惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

GbyAI
GbyAI
Y
Y Combinator Blog
F
Fortinet All Blogs
H
Hackread – Cybersecurity News, Data Breaches, AI and More
N
Netflix TechBlog - Medium
T
Tailwind CSS Blog
aimingoo的专栏
aimingoo的专栏
博客园 - Franky
T
The Blog of Author Tim Ferriss
D
DataBreaches.Net
量子位
博客园 - 三生石上(FineUI控件)
I
InfoQ
Engineering at Meta
Engineering at Meta
WordPress大学
WordPress大学
阮一峰的网络日志
阮一峰的网络日志
爱范儿
爱范儿
D
Docker
美团技术团队
雷峰网
雷峰网
U
Unit 42
Stack Overflow Blog
Stack Overflow Blog
Recent Announcements
Recent Announcements
人人都是产品经理
人人都是产品经理

New York Post

Federal officials order flight cuts at Chicago O’Hare to reduce airport delays Minnesota dad who shoved Turning Point USA journalist at anti-ICE protest says family is 'absolutely not violent' Former adult film star Asia Carrera makes career turn after passing Texas bar exam to become attorney Boy, 13, stabbed with large knife during suspected dispute near NYC park Over 200 swarm Atlanta intersection in illegal street takeover roaring with cars racing and doing donuts Yankees' Aaron Boone blasts 'overly sensitive' umpires after first ejection of season Stream It Or Skip It: 'Fake Profile' Season 3 On Netflix, Another Crazy Season Of The Steamy Colombian Thriller Eastbound 105 Freeway reopens hours after man shot as mystery deepens around what happened Tony Bradley believes Hawks need to hit Knicks 'in the mouth first' A quiet change at a Sacramento school is raising concerns among parents Washington state teacher flashed topless pics to class full of students during PowerPoint presentation Knicks looking to push NBA-best clutch success to its limit in playoffs Stream It Or Skip It: 'Beef' Season 2 On Netflix, Where A Young Couple Take On Their Boss And His Wife When They Witness A Vicious Argument Footage shows D4vd arrested surrounded by gun-wielding cops Acting ICE Director Todd Lyons resigns after 20 years with agency -- will stay on for transition 'Proof' review: Ayo Edebiri and Don Cheadle star in underpowered Broadway revival Federal authorities issue warning after multiple drone sightings above Coors Field Ohio State dominant school at receiver with latest star set for NFL draft 'The Pitt' Season 2 Ending Explained: Does Baby Jane Doe Save Dr. Robby? SoCal man's bittersweet reunion with stolen 1969 Camaro caught on camera Dem rising star boasts about Fed experience -- but record tells different story Luka Doncic spotted in Europe at Real Madrid basketball game with tennis superstar Pregnant Aubrey Plaza flaunts her baby bump in floral minidress at NYC screening ‘The Pitt’ Season 2 Episode 15 Recap: 100 Percent F**ked Up (Season 2 Finale) ‘Shahs of Sunset’ star Mercedes ‘MJ’ Javid reveals how she found a fresh start amid divorce Deonte Banks gets Giants 'clean slate' at critical point in his NFL career Mets can't hide behind the numbers — they're feeling the pressure Tiffany & Co. Blue Book 2026 launch: Mariah Carey, Naomi Watts, Teyana Taylor and more Hannah Einbinder Couldn't Stop Bawling While Jesse McCartney Was On Set Filming 'Hacks' Episode 2: "I Cried Every Single Take" The PGA Tour reunions that must happen with LIV Golf on life support
California’s other transit ‘boondoggle’ laid bare as cost...
Ross O' · 2026-05-03 · via New York Post

The Golden State has more than one transit “boondoggle” to wrestle with.

Another blighted project seeking to connect the Bay Area with the San Joaquin Valley — the Valley Link Rail Project — has seen millions of dollars poured in since 2018, with absolutely nothing to show for it.

The transit project was supposed to relieve traffic congestion in the area and provide commuters with traffic-free transport through areas like Altamont Pass, but it hasn’t left the planning stages in the 8 years since it was proposed.

Illustration of the Vasco Station with two trains and passengers on the platform.

The Golden State has more than one transit “boondoggle” to wrestle with. Youtube/ Valley Link Rail

Photo simulation of the Valley Link train on an elevated track over I-580.

Another blighted project seeking to connect the Bay Area with the San Joaquin Valley — the Valley Link Rail Project — has seen millions of dollars poured in since 2018, with absolutely nothing to show for it. Youtube/ Valley Link Rail

Illustration of the proposed Valley Link alignment for Phase 1A in the Dublin/Pleasanton and Livermore areas.

