolutely Brutal Fish Already Cooking Alive Across the US Ahead of Blistering Summer Heat Temperatures Soaring So High That Trump’s UFC Fighters May Just Collapse in the Heat Solar Just Produced More Electricity Than Coal for the First Time in the History of the United States California Primed for Apocalyptic Earthquake, Geological Research Finds Scientists Detect Massive Structure Under Antarctica New Study Finds Something Horrible Contaminating Half of California’s Water Remember How Sucking Carbon Out of the Air Was Going to Save the Planet? We Have Terrible News Trump Desperately Pumps Money Into Dying Coal Industry AI Will Consume as Much Water as a Billion People By 2030, UN Report Estimates Kevin O’Leary Pleads With Locals to Allow His Massive Data Center If He Shrinks It Down to the Size of One Manhattan People Are Not Happy About Google’s Plan to Release Millions of Bioengineered Mosquitoes Into the Wild
Almost Half of US Data Centers That Were Supposed to Open...
2026-04-02 · via Futurism

A hand holding a pair of large silver scissors is cutting a red ribbon held by another hand against a bright yellow background. The image has a vibrant, high-contrast color effect.

Illustration by Tag Hartman-Simkins / Futurism. Source: Getty Images

Sign up to see the future, today

Can’t-miss innovations from the bleeding edge of science and tech

The data centers powering your favorite AI chatbot are running low on helium, cash, and neighbors who don’t hate them, and that’s not even the worst of it.

According to reporting by Bloomberg, about half of the data centers slated to open in the US in 2026 will either face delays or outright cancellations.

The publication interviewed analysts at market intelligence company Sightline Climate, which in research first flagged by Ed Zitron last week noted that 12 gigawatts worth of power-consuming data centers are set to open in the US this year. But here’s the catch: they say only a third of those are actually under construction right now, with the rest in a liminal pre-production stage in which they could, and likely will be, canceled.

It’s not just a problem for data centers planned for 2026, either. Among data centers slated to open in 2027, only about 6.3 gigawatts worth of computing infrastructure are actually under construction, compared to 21.5 announced gigawatts.

Things get even dodgier in the coming years, with the vast majority of data centers planned for launch between 2028 and 2032 having yet to even break ground. There are a further 37 gigawatts of planned infrastructure which haven’t even received a firm completion date, only 4.5 of which have actually begun work.

Those delays, it seems, are due to a key bottleneck: electrical components manufactured abroad. Batteries, electrical transformers, and circuit breakers all make up less than 10 percent of the cost to construct one data center, but as Andrew Likens, energy and infrastructure lead at Crusoe’s told Bloomberg, it’s impossible to build new data centers without them.

“If one piece of your supply chain is delayed, then your whole project can’t deliver,” Likens said. “It is a pretty wild puzzle at the moment.”

As demand for those components far outpaces supply in the US, data center firms have had to source those components from manufacturers in Canada, Mexico, South Korea, and China. That leads to longer build times as those complicated parts are sewn together with assemblages of other, smaller parts, before being shipped across the ocean, and eventually trucked to the final construction site.

“We’ve seen firsthand the value it can create if you are not hamstrung by electrical infrastructure lead times,” Crusoe’s Likens told Bloomberg. “They can make or break a project.”

More on data centers: Data Centers Causing Huge Temperature Spikes for Miles Around Them, Study Suggests