惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

The GitHub Blog
The GitHub Blog
有赞技术团队
有赞技术团队
Apple Machine Learning Research
Apple Machine Learning Research
V
V2EX
Engineering at Meta
Engineering at Meta
美团技术团队
H
Hackread – Cybersecurity News, Data Breaches, AI and More
博客园 - 司徒正美
I
InfoQ
S
SegmentFault 最新的问题
博客园 - 叶小钗
N
Netflix TechBlog - Medium
Y
Y Combinator Blog
IT之家
IT之家
博客园 - Franky
大猫的无限游戏
大猫的无限游戏
人人都是产品经理
人人都是产品经理
T
The Blog of Author Tim Ferriss
月光博客
月光博客
The Cloudflare Blog
U
Unit 42
GbyAI
GbyAI
L
LangChain Blog
Microsoft Azure Blog
Microsoft Azure Blog

Latest News From North East India, Breaking News Today Headlines Updates | IndiaToday NE

'Raped' by father, Assam teenager kills self Nagaland launches Doyang wildlife division in Wokha to tackle human-elephant conflict NIA arrests five in Manipur’s Bishnupur mortar blast case Himanta says ‘Babri Masjid talk only possible in Bengal,’ targets Mamata govt Tripura HC orders monthly crackdown reports on illegal meat sellers in Agartala 94 per cent turnout in home voting for Aizawl civic polls ahead of April 21 voting Meghalaya CM urges end to hunger strike, assures no construction on Lumpongdeng island Over 10 kg meth seized in Aizawl, four arrested including Myanmar national Manipur CM, JAC fail to resolve Tronglaobi demands; talks to continue Tripura Governor reviews sewage plant, says Agartala taking steps to avert water crisis Athletics Federation of India turns focus to grassroots gaps and talent pipeline at Kohima meet Re-poll in TTAADC sees 86.83% turnout; counting on April 17 under tight security Meghalaya clears ordinance to grant official status to Khasi and Garo languages Mamata alleges BJP sending NRC notices from Assam, warns voters over data misuse Himanta jabs Mamata, says she mentions Modi, Shah more than God in speeches Assam labourer killed in transit mixer accident at Sikkim hydel project site Counting for TTAADC polls on April 17 amid tight security across Tripura Joint forces destroy 10 bunkers in Manipur hills during NH-202 operations Internet suspension extended in 5 Manipur districts amid law & order concerns Mizoram launches first phase of census, governor urges inclusive enumeration NIA chargesheets man for supplying illegal arms from Nagaland to naxals Himanta predicts 100 seats in Assam, 200 in Bengal; calls for border sealing Mamata Banerjee welcomes infiltrators in Bengal: Assam CM Meghalaya CM reviews PDS diversification, pushes nutrition kit for mothers Gaurav Gogoi demands immediate women’s quota, flags census and delimitation concerns Manipur cop suspended over alleged links with banned insurgent outfit Meghalaya: 15 held in East Garo Hills murder case, one accused still absconding Mizoram census to include refugees, IDPs; officials stress it’s not linked to citizenship Meghalaya tourism department urges Green Tech Foundation to end protest through talks World Art Day event in Shillong flags gaps in art infrastructure despite rich regional talent
Mizoram plans Rs 2,289-crore hydropower project on Tuivai...
Press Trust of India · 2026-05-27 · via Latest News From North East India, Breaking News Today Headlines Updates | IndiaToday NE

The Mizoram government is planning to set up a 132-MW hydropower project on the Tuivai river in Saitual district near the Manipur border to strengthen electricity generation amid rising power demand in the state.

Chief Minister Lalduhoma chaired a high-level review meeting on Wednesday, May 27, to expedite the proposed Tuivai Hydroelectric Project, estimated to cost Rs 2,289.50 crore and expected to be completed within five years.

The meeting was attended by Power Minister F Rodingliana and senior officials of the Power and Electricity Department.

Officials said the Detailed Project Report (DPR) for the project has already been completed and the proposal is now ready for the tendering process.

The state government is also exploring implementation of the project under the Public-Private Partnership (PPP) model, officials added.

According to the 20th Electric Power Survey, Mizoram’s peak electricity demand currently stands at 182 MW and is projected to increase to around 213 MW by 2030.

Although the state has an installed power generation capacity of 50.20 MW, actual generation remains significantly lower, with only around 10 per cent of the total electricity requirement currently being met through local production, officials said.

The state spends nearly ₹649.54 crore annually on power purchases, excluding transmission charges, making expansion of local power generation a priority area for the government.

Officials said the Tuivai Hydroelectric Project was first surveyed by the Central Water Commission in 1992 with a proposed generation capacity of 210 MW.

However, since part of the proposed dam area extended into neighbouring Manipur, the project was redesigned and re-surveyed.

A revised DPR was subsequently prepared with a reduced generation capacity of 132 MW.

The review meeting also examined the annual financial requirements for implementing the project in consultation with the Finance Department.

Apart from the Tuivai project, the meeting reviewed the progress of the ongoing Tuirini Hydroelectric Project and works being carried out under the Revamped Distribution Sector Scheme (RDSS).

Officials said discussions were also held on issues to be taken up with Manohar Lal Khattar during his upcoming visit to Mizoram.