惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

美团技术团队
T
The Blog of Author Tim Ferriss
月光博客
月光博客
阮一峰的网络日志
阮一峰的网络日志
Engineering at Meta
Engineering at Meta
量子位
I
InfoQ
Jina AI
Jina AI
Microsoft Security Blog
Microsoft Security Blog
H
Help Net Security
H
Hackread – Cybersecurity News, Data Breaches, AI and More
G
Google Developers Blog
J
Java Code Geeks
Recent Announcements
Recent Announcements
aimingoo的专栏
aimingoo的专栏
小众软件
小众软件
V
V2EX
腾讯CDC
P
Proofpoint News Feed
A
About on SuperTechFans
爱范儿
爱范儿
U
Unit 42
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
Last Week in AI
Last Week in AI

Interesting Engineering

US firm to scale laser-based nuclear fusion ‘breakthrough’ with new partnership Military Archives - Interesting Engineering World’s first non-nuclear lead-cooled reactor to generate electricity begins installation US scientists devise new process to turn sewage sludge into 99% pure natural gas US firm unveils submarine-hunting drone with 9,200-mile-range, 35 mph top speed Military Archives - Interesting Engineering Supercomputer finds lithium-titanium tweak to boost sodium-ion batteries for grids Lockheed Martin demonstrates vertical launch missile system for mobile drone defense China’s 1116 MWe Taipingling Unit 1 reactor goes online, set to generate 9bn kWh yearly ChatGPT Images 2.0 update combines reasoning, research, and design with 2K output US Navy tests plug-and-play laser system on USS Bush carrier, downs drones at sea China’s CATL reveals 621-mile EV battery, under-7-minute charging to challenge BYD US uses world’s first exascale supercomputer to model supernovae, fusion reactors AI and Robotics Archives - Interesting Engineering First-in-human study confirms safety of graphene-based brain interface Tesla’s Optimus humanoid robot greets runners, poses for photos at Boston Marathon Interlocking materials offer high strength and flexibility for robotics, infrastructure US redeploys 100,000-ton nuclear-powered aircraft carrier in Red Sea after repairs US scientists unveil concept for ‘world’s first neutrino laser’ to unlock breakthroughs New military tech can maintain communication in contested electronic warfare environments Got a dark personality? Psychologists can help you choose your career wisely Humidity boosts performance of 3D-printed nanogenerator instead of degrading it China demonstrates microwave beam that recharges drones in flight, continues power delivery Scientists run compact free-electron laser for eight hours, cracks FEL stability problem China’s PLA considers to use minelaying underwater drones to enforce Taiwan blockade: Report 1-ton sharks may struggle for survival in waters exceeding 62.6°F, study suggests US firm’s thorium nuclear fuel bundles move to manufacturing for commercial reactors Tesla hits 0% charge in remote Chilean desert as YouTuber uses hood-mounted solar Humanoid robot surpasses human world record in Beijing half-marathon, clocking 50:26 mins New method extracts maximum work from unknown quantum states using symmetry tricks
World’s largest: Japan plans 1 GW floating offshore wind ...
Mrigakshi Di · 2026-04-27 · via Interesting Engineering

The Tokyo Metropolitan Government has announced an ambitious plan to build the world’s largest floating offshore wind farm off the Izu island chain. 

Aiming for completion by 2035, the project is designed to produce at least 1 gigawatt (GW) of power to supply both the islands and mainland Tokyo.

Currently, the world’s largest operational floating farm is in Norway, but it produces less than 100 megawatts. Tokyo’s vision is ten times that size. If achieved, this power output is roughly equivalent to that of one nuclear reactor. 

To keep the momentum going on the Izu Islands project, the Tokyo Metropolitan Government is reportedly launching field surveys to analyze the region’s seabed topography and local weather patterns.

The bold plan

Compared to offshore wind farms drilled into the seabed, floating wind farms use buoyant platforms that float on the water’s surface, secured by a complex system of mooring lines and anchors. 

This design is gentler on the marine environment during installation because it avoids the heavy seafloor excavation and pile-driving required for “bottom-fixed” structures.

To bridge the gap between the ocean and the consumer, the energy captured by these floating giants is converted into electricity and transmitted via high-voltage subsea cables.

These cables are laid directly along the ocean floor, forming a hidden power artery that connects remote maritime sites to both local island communities and the mainland power grid.

Governor Yuriko Koike first introduced this vision at COP29 in 2024. Since fiscal 2025, the government has been actively consulting with local residents and the fishing and shipping industries across the affected island municipalities to navigate the project’s logistical and social impacts. 

Reportedly, the project focuses on a quintet of island communities, spanning Oshima, Niijima, Kozushima, Miyake, and Hachijo.

May stretch beyond 2035

But the path to 2035 is steep.

To bolster the project’s momentum, the Tokyo government tripled its fiscal 2026 budget to 2.7 billion yen ($17 million), specifically targeting comprehensive wind studies and seabed soil analysis for cable routing. 

However, the path to commercialization remains rocky; while the central government prepares to open bidding for construction and operations, officials warn of mounting skepticism from the private sector. 

Potential contractors are increasingly wary of the market, citing concerns over the project’s long-term profitability and the high risks associated with offshore entry.

In 2025, Mitsubishi Corp. pulled out of major wind projects in northern Japan. The reasons were familiar: soaring material costs and a weaker yen. 

While the national government views offshore wind as a pillar of its 2050 net-zero goal, the Izu region is currently only classified as a preparation zone — the earliest stage of development. 

Critics suggest the 2035 target is unrealistic, noting that offshore projects typically take over a decade to complete and that this project is still in its infancy. 

The South China Morning Post reported that analysts note that while the capacity may match that of a nuclear reactor (1 GW), the actual output will likely be much lower (roughly 40 percent capacity for wind vs. 80-90 percent for nuclear).

Coupled with the Izu region’s naturally high wind speeds, the initiative directly supports Japan’s national mandate to achieve 45 gigawatts of offshore wind capacity by 2040, making it a strategic fit for the country’s broader energy transition.

According to the expert, floating turbines represent a tiny fraction of wind power installations worldwide, with Japan still trailing behind Europe’s more advanced technological lead in the sector.

The Blueprint

Get the latest in engineering, tech, space & science - delivered daily to your inbox.

Mrigakshi is a science journalist who enjoys writing about space exploration, biology, and technological innovations. Her work has been featured in well-known publications including Nature India, Supercluster, The Weather Channel and Astronomy magazine. If you have pitches in mind, please do not hesitate to email her.