惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Apple Machine Learning Research
Apple Machine Learning Research
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
G
Google Developers Blog
博客园 - 司徒正美
J
Java Code Geeks
aimingoo的专栏
aimingoo的专栏
A
About on SuperTechFans
博客园 - 三生石上(FineUI控件)
WordPress大学
WordPress大学
T
The Blog of Author Tim Ferriss
D
Docker
大猫的无限游戏
大猫的无限游戏
D
DataBreaches.Net
腾讯CDC
V
Visual Studio Blog
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
C
Check Point Blog
M
MIT News - Artificial intelligence
Jina AI
Jina AI
I
InfoQ
雷峰网
雷峰网
The Cloudflare Blog
美团技术团队
Engineering at Meta
Engineering at Meta

Power Technology

APAC dominates solar PV additions globally, forecasts GlobalData - Power Technology DEME secures offshore wind turbine installation contract in Japan SSE reports 4% drop in annual profit for March 2026 ContourGlobal launches Victor Jara hybrid plant in Chile Centre Manche seeks approval for 1.5GW offshore wind project Opening the UK grid to competition could cut bills and boost growth Bangladesh solar PV capacity to reach 8.5GW by 2035, forecasts GlobalData - Power Technology Client Challenge Qualitas Energy funds 211MW battery projects in Italy New episode: Glut or shortage - what lies ahead for LNG? - Power Technology RWE secures CIS Tender 7 for 1.1GW Theodore Wind Farm Egypt solar PV capacity to reach 34.3GW by 2035, forecasts GlobalData - Power Technology South Korea's nuclear power to reach 219.2TWh by 2035, forecasts GlobalData - Power Technology Nordex begins production at new rotor blade plant in Türkiye AirPlus Renewables prepares for UK launch of XEVA edge wind turbine - Power Technology AIKO wins modules contract for Nefer Benban solar project Spearmint Energy secures $450m for Red Egret BESS project Sungrow to supply 7.5GWh of storage for Masdar's RTC project Grenergy to deploy 1.5GWh of CATL batteries at Oviedo Escuderos Statkraft to reinvest Nkr80bn in Norwegian hydropower - Power Technology CIM unveils Permanent Power Company with $400m support Offshore Technology Conference: OTC 2026 in review - Power Technology ASL selects AGL, Enel X for 532MW of new NSW firming capacity Sunraycer secures $901m for Texas solar and storage projects Iberdrola launches 195MW Tâmega Norte wind farm in Portugal South America reshapes its hydropower future amid climate, investment and AI pressures - Power Technology Cadeler installs inaugural commissioned monopile at Hornsea 3 IAEA leads Venezuela HEU removal - Power Technology Why gas engine power plants are crucial in the energy transition Matrix connects two new renewable projects to Spanish grid
UK grants development consent for offshore wind farms
Anwesha Patt · 2026-05-15 · via Power Technology

The government approval increases renewable electricity supply for homes across the UK.

The DBS offshore wind farms will provide a combined capacity of 3GW. Credit: © 2026 Masdar.

The UK Government has granted development consent for the Dogger Bank South (DBS) offshore wind projects and the North Falls offshore wind farm, paving the way for an increase in offshore wind capacity.

The consent, given by Lord Whitehead on behalf of the UK Energy Secretary, covers two DBS wind farms – DBS West and DBS East – which are being developed as a joint venture (JV) between RWE (51%) and Masdar (49%).

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

Each wind farm will have an installed capacity of 1.5GW, together providing a capacity of 3GW.

The DBS projects are situated in the North Sea, more than 100km off England’s north-east coast, with the output anticipated to meet the annual electricity needs of roughly three million UK households.

Approval for the DBS wind farms follows a development consent order (DCO) application submitted in June 2024.

The Planning Inspectorate reviewed more than 1,000 documents and hosted ten online examination hearings before consent was granted on 14 May 2026.

This DCO allows for the installation of up to 100 turbines at each site, along with subsea export cables delivering power to shore near Skipsea, underground cabling and new converter stations south-west of Beverley in the East Riding of Yorkshire.

The electricity will be transferred to the proposed Birkhill Wood National Grid substation near Creyke Beck, with construction roads and compounds supporting onshore and offshore works.

The projects secured contracts for difference through the UK Government’s Allocation Round 7 in January 2026.

RWE and Masdar now plan to carry out final design and procurement activities, targeting a final investment decision in 2027.

The developers say the wind farms could benefit businesses and communities across Yorkshire, the Humber and the wider UK.

In addition to the DBS announcement, the North Falls offshore wind farm received approval for its DCO.

North Falls will be developed by RWE and SSE Renewables as a JV, and will be located approximately 40km from the East Anglia Coast. It will serve as an extension to the Greater Gabbard offshore wind farm.

Approved plans include up to 57 turbines, two offshore substation platforms and supporting infrastructure.

North Falls is expected to produce around 1GW of electricity, enough to supply several hundred thousand UK homes annually. Detailed design work will continue to determine the final capacity to be installed.

Welcoming the news, RenewableUK CEO Tara Singh said: “These projects will draw in billions of pounds of private investment in vital new clean energy infrastructure and create hundreds of new jobs during their development, construction and operation, as well as fresh opportunities for UK supply chain companies.”

The government stated that these approvals contribute to a total of up to 4GW of new offshore wind capacity.