























Task reassignments in 2D mesh-connected systems (2D-MSs) have been researched for several decades. We propose a hierarchical 2D mesh-connected system (2D-HMS) in order to exploit the regular nature of a 2D-MS. In our approach priority-based task assignments and reassignments in a 2D-HMS are represented by tableaux and their algorithms. We show how task relocations for a priority-based task reassignment in a 2D-HMS are reduced to a jeu de taquin slide.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。