惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

MyScale Blog
MyScale Blog
Jina AI
Jina AI
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
阮一峰的网络日志
阮一峰的网络日志
P
Proofpoint News Feed
Last Week in AI
Last Week in AI
博客园 - 司徒正美
Martin Fowler
Martin Fowler
T
Tailwind CSS Blog
B
Blog RSS Feed
Vercel News
Vercel News
博客园 - 聂微东
I
InfoQ
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
M
MIT News - Artificial intelligence
Recent Announcements
Recent Announcements
GbyAI
GbyAI
L
LangChain Blog
酷 壳 – CoolShell
酷 壳 – CoolShell
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
Microsoft Security Blog
Microsoft Security Blog
C
Check Point Blog
MongoDB | Blog
MongoDB | Blog
B
Blog

The Register - On-Prem: Systems

Qualcomm teases agentic CPUs and smartphones Fujitsu says quantum and AI will replace mainframes in 2035 ZTE & China's NCRC partner for smart interventional medicine Core Scientific accelerates crypto-to-AI pivot Meta to use millions of AWS Graviton cores AI now gobbling up power and management chips for servers Tesla stakes AI dreams on Intel's unfinished AI chip SK Hynix breaks ground on Indiana advanced packaging plant Datacenter boom keeps dirty coal plants alive in the US AMD's Ryzen 9 9950X3D2 Dual Edition tested World's blandest man steps down from CEO job to spend more time in tastefully appointed home World's blandest man steps down from CEO job Intel eases reliance on TSMC with 'Merica-made Core Series 3 processors Intel eases reliance on TSMC with Core Series 3 CPUs Guide to GPU virtualization: passthrough, vGPU, and MIG Guide to GPU virtualization: passthrough, vGPU, and MIG Orbital datacenter startup admits launch economics don't fly AI-powered mainframe exits are a bubble set to pop Cloud-smart strategy helps Interactive meet GenAI demands Oracle taps Bloom for fuel cells to support datacenter binge UK signs Rolls-Royce SMR design deal Japan going back to the future by reviving its chip industry Japan going back to the future by reviving its chip industry AWS ponders selling its home-grown chips by the rack-load Supply chain challenges risk delaying Nvidia's Rubin GPUs Supply chain challenges risk delaying Nvidia's Rubin GPUs Supermicro investigating alleged China chip smuggling Intel trapped in Elon's reality distortion field UALink delivers 2.0 spec before v. 1.0 silicon ships OpenInfra General Manager on sovereignty and kill switches
Oracle taps Bloom for fuel cells to support datacenter binge
Dan Robinson Dan Robinson · 2026-04-15 · via The Register - On-Prem: Systems

Systems

Oracle taps Bloom for 2.8 GW of fuel cells to keep datacenter binge going

With grid hookups slow and turbines scarce, on-site power is starting to look less optional

Bloom Energy says it has an expanded remit from Oracle to provide the energy for its US datacenter buildout plans with up to 2.8 GW of fuel cell systems.

Big Red has already contracted for an initial 1.2 GW of capacity, according to Bloom, with deployment already underway this year and likely to continue into 2027.

This builds on an agreement drawn up last year, under which Bloom claims it delivered a fully operational fuel cell system to power an Oracle Cloud Infrastructure (OCI) site in just 55 days, rather than the 90 days stipulated.

Oracle has agreed to a network of humongous server farms thanks to arrangements such as the $300 billion contract signed with OpenAI to provide it with infrastructure for AI processing. This will equate to roughly 4.5 GW of compute capacity over the next five years, if all goes according to stated plan.

But others are also joining in the datacenter build boom, and America's creaking power grid is struggling to keep up with the unanticipated extra demand for electricity. Requests for connection to the electricity grid may face a seven-year wait, for example – although the energy secretary last year took steps to try to address this.

One answer is for server farms to generate their own energy on-site, as expounded by energy infrastructure biz Schneider Electric some time ago. The typical solution is to use gas turbines, as Elon Musk's xAI did at its Colossus campus. However, there is such high demand for this equipment that there is now a shortage, leaving customers facing long lead times.

Fuel cells are another option, but they can be expensive to deploy – partly because some types use costly catalyst materials – and if hydrogen is used as the fuel, it introduces storage, infrastructure, and safety challenges.

Bloom says its expanded deal with Oracle reflects a shift toward distributed, on-site generation as a critical component of modern digital infrastructure, as fuel cell systems can be deployed faster than traditional power solutions and reduce project risk.

The Register asked both companies how much this new contract is worth. We also asked for confirmation of whether the fuel cells are using hydrogen or natural gas, and whether this is supplied to the Oracle sites by truck or pipeline. We will update this article if we receive a response.

Oracle was recently in the headlines over warnings that its datacenter spending commitments could lead to price hikes for customers, and reports that it and OpenAI had ditched plans to expand their flagship Stargate facility at Abilene, Texas, over financing issues and OpenAI's "inability to forecast demand effectively." ®