惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Martin Fowler
Martin Fowler
J
Java Code Geeks
博客园 - 【当耐特】
宝玉的分享
宝玉的分享
腾讯CDC
D
DataBreaches.Net
Microsoft Azure Blog
Microsoft Azure Blog
Engineering at Meta
Engineering at Meta
V
V2EX
F
Fortinet All Blogs
MyScale Blog
MyScale Blog
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
T
Tailwind CSS Blog
Jina AI
Jina AI
GbyAI
GbyAI
大猫的无限游戏
大猫的无限游戏
A
About on SuperTechFans
酷 壳 – CoolShell
酷 壳 – CoolShell
爱范儿
爱范儿
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
U
Unit 42
B
Blog
M
MIT News - Artificial intelligence
N
Netflix TechBlog - Medium

Interesting Engineering

US firm to scale laser-based nuclear fusion ‘breakthrough’ with new partnership Military Archives - Interesting Engineering World’s first non-nuclear lead-cooled reactor to generate electricity begins installation US scientists devise new process to turn sewage sludge into 99% pure natural gas US firm unveils submarine-hunting drone with 9,200-mile-range, 35 mph top speed Military Archives - Interesting Engineering Supercomputer finds lithium-titanium tweak to boost sodium-ion batteries for grids Lockheed Martin demonstrates vertical launch missile system for mobile drone defense China’s 1116 MWe Taipingling Unit 1 reactor goes online, set to generate 9bn kWh yearly ChatGPT Images 2.0 update combines reasoning, research, and design with 2K output US Navy tests plug-and-play laser system on USS Bush carrier, downs drones at sea China’s CATL reveals 621-mile EV battery, under-7-minute charging to challenge BYD US uses world’s first exascale supercomputer to model supernovae, fusion reactors AI and Robotics Archives - Interesting Engineering First-in-human study confirms safety of graphene-based brain interface Tesla’s Optimus humanoid robot greets runners, poses for photos at Boston Marathon Interlocking materials offer high strength and flexibility for robotics, infrastructure US redeploys 100,000-ton nuclear-powered aircraft carrier in Red Sea after repairs US scientists unveil concept for ‘world’s first neutrino laser’ to unlock breakthroughs New military tech can maintain communication in contested electronic warfare environments Got a dark personality? Psychologists can help you choose your career wisely Humidity boosts performance of 3D-printed nanogenerator instead of degrading it China demonstrates microwave beam that recharges drones in flight, continues power delivery Scientists run compact free-electron laser for eight hours, cracks FEL stability problem China’s PLA considers to use minelaying underwater drones to enforce Taiwan blockade: Report 1-ton sharks may struggle for survival in waters exceeding 62.6°F, study suggests US firm’s thorium nuclear fuel bundles move to manufacturing for commercial reactors Tesla hits 0% charge in remote Chilean desert as YouTuber uses hood-mounted solar Humanoid robot surpasses human world record in Beijing half-marathon, clocking 50:26 mins New method extracts maximum work from unknown quantum states using symmetry tricks
Bill Gates-backed startup boosts US nuclear push with 345...
Neetika Walt · 2026-04-24 · via Interesting Engineering

Construction has officially begun on TerraPower’s Kemmerer Unit 1 in Wyoming, marking a key step in the company’s push to build what it describes as the United States’ first utility-scale advanced nuclear power plant.

The Natrium-based facility follows regulatory clearance and years of site preparation.

The project comes after the U.S. Nuclear Regulatory Commission issued a construction permit for the plant.

TerraPower said early site work had already started in 2024, but this phase represents the formal start of full-scale construction activity at the site.

The Kemmerer facility is designed around TerraPower’s Natrium reactor concept, which combines a sodium-cooled fast reactor with an integrated energy storage system.

The company says the design is aimed at providing flexible power output for grid demand.

According to the company, the project is being developed under the U.S. Department of Energy’s Advanced Reactor Demonstration Program, a public-private initiative supporting next-generation nuclear systems.

Wyoming energy push

Wyoming officials framed the development as part of the state’s long energy history and its role in uranium production and power generation.

“This is the moment our industry has been working toward for a generation. We’re not just breaking new ground on a first-of-a-kind nuclear plant in Wyoming; we’re building the next generation of America’s energy infrastructure,” said Chris Levesque, president and CEO of TerraPower.

“The Natrium plant will deliver reliable and dispatchable power to the grid and Kemmerer Unit 1 will serve as a commercial blueprint to mobilize a fleet of Natrium plants across the country and around the world.”

“The start of construction on TerraPower’s Natrium plant in Kemmerer marks a major milestone not just for Wyoming, but for the future of American energy,” said Wyoming Governor Mark Gordon.

“Wyoming has long powered this country, and today we are leading again, this time in next-generation nuclear technology.”

Workforce build begins

TerraPower said around 1,600 construction workers will be mobilized during peak building activity, with about 250 permanent jobs expected once the plant becomes operational.

The Natrium system includes a 345-megawatt sodium-cooled reactor paired with molten salt-based energy storage.

The storage system is designed to allow the plant to increase output to 500 megawatts during peak demand periods.

The project has support from federal agencies and industry partners involved in nuclear development and construction.

“The United States needs more reliable baseload power now,” said U.S. Senator John Barrasso.

“As the country’s number one producer of uranium, Wyoming is the perfect place to build TerraPower’s advanced nuclear reactor.”

“Today’s construction milestone is a testament to the Department of Energy’s investment in American innovation,” said Dr. Rian Bahran, Deputy Assistant Secretary for the U.S. Department of Energy’s Office of Nuclear Energy.

“The Natrium reactor shows that when government and private industry work together, we can build a bright future for our country powered by nuclear.”

TerraPower said the Kemmerer plant is expected to serve as a reference model for future Natrium deployments in the U.S. and abroad.

The company has also referenced commercial partnerships aimed at expanding deployment timelines into the next decade.

The Kemmerer Unit 1 project remains under active construction, with full operational timelines yet to be finalized.

The Blueprint

Get the latest in engineering, tech, space & science - delivered daily to your inbox.

With over a decade-long career in journalism, Neetika Walter has worked with The Economic Times, ANI, and Hindustan Times, covering politics, business, technology, and the clean energy sector. Passionate about contemporary culture, books, poetry, and storytelling, she brings depth and insight to her writing. When she isn’t chasing stories, she’s likely lost in a book or enjoying the company of her dogs.