





















In the paper, the new approach to the scheduling problem are described. The approach deals with the problem of planning the cyclic production and proposes to consider such scheduling problem as the cyclic job-shop problem of the order k, where k is the number of reiterations. It was found out that planning of only one iteration of the loop is less effective than planning of the entire cycle. To the experimental research, a number of test instances of the job-shop scheduling problem by Operation Research Library were used. The Simulated Annealing was applied to solve the instances. The experiments proved that the approach proposed allows increasing the efficiency of cyclic scheduling significantly.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。