惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

人人都是产品经理
人人都是产品经理
Stack Overflow Blog
Stack Overflow Blog
S
SegmentFault 最新的问题
博客园 - 司徒正美
aimingoo的专栏
aimingoo的专栏
U
Unit 42
GbyAI
GbyAI
B
Blog RSS Feed
博客园 - Franky
L
LangChain Blog
Hugging Face - Blog
Hugging Face - Blog
美团技术团队
The GitHub Blog
The GitHub Blog
Y
Y Combinator Blog
云风的 BLOG
云风的 BLOG
H
Hackread – Cybersecurity News, Data Breaches, AI and More
博客园 - 三生石上(FineUI控件)
Microsoft Azure Blog
Microsoft Azure Blog
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
G
Google Developers Blog
Last Week in AI
Last Week in AI
阮一峰的网络日志
阮一峰的网络日志
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
Apple Machine Learning Research
Apple Machine Learning Research

Power Technology

APAC dominates solar PV additions globally, forecasts GlobalData - Power Technology DEME secures offshore wind turbine installation contract in Japan SSE reports 4% drop in annual profit for March 2026 ContourGlobal launches Victor Jara hybrid plant in Chile Centre Manche seeks approval for 1.5GW offshore wind project Opening the UK grid to competition could cut bills and boost growth Bangladesh solar PV capacity to reach 8.5GW by 2035, forecasts GlobalData - Power Technology Client Challenge Qualitas Energy funds 211MW battery projects in Italy New episode: Glut or shortage - what lies ahead for LNG? - Power Technology RWE secures CIS Tender 7 for 1.1GW Theodore Wind Farm Egypt solar PV capacity to reach 34.3GW by 2035, forecasts GlobalData - Power Technology South Korea's nuclear power to reach 219.2TWh by 2035, forecasts GlobalData - Power Technology Nordex begins production at new rotor blade plant in Türkiye AirPlus Renewables prepares for UK launch of XEVA edge wind turbine - Power Technology AIKO wins modules contract for Nefer Benban solar project Spearmint Energy secures $450m for Red Egret BESS project Sungrow to supply 7.5GWh of storage for Masdar's RTC project Grenergy to deploy 1.5GWh of CATL batteries at Oviedo Escuderos Statkraft to reinvest Nkr80bn in Norwegian hydropower - Power Technology CIM unveils Permanent Power Company with $400m support Offshore Technology Conference: OTC 2026 in review - Power Technology ASL selects AGL, Enel X for 532MW of new NSW firming capacity Sunraycer secures $901m for Texas solar and storage projects UK grants development consent for offshore wind farms Iberdrola launches 195MW Tâmega Norte wind farm in Portugal South America reshapes its hydropower future amid climate, investment and AI pressures - Power Technology Cadeler installs inaugural commissioned monopile at Hornsea 3 IAEA leads Venezuela HEU removal - Power Technology Why gas engine power plants are crucial in the energy transition
Fred. Olsen Seawind to take full control of Muir Mhòr win...
Shree Mishra · 2026-04-23 · via Power Technology

Muir Mhòr is located approximately 63km off the Aberdeenshire coast near Peterhead, Scotland, UK.

The project is scheduled to begin generating renewable energy in the early 2030s. Credit: fokke baarssen/Shutterstock.com.

Fred. Olsen Seawind has agreed to acquire Vattenfall’s 50% stake in the 1GW Muir Mhòr floating offshore wind project in eastern Scotland, UK, effectively gaining full ownership of the project.

The transaction awaits necessary regulatory approvals.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

Muir Mhòr, positioned approximately 63km off the Aberdeenshire coast near Peterhead, was granted seabed rights in 2022 during the ScotWind leasing round.

It stands as one of the early commercial-scale floating offshore wind projects globally.

The project aims for an early allocation round and is scheduled to begin generating renewable energy in the early 2030s.

Fred. Olsen Seawind CEO Maren Lundby said: “Fred. Olsen Seawind is excited about taking full ownership of Muir Mhòr and continuing to drive the project through its next milestones.

“We have built an excellent team and are working together with the Scottish Government and National Energy System Operator (NESO) to secure our offshore consent and accelerated grid date.

“Fred. Olsen-related companies have a long, proud history in Scotland from 1902 in shipping, manufacturing, forestry, offshore oil and gas, hydropower and, in the last 30 years, also renewable wind power and renewable consultancy.

“Floating offshore wind has the potential to kick-start a new global industry and, as part of Bonheur, Fred. Olsen Seawind will leverage the related companies’ expertise to complete the development process and advance toward construction and generation.”

The development of Muir Mhòr will proceed according to schedule, pending the acquisition of all requisite development permits, including offshore consent.

The partners view this as the most efficient way to finalise development and qualify for an early allocation round.

Vattenfall’s exit from the project aligns with its strategic focus on other offshore wind developments like Nordlicht I and II in Germany and Zeevonk in the Netherlands.

Meanwhile, the Clashindarroch II onshore wind farm in Scotland is under construction, with initial power generation anticipated in 2027.

In January this year, Vattenfall confirmed its final investment decision for the Nordlicht offshore wind cluster in Germany following the Federal Maritime and Hydrographic Agency’s issuance of an irrevocable permit for the Nordlicht II offshore wind farm.