惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

P
Proofpoint News Feed
博客园_首页
WordPress大学
WordPress大学
大猫的无限游戏
大猫的无限游戏
有赞技术团队
有赞技术团队
阮一峰的网络日志
阮一峰的网络日志
Hugging Face - Blog
Hugging Face - Blog
博客园 - 【当耐特】
酷 壳 – CoolShell
酷 壳 – CoolShell
Y
Y Combinator Blog
Vercel News
Vercel News
The GitHub Blog
The GitHub Blog
T
The Blog of Author Tim Ferriss
云风的 BLOG
云风的 BLOG
博客园 - 司徒正美
Engineering at Meta
Engineering at Meta
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
J
Java Code Geeks
Stack Overflow Blog
Stack Overflow Blog
N
Netflix TechBlog - Medium
Martin Fowler
Martin Fowler
宝玉的分享
宝玉的分享
G
Google Developers Blog
Last Week in AI
Last Week in AI

Education news India, Government education schemes, Department of education | The HinduBusinessLine

Karnataka gets 1,122 additional medical seats with Rs 1,090 crore support CBSE makes three-language study compulsory for Classes 9 and 10, exempts third language from Board exams CBI arrests NTA biology expert in NEET-UG 2026 paper leak investigation NEET paper leak case: Pune professor held as alleged kingpin by CBI Schaeffler India opens new facility at IISC deepening industry and science ties NEET-UG re-exam on June 21; computer-based test from next year, says Dharmendra Pradhan NEET-UG re-exam to be held on June 21 Scaler bets on AI-led upskilling for 25% online growth amid edtech slowdown CBSE results: Over 85% students clear class 12 board exams; pass percentage dips Kejriwal calls on Gen Z to demand accountability on NEET paper leak Medical association moves Supreme Court, seeks overhaul of NEET-UG exam system over 'paper leak' Nalanda Police bust NEET solver gang, MBBS student among arrested Plan for PMIS: Final year diploma students to be eligible Cos can go to campus to pick up interns NEET-UG 2026 cancelled after paper leak allegations, CBI probe ordered Teacher training in AI will be primary focus in next 3-4 months: Official Chhattisgarh’s Rungta University gets NAAC accreditation NCERT to launch postgraduate, doctoral programmes in education soon Tamil Nadu Class 12 results 2026: State records 95.03% pass percentage Maritime India Foundation formalises agreements with IITs and IMU 18% GST on coaching services upheld by Gujarat AAR, no exemption for institutes NEET 2026: Over 1 lakh students appear for exam across Tamil Nadu Tamil Nadu CM Stalin launches help desk to guide class 12 students to higher studies AIU centenary conference in Pune focuses on self-reliant Bharat through education Edtech pivots to AI-first learning, compresses coding modules Medical college SMSIMSR receives NABH entry-level accreditation MAHE, TENVIC launch academic programmes to strengthen sports ecosystem Ramaiah Group to invest ₹850 crore in setting up interdisciplinary STEM institute SASTRA signs MoU with Tata Advanced Systems Symbiosis launches Asia’s first UNESCO chair on gender inclusion in skills UPES Dehradun to focus on tech-driven learning for Kerala students
Power transmission infra set for ₹9 trillion upgrade as r...
By ANI · 2026-05-25 · via Education news India, Government education schemes, Department of education | The HinduBusinessLine
India’s installed renewable energy capacity stood at 226 GW as of June 2025, nearly three times the 76 GW recorded in 2014.

India’s installed renewable energy capacity stood at 226 GW as of June 2025, nearly three times the 76 GW recorded in 2014. | Photo Credit: BHAGYA PRAKASH K

India's power transmission infrastructure is headed for a massive investment cycle, with nearly ₹9 trillion in government-committed transmission capex expected till 2032, according to a report by Kotak Neo.

The report said the country's clean energy transition is no longer just about adding solar parks and wind farms, but also about building the grid infrastructure needed to move electricity efficiently across regions.

"India is adding 470 GW of renewable capacity. Every watt of that power needs wires, transformers, substations, and transmission lines before it can reach the grid," the report noted.

India's installed renewable energy capacity stood at 226 GW as of June 2025, nearly three times the 76 GW recorded in 2014. Over the next decade, the country is expected to add another 470 GW of solar and wind energy capacity, while power demand is projected to grow at a CAGR of 6.4 per cent till 2030, the report added.

According to the report, High-Voltage Direct Current (HVDC) transmission systems are likely to play a critical role in the transition, especially as renewable projects move farther away from consumption centres."

India's HVDC market is expected to grow from $15 billion in 2025 to $31 billion by 2035," the report said.

The report highlighted that annual transmission capex currently stands at around $8-9 billion, while large-scale projects typically take three to five years to complete, offering long-term visibility for equipment manufacturers.

It also pointed to rising demand from sectors such as data centres, railway electrification, electric vehicles, and industrial expansion, all of which will require stronger transmission and distribution infrastructure.

At the centre of the transmission buildout is Power Grid Corporation of India, whose actual capex in FY26 exceeded its revised target and reached ₹35,540 crore, the report said. The company has planned capex of ₹1.08 lakh crore between FY26 and FY28 and an estimated business pipeline of ₹3.06 lakh crore through FY32. However, the report cautioned that execution delays, land acquisition challenges, raw material price volatility and timing of HVDC orders remain key risks for the sector.

"This is not a one-time capex cycle. It is a decade-long infrastructure buildout," the report added.

Published on May 25, 2026