Image Transformations quota stuck after billing reset - builds silently dropped
@ad-beep Ad
·
2026-04-20
·
via Vercel Community - Latest posts
Project: foot-jersey (prj_wSA1dl5H8sAEVQbs2YAYzdKL59dL) Plan: Hobby Account: ad-beeps-projects Problem: My billing period ended at 23:00 UTC on April 19, 2026. The account-level usage page shows the new period with Image Transformations resetting to 0. However, the project-level usage page still shows Image Transformations at 5.1K / 5K - still over the limit from the previous period. Because of this stale project-level counter, all new deployments are being silently dropped. The deploy hook returns a job ID (MrIYq6yWw9FBMhrXwh0b) with state PENDING, but no build ever appears in the Deployments tab. This has been the case for 9+ hours since the billing period rolled over. Evidence: Account-level usage: shows new period, transformations reset to 0 Project-level usage: still shows 5,056 / 5,000 (102%) Deploy hook POST returns PENDING job ID but no deployment is created All systems operational on vercel-status.com No billing issues, no account suspension What I need: A force-sync of the project-level quota counter for project prj_wSA1dl5H8sAEVQbs2YAYzdKL59dL so it reflects the new billing period and deployments can proceed.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。