The transit project was supposed to relieve traffic congestion in the area and provide commuters with traffic-free transport through areas like Altamont Pass, but it hasn’t left the planning stages in the 8 years since it was proposed. calleylinkrail.com

Estimated costs for the project have ballooned from a $2 billion price tag to $4.4 billion, further delaying construction. Kevin Sheridan, Valley Link Rail Authority’s executive director, told the East Bay Times that the large costs have forced them to divide the project into two phases with the second phase potentially running from Vasco Road to a new Mountain House station.

A big reason for the project’s sluggish pace is money.

“At the highest level, money is a big piece of it,” Sebastian Petty, a senior transportation policy advisor for SPUR, told the East Bay Times.

Officials have secured $800 million in funding for the project, but they still need a lot more. The project requires about $2 billion more in local, state and federal funds to start construction. That amount still wouldn’t be enough to make it to the planned Mountain House station located in western San Joaquin County.

“All of those processes take time, securing that money takes time,” Petty said.

VALLEY LINK logo with the slogan "Connecting People, Housing, and Jobs".

Kevin Sheridan, Valley Link Rail Authority’s executive director, told the East Bay Times that the large costs have forced them to divide the project into two phases

He says transit projects like Valley Link require several sources of funding from the local and state level to prove its financially viable. There’s more competition for the funding than there is the capacity to give it, Petty mentioned.

“In a broad sense, there is greater demand for funding than there is capacity,” Petty said. “What makes things slow down, stall out – none of these projects have a full tank of gas. They kind of have to increment things together to be able to move forward.”

Sign up for the California Morning Report newsletter

California's top news, sports and entertainment delivered to your inbox every day.

Thanks for signing up!

There’s also a chance the project is shelved if Bay Area voters don’t approve a 14-year sales tax to bail out BART, which has suffered from budget deficits and fiscal issues.

“From a narrow Bay Area perspective, I think the most important thing in Bay Area transit right now is to make sure that BART is operationally solvent and financially funded,” Petty said. “For Valley Link to really be a valuable project that delivers on its potential, it is essential that BART be in a healthy state.”

Map of the California High-Speed Rail network showing phases 1 and 2, planned stations, Brightline West, and the High Desert Corridor.

He says transit projects like Valley Link require several sources of funding from the local and state level to prove its financially viable. Governor Gavin Newsom's Office

Commuters are sick of the talk about the heavily-delayed project.

“They’re only talks. Nothing has actually happened as of now,” commuter Sohan Nayabu told the East Bay Times. “I don’t even think I want it anymore.”

He was excited to learn the transit line would stretch to his Mountain House home and he’ll have a faster commute, but has since given up on his hopes. Nayabu, 43, is convinced he’ll retire before its built.


Download The California Post App, follow us on social, and subscribe to our newsletters

California Post News: Facebook, Instagram, TikTok, X, YouTube, WhatsApp, LinkedIn
California Post Sports Facebook, Instagram, TikTok, YouTube, X
California Post Opinion
California Post Newsletters: Sign up here!
California Post App: Download here!
Home delivery: Sign up here!
Page Six Hollywood: Sign up here!


“By the time they come to Mountain House, I’ll be retiring by then,” Nayabu said.

The larger statewide boondoggle is Gov. Gavin Newsom’s high-speed transit project that will cost $126 billion to finish — promising a transit line from Los Angeles to San Francisco. Billions has already been spent on the project with no operating date, despite seeing voter approval via a ballot measure in 2008.

Illustration of the California High-Speed Rail train moving quickly on tracks through an open field with mountains in the background.

The larger statewide boondoggle is a high-speed transit project that will cost $126 billion to finish in order to yield a transit line from Los Angeles to San Francisco. Billions has already been spent on the project with no operating rail, despite seeing voter approval via a ballot measure in 2008. California High-Speed Rail Authority

California Governor Gavin Newsom speaking at the 33rd Annual White House Correspondents' Garden Brunch.

The larger statewide boondoggle is Gov. Gavin Newsom’s high-speed transit project that will cost $126 billion to finis Nathan Posner/Shutterstock

California Governor Gavin Newsom smiling at the 19th Annual California Hall of Fame Ceremony.

President Donald Trump yanked federal funding for the project last year, and called it the “train to nowhere.” Getty Images

President Donald Trump yanked federal funding for the project last year, and called it the “train to nowhere.”

Newsom has persisted with the project, announcing the southern railhead facility had been built in Kern County this February. The governor said then that California was “proving” high-speed rail “can be done.”