惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

WordPress大学
WordPress大学
Vercel News
Vercel News
博客园_首页
Y
Y Combinator Blog
美团技术团队
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
阮一峰的网络日志
阮一峰的网络日志
aimingoo的专栏
aimingoo的专栏
H
Hackread – Cybersecurity News, Data Breaches, AI and More
MyScale Blog
MyScale Blog
GbyAI
GbyAI
人人都是产品经理
人人都是产品经理
T
Tailwind CSS Blog
MongoDB | Blog
MongoDB | Blog
D
DataBreaches.Net
博客园 - Franky
Engineering at Meta
Engineering at Meta
量子位
The GitHub Blog
The GitHub Blog
F
Fortinet All Blogs
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
酷 壳 – CoolShell
酷 壳 – CoolShell
N
Netflix TechBlog - Medium

Latest News From North East India, Breaking News Today Headlines Updates | IndiaToday NE

'Raped' by father, Assam teenager kills self Nagaland launches Doyang wildlife division in Wokha to tackle human-elephant conflict NIA arrests five in Manipur’s Bishnupur mortar blast case Himanta says ‘Babri Masjid talk only possible in Bengal,’ targets Mamata govt Tripura HC orders monthly crackdown reports on illegal meat sellers in Agartala 94 per cent turnout in home voting for Aizawl civic polls ahead of April 21 voting Meghalaya CM urges end to hunger strike, assures no construction on Lumpongdeng island Over 10 kg meth seized in Aizawl, four arrested including Myanmar national Manipur CM, JAC fail to resolve Tronglaobi demands; talks to continue Tripura Governor reviews sewage plant, says Agartala taking steps to avert water crisis Athletics Federation of India turns focus to grassroots gaps and talent pipeline at Kohima meet Re-poll in TTAADC sees 86.83% turnout; counting on April 17 under tight security Meghalaya clears ordinance to grant official status to Khasi and Garo languages Mamata alleges BJP sending NRC notices from Assam, warns voters over data misuse Himanta jabs Mamata, says she mentions Modi, Shah more than God in speeches Assam labourer killed in transit mixer accident at Sikkim hydel project site Counting for TTAADC polls on April 17 amid tight security across Tripura Joint forces destroy 10 bunkers in Manipur hills during NH-202 operations Internet suspension extended in 5 Manipur districts amid law & order concerns Mizoram launches first phase of census, governor urges inclusive enumeration NIA chargesheets man for supplying illegal arms from Nagaland to naxals Himanta predicts 100 seats in Assam, 200 in Bengal; calls for border sealing Mamata Banerjee welcomes infiltrators in Bengal: Assam CM Meghalaya CM reviews PDS diversification, pushes nutrition kit for mothers Gaurav Gogoi demands immediate women’s quota, flags census and delimitation concerns Manipur cop suspended over alleged links with banned insurgent outfit Meghalaya: 15 held in East Garo Hills murder case, one accused still absconding Mizoram census to include refugees, IDPs; officials stress it’s not linked to citizenship Meghalaya tourism department urges Green Tech Foundation to end protest through talks World Art Day event in Shillong flags gaps in art infrastructure despite rich regional talent
Meghalaya High Court clears way for Ri-Bhoi highway, dism...
2026-04-23 · via Latest News From North East India, Breaking News Today Headlines Updates | IndiaToday NE

The Meghalaya High Court has disposed of a public interest litigation challenging a proposed high-speed highway corridor in Ri-Bhoi district, stating that the concerns raised had been addressed and assurances given by authorities would be followed.

The petition sought a halt to “all acquisition, survey and preparatory activities” and called for disclosure of environmental and social impact studies, public consultation, and exploration of less destructive alternatives.

The case centred on a 166.8 km greenfield high-speed corridor, with about 144.8 km falling within Meghalaya. The petitioner argued that the alignment passes through a fragile hill ecosystem prone to landslides, soil erosion and groundwater depletion, and flagged risks based on earlier highway projects that allegedly led to “ecological destabilisation, recurring landslides” and delays.

Concerns were also raised about the route passing through agricultural land, community-owned tribal areas, forests and water catchments, as well as its proximity to Lum Sohpetbneng, a site of cultural and religious significance.

Authorities, however, told the court that the project had been approved by the Cabinet Committee on Economic Affairs in May 2025 at a cost of Rs 22,864 crore and was intended to improve connectivity, logistics efficiency and strategic access in the North-East.

They stated that the corridor would “boost connectivity in the North-East Region” and ensure faster movement of goods, while also having “significant strategic and defence importance”.

In affidavits, officials said the project falls within 100 km of an international border and is therefore exempt from prior environmental clearance, though it must comply with a standard operating procedure on environmental safeguards. These include risk assessments, landslide management plans, drainage protection, and pollution control measures.

The project design includes 599 culverts, 79 minor bridges, 13 major bridges and 171 viaducts, along with slope stabilisation and erosion control systems. Authorities also said forest clearances and compliance with the Forest Rights Act would be obtained before construction begins.

On cultural concerns, the government maintained that the “core sacred area of Lum Sohpetbneng” lies outside both the land acquisition zone and the project’s direct impact area. It added that alignment changes were made following consultations with village headmen to avoid water sources and minimise impact on paddy fields.

Minutes of meetings cited in the affidavit noted that, after revisions, local representatives expressed satisfaction with the modified alignment and that “paddy fields, water sources have been avoided” in the project corridor.

The state government further clarified that current activities are preliminary and “do not constitute final land acquisition”, with affected stakeholders being given opportunities to raise objections under due process.

Taking note of these submissions, the court said it found no merit in the petition, observing that authorities had agreed to follow all statutory requirements and safeguards.

It recorded that steps would be taken to protect “the environment, natural streams, cultural sites”, and that necessary permissions would be obtained before the project proceeds.

The court also left the door open for future legal action, stating that the petitioner may file a fresh case if a new cause of action arises.

The petition was disposed of on April 17, 2026.