惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

爱范儿
爱范儿
大猫的无限游戏
大猫的无限游戏
J
Java Code Geeks
MongoDB | Blog
MongoDB | Blog
Martin Fowler
Martin Fowler
GbyAI
GbyAI
Microsoft Azure Blog
Microsoft Azure Blog
Recent Announcements
Recent Announcements
F
Fortinet All Blogs
B
Blog
U
Unit 42
B
Blog RSS Feed
D
DataBreaches.Net
Google DeepMind News
Google DeepMind News
人人都是产品经理
人人都是产品经理
腾讯CDC
量子位
酷 壳 – CoolShell
酷 壳 – CoolShell
V
Visual Studio Blog
博客园 - 聂微东
MyScale Blog
MyScale Blog
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园 - 三生石上(FineUI控件)
Engineering at Meta
Engineering at Meta

Power Technology

APAC dominates solar PV additions globally, forecasts GlobalData - Power Technology DEME secures offshore wind turbine installation contract in Japan SSE reports 4% drop in annual profit for March 2026 ContourGlobal launches Victor Jara hybrid plant in Chile Centre Manche seeks approval for 1.5GW offshore wind project Opening the UK grid to competition could cut bills and boost growth Bangladesh solar PV capacity to reach 8.5GW by 2035, forecasts GlobalData - Power Technology Client Challenge Qualitas Energy funds 211MW battery projects in Italy New episode: Glut or shortage - what lies ahead for LNG? - Power Technology RWE secures CIS Tender 7 for 1.1GW Theodore Wind Farm Egypt solar PV capacity to reach 34.3GW by 2035, forecasts GlobalData - Power Technology South Korea's nuclear power to reach 219.2TWh by 2035, forecasts GlobalData - Power Technology Nordex begins production at new rotor blade plant in Türkiye AirPlus Renewables prepares for UK launch of XEVA edge wind turbine - Power Technology AIKO wins modules contract for Nefer Benban solar project Spearmint Energy secures $450m for Red Egret BESS project Sungrow to supply 7.5GWh of storage for Masdar's RTC project Grenergy to deploy 1.5GWh of CATL batteries at Oviedo Escuderos Statkraft to reinvest Nkr80bn in Norwegian hydropower - Power Technology CIM unveils Permanent Power Company with $400m support Offshore Technology Conference: OTC 2026 in review - Power Technology ASL selects AGL, Enel X for 532MW of new NSW firming capacity Sunraycer secures $901m for Texas solar and storage projects UK grants development consent for offshore wind farms Iberdrola launches 195MW Tâmega Norte wind farm in Portugal South America reshapes its hydropower future amid climate, investment and AI pressures - Power Technology Cadeler installs inaugural commissioned monopile at Hornsea 3 IAEA leads Venezuela HEU removal - Power Technology Why gas engine power plants are crucial in the energy transition
Oklo launches nuclear AI partnership - Power Technology
Tracey · 2026-04-30 · via Power Technology

The partnership supports Oklo’s plutonium fuel work and wider plans to combine advanced reactors with high-density AI data centres.

April 30, 2026

Oklo, Nvidia and the LANL are collaborating to support the development of nuclear-powered AI factories. Credit: Oklo.

Oklo, Nvidia and the Los Alamos National Laboratory (LANL) have announced a strategic collaboration to advance nuclear fuel validation and support the development of nuclear-powered AI factories.

The partnership integrates Oklo’s sodium-cooled fast reactor technology, Nvidia’s advanced AI and high-performance computing infrastructure, and the LANL’s expertise in materials science and nuclear fuels. The LANL hosts the collaborative research and development (R&D) efforts at its facility in New Mexico.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

The collaboration aims to accelerate the deployment of advanced nuclear energy through several initial focus areas:

  • AI-Enhanced Fuel Validation: Developing physics and chemistry-based AI models, specifically trained inference models, to support the validation and research of plutonium-bearing fuels.
  • Materials Science R&D: Researching the fabrication of plutonium-bearing fuels to optimise modern manufacturing and quality assurance processes.
  • Nuclear-Powered AI Factories: Designing “integrated full-stack solutions” that combine nuclear power generation with high-density AI data centres. This includes studying grid reliability, redundancy and stabilisation to ensure resilient power for massive AI compute demands.
  • Digital Twins and Simulation: Utilising digital twin technology to create virtual models of nuclear infrastructure, which is intended to streamline development and reduce the time needed to bring commercial products to market.

This agreement is a key component of the US Federal Government’s Genesis Mission, a Department of Energy (DoE) initiative launched in November 2025 to create a powerful AI-driven scientific platform aimed at doubling US R&D productivity.

The fuel R&D specifically supports Oklo’s Pluto reactor, one of two Oklo reactor designs selected under the DoE’s Reactor Pilot Program. The other is the Auroro Powerhouse. Pluto is a plutonium-fuelled fast test reactor project. Aurora is a sodium-cooled fast reactor that builds on the design and operating heritage of the Experimental Breeder Reactor II, which ran in Idaho from 1964 to 1994.

Oklo continues to target commercial power generation by the end of 2027, following its site use permit from the DoE and ongoing work with the Nuclear Regulatory Commission.

“This agreement brings together reactor deployment, high-performance compute, and world-class fuel and materials science expertise” said Oklo co-founder and CEO Jacob DeWitte. “We believe this will advance our plutonium-bearing fuel work on Oklo’s Pluto reactor, which was selected under DoE’s Reactor Pilot Program, and help bring resilient power in support of the Genesis Mission.”

Projects under the agreement include integrated full-stack solutions to support nuclear-powered AI factories; AI development, including physics and chemistry-trained AI models to support nuclear fuel R&D; grid stabilisation, reliability and redundancy studies; materials science efforts focused on plutonium-bearing fuel; and proof of concept work related to the development of a nuclear-powered AI factory.

Oklo is already conducting plutonium fast reactor critical tests with the LANL at the DoE’s National Criticality Experiments Research Centre (NCERC) under a Strategic Partnership Project (SPP). The NCERC is located at the LANL-operated Nevada National Security Site, under the oversight of the DoE and the National Nuclear Security Administration.

It provides specialised test assemblies, diagnostic systems and expert staff to perform rigorous, highly controlled criticality and reactivity experiments. The work builds on a growing collaboration between the LANL and Oklo spanning SPPs and a Cooperative Research and Development Agreement focused on advanced fuels such as plutonium, and advanced reactors.

Oklo says the LANL is an essential partner for developing and validating plutonium as an advanced reactor bridge fuel by providing the R&D foundation needed for future fast reactor development and deployment. The addition of Nvidia’s AI expertise is expected to accelerate developments.

Oklo was the first to receive a site use permit from the DoE for a commercial advanced fission plant (Aurora), was awarded fuel from the Idaho National Laboratory and submitted the first custom combined licence application for an advanced reactor to the Nuclear Regulatory Commission. Oklo is also developing advanced fuel recycling technologies in collaboration with the DoE and US National Laboratories.