惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

云风的 BLOG
云风的 BLOG
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
IT之家
IT之家
Recent Announcements
Recent Announcements
B
Blog
D
Docker
V
V2EX
GbyAI
GbyAI
L
LangChain Blog
博客园 - Franky
U
Unit 42
T
The Blog of Author Tim Ferriss
A
About on SuperTechFans
博客园 - 【当耐特】
Google DeepMind News
Google DeepMind News
H
Hackread – Cybersecurity News, Data Breaches, AI and More
Vercel News
Vercel News
博客园_首页
D
DataBreaches.Net
人人都是产品经理
人人都是产品经理
Y
Y Combinator Blog
量子位
Blog — PlanetScale
Blog — PlanetScale
罗磊的独立博客

Power Technology

APAC dominates solar PV additions globally, forecasts GlobalData - Power Technology DEME secures offshore wind turbine installation contract in Japan SSE reports 4% drop in annual profit for March 2026 ContourGlobal launches Victor Jara hybrid plant in Chile Centre Manche seeks approval for 1.5GW offshore wind project Opening the UK grid to competition could cut bills and boost growth Bangladesh solar PV capacity to reach 8.5GW by 2035, forecasts GlobalData - Power Technology Client Challenge Qualitas Energy funds 211MW battery projects in Italy New episode: Glut or shortage - what lies ahead for LNG? - Power Technology RWE secures CIS Tender 7 for 1.1GW Theodore Wind Farm Egypt solar PV capacity to reach 34.3GW by 2035, forecasts GlobalData - Power Technology South Korea's nuclear power to reach 219.2TWh by 2035, forecasts GlobalData - Power Technology Nordex begins production at new rotor blade plant in Türkiye AirPlus Renewables prepares for UK launch of XEVA edge wind turbine - Power Technology AIKO wins modules contract for Nefer Benban solar project Spearmint Energy secures $450m for Red Egret BESS project Sungrow to supply 7.5GWh of storage for Masdar's RTC project Grenergy to deploy 1.5GWh of CATL batteries at Oviedo Escuderos Statkraft to reinvest Nkr80bn in Norwegian hydropower - Power Technology CIM unveils Permanent Power Company with $400m support Offshore Technology Conference: OTC 2026 in review - Power Technology ASL selects AGL, Enel X for 532MW of new NSW firming capacity Sunraycer secures $901m for Texas solar and storage projects UK grants development consent for offshore wind farms Iberdrola launches 195MW Tâmega Norte wind farm in Portugal South America reshapes its hydropower future amid climate, investment and AI pressures - Power Technology Cadeler installs inaugural commissioned monopile at Hornsea 3 IAEA leads Venezuela HEU removal - Power Technology Why gas engine power plants are crucial in the energy transition
Ontario approves 230kV Red Lake transmission expansion
Shree Mishra · 2026-04-24 · via Power Technology

The transmission line will extend from the Dryden Transformer Station to the Red Lake Switching Station via Ear Falls.

The anticipated completion date of the project is in the early 2030s. Credit: wing-wing/Shutterstock.com.

Ontario, under Energy and Mines Minister Stephen Lecce, has authorised Hydro One Networks to oversee the development and construction of the 230kV double-circuit Red Lake Transