






















The paper considers the problem of scheduling software modules on a multi-core processor, taking into account the limited bandwidth of the data bus and the precedence constraints. Two problem formulations with different levels of problem-specific detail are suggested and both shown to be NP-hard. A mixed integer linear programming (MILP) model is proposed for the first problem formulation, and a greedy algorithm is developed for the second one. An experimental comparison of the results of the greedy algorithm and the MILP solutions found by CPLEX solver is carried out.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。