惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

阮一峰的网络日志
阮一峰的网络日志
Apple Machine Learning Research
Apple Machine Learning Research
量子位
D
DataBreaches.Net
云风的 BLOG
云风的 BLOG
博客园 - 聂微东
博客园_首页
D
Docker
博客园 - 叶小钗
S
SegmentFault 最新的问题
大猫的无限游戏
大猫的无限游戏
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
J
Java Code Geeks
H
Hackread – Cybersecurity News, Data Breaches, AI and More
A
About on SuperTechFans
博客园 - 三生石上(FineUI控件)
F
Fortinet All Blogs
小众软件
小众软件
aimingoo的专栏
aimingoo的专栏
爱范儿
爱范儿
腾讯CDC
罗磊的独立博客
雷峰网
雷峰网
博客园 - Franky

News - Globes

Quantum computing co Q-Factor raises $24m Boaz Levy to become Israel Aerospace chair Banks' efficiency drives spark worker unrest Teva acquires Emalex Biosciences for up to $900m Gasoline prices to rise again Thursday night Deputy budget commissioner warns on �trauma economy� Israel drops key demand on Wizz Air hub Gedera house sells for NIS 5.53m Huge Crusoe Afula deal boosts Israel’s data centers sector Quantum Art extends Series A financing to $140m "Globes" poll of polls shows Beyachad brings opposition no gain Nvidia leases space for labs in Rishon Lezion Shekel-sterling rate heading below NIS 4/£ Shapir mulls buying control of Ashdod Refinery for NIS 1b Banks ask court to declare Nochi Dankner bankrupt Strong semiconductor sentiment boosts Ceva Yair Lapid and Naftali Bennett merge parties Supreme Court orders financial sanctions for draft evaders Israeli tech employees hold stock options worth NIS 150b Home price gap narrows between Tel Aviv and nearby cities Meta to lay off 100 employees in Israel EU regulator extends advisory not to fly to Israel Lyft buys Gett's London taxi-hailing operation Mobileye up sharply after beating analysts on Q1 Cyera buys Israeli startup Ryft for over $100m Israir to launch Israel-US flights in summer Ondas Israel unit to protect World Cup venues from drones Elbit awarded $200m IDF airborne munitions deal Study: IDF Talpiot program excels in producing entrepreneurs Israel's population grew 1.4% over past year
Tamar gas field boosts production by 45%
Idan Eretz · 2026-06-16 · via News - Globes

The Tamar field is Israel’s second largest in terms of gas reserves but is now the largest in terms of production.

Israel’s Tamar offshore gas field has boosted production 45% to 16 billion cubic meters (BCM) of natural gas annually, which slightly exceeds the 15.8 BCM annual production from the Leviathan field. This is the first time that annual production at the Tamar gas field will have surpassed the far larger Leviathan offshore gas field. Tamar Partners Tamar Petroleum (TASE: TMRP) and Isramco (TASE: ISRA) saw their share prices rising sharply on the Tel Aviv Stock Exchange (TASE) today.

The expansion of production at the Tamar field was achieved at an investment of $664 million and included, laying a third 150 kilometer gas pipeline from the reservoir to the production platform in Ashdod, as well as upgrading compressors at the production facility itself. The project was carried out by Chevron, Tamar’s operator, which also operates the Leviathan field.

The work was carried out during the most recent war with Iran, while the international contractors of the Tamar reservoir continued to work even during the war, while the Tamar field was the only one producing gas, due to the Ministry of Energy's order to stop gas production from the Leviathan and Karish fields for over a month.

The significance of increasing Tamar's production capacity is that in the event of war, the Tamar reservoir will be able to supply a larger amount of gas to the domestic economy, thus relying less on coal and diesel as emergency fuels.

Competition for gas agreements with new power plants

The Tamar reservoir is Israel’s second largest in terms of gas reserves but is now the largest in terms of the rate of production for Israeli consumers, according to the Gas Authority's 2025 report. 47% of gas for power plants and local factories comes from the Tamar field, followed by 41% from the smaller Karish field, and just 12% from Leviathan.

In terms of exports, Leviathan supplies the vast majority (74%) of the gas, mainly to Egypt and the rest to Jordan, while the Tamar reservoir supplies only 26% of exports.

A number of gas-fired power plants are expected to be built in Israel in the coming years, and not all of them have yet signed gas agreements. OPC Energy (TASE: OPCE) will build a power plant in Hadera and has not yet signed a gas agreement, and Dorad (Luzon, the State and others) and Reindeer (Generation Capital) are competing for the additional space in the electricity grid, which will also have to sign gas agreements soon.

The Leviathan field has also expanded production to 15.8 BCM per year, which is significantly higher than the initially planned (14 BCM). Due to the agreement between the Leviathan reservoir and the state for export to Egypt, Leviathan is committed to selling at a relatively cheap price to the domestic economy, which means that both fields are competing to sign gas agreements with the new power plants.

In addition, the Tamar field also has an export contract with Egypt and will increase gas exports once the new gas pipeline between Israel and Egypt is built, in Nitzana. A few months ago, all of the gas fields in Israel signed their share of the investment for the development of the pipeline, and it is currently under construction.

Published by Globes, Israel business news - en.globes.co.il - on June 16, 2026.

© Copyright of Globes Publisher Itonut (1983) Ltd., 2026.