惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

D
DataBreaches.Net
N
Netflix TechBlog - Medium
P
Proofpoint News Feed
D
Docker
J
Java Code Geeks
L
LangChain Blog
Microsoft Security Blog
Microsoft Security Blog
The GitHub Blog
The GitHub Blog
I
InfoQ
Stack Overflow Blog
Stack Overflow Blog
云风的 BLOG
云风的 BLOG
Engineering at Meta
Engineering at Meta
MongoDB | Blog
MongoDB | Blog
月光博客
月光博客
T
Tailwind CSS Blog
M
MIT News - Artificial intelligence
Blog — PlanetScale
Blog — PlanetScale
Google DeepMind News
Google DeepMind News
腾讯CDC
罗磊的独立博客
U
Unit 42
爱范儿
爱范儿
Vercel News
Vercel News
MyScale Blog
MyScale Blog

The Register - On-Prem

Ohio hits pause on datacenter tax breaks draining its coffers Europe told to cool its datacenter boom before water and power run short Kyndryl takes employees' pulse while cutting off circulation for some Outlook has an image problem Microsoft says cu l8r to text message security 'Workforce rebalancing' comes for Kyndryl, and delivery teams are in the firing line MAGA's Mace wants to make power bills great again, calls for datacenter moratorium Datacenters slurping up so much juice they boosted prices 75% in largest US energy market Exploited Exchange Server flaw turns OWA inboxes into script launchpads Utah mega datacenter could dump 23 atomic bombs worth of energy per day Rust stalks IBM mainframes, but only in nightly form Iran war hits datacenter building supply chains, upping costs ON CALL: Custom PC worked in the lab, failed on site – and so did the angry client ShinyHunters claims dump puts 119K Vimeo emails in the wild Vodafone dials up full control of VodafoneThree Palantir CEO: 10 percent of world 'professionally hates us' Bad news for OpenClaw stans: Apple’s Mac Mini starts at $799 AWS networking lab tour: Making networking disappear Royal Navy chief backs drones, robot ships Bank of England is gold standard for tech projects, says PAC UK pensions dept shopping for spy-van tech worth up to £2M Microsoft boss tells investors the company is working to 'win back fans' What type of 'C2 on a sleep cycle' do they leave behind? Novel Chinese spy group found in critical networks in Poland, Asia Microsoft levels up Azure Local for sovereign clouds Cloudflare: autocrats, wars, and votes caged the net in Q1 ZTE & XLSMART launch Jakarta AI & 5G-A Innovation Center When robots join the race: 5G-A powers a new kind of marathon 5G-A powers a new kind of marathon Oracle plans to power its New Mexico DC with fuel cell farm DCMS to new CDIO: Microsoft migration, overhaul ERP, survive
UK state bank considers lengthening disastrous IT program
Lindsay Clark Lindsay Clark · 2026-04-14 · via The Register - On-Prem

Public Sector

Already £1.3B over budget and 4 years late, NS&I could extend timetable beyond 8 years

The UK's state-backed savings bank has set out options for finishing its disastrous transformation program, including busting the current timeline.

In its response to a Parliamentary watchdog report that branded National Savings & Investments' (NS&I) long-running digital overhaul a £3 billion "full-spectrum disaster," the government said it would decide the future of the project in the second quarter of this year through a Full Business Case. The overhaul is already £1.3 billion over budget and four years late.

It will set out what it can achieve within the limits set out by HM Treasury in the 2025 Spending Review and also discuss options for extending the timelines beyond the March 2028 finish line and getting more funding.

Last month, NS&I boss Dax Harkins resigned after around 37,500 people faced delays in processing bonds belonging to deceased relatives, worth an estimated £476 million. He is being replaced by Sir Jim Harra, former chief executive of His Majesty's Revenue & Customs.

NS&I began the business transformation program dubbed Project Rainbow in 2020, aiming to reduce the bank's running costs, make NS&I a self-service digital business, and replace its 20-year outsourcing deal with Atos by splitting the work into five separate contracts.

In 2014, the bank awarded Atos a new contract to run until 2021, then extended it until 2024 and again until 2028 without competition, handing the French outsourcer another £474.4 million. The total cost of the program is expected to hit £3 billion by 2030-31, including its contract with Atos and other running costs. The total cost increase is set for £1.3 billion compared to the 2020 business case, the National Audit Office said in November.

In a transparency statement in January last year, Harkins said the direct award to Atos was made because "un-picking and re-integrating 25 years of complex IT infrastructure has been more challenging than originally envisaged."

In a report in February [PDF], the Public Accounts Committee (PAC) said that recent work by NS&I's consultants suggests the program cannot be delivered by March 2028, when the Atos contract ends. "NS&I is still trying to complete the Program even earlier, with high-risk work on replacing the core banking engine still at an early stage. We are not convinced that even now NS&I has the realism needed for the Program, and we are not confident that NS&I will deliver the Program successfully," it said.

The PAC concluded that NS&I was overconfident, had no workable plan, and no idea of eventual cost. It recommended the bank should stop trying to compress work to deliver the program by March 2028 and instead provide a "realistic bottom-up integrated plan."

In its response, HM Treasury said NS&I was setting out a clear view on what was deliverable within its Spending Review settlement alongside two further options. One is to deliver the full scope of the program as quickly as possible, presumably with implications for its budget. The second option involves "delivering along an elongated delivery timeline and aiming to minimize any increase to the Spending Review settlement." The latter would presumably require further changes to the Atos contract, which is set to end in 2028. An NS&I spokesperson said it had an option to extend the contract until March 2029, when the Spending Review period ends. ®