

























The paper presents a solution to the dynamic DAG scheduling problem in Grid environments. It presents a distributed, scalable, efficient and fault-tolerant algorithm for optimizing tasks assignment. The scheduler algorithm for tasks with dependencies uses a heuristic model to optimize the total cost of tasks execution. Also, a method based on genetic algorithms is proposed to optimize the procedure of resources assignment. The experiments used the MonALISA monitoring environment and its extensions. The results demonstrate very good behavior in comparison with other scheduling approaches for this kind of DAG scheduling algorithms.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。