



















The application considered is mixed-criticality scheduling. The core formal approaches used are Rely-Guarantee conditions and the Timeband framework; these are applied to give a layered description of job scheduling which includes resilience to jobs overrunning their expected execution time. A novel formal modelling idea is proposed to handle the relationship between actual time and its approximation in hardware clocks.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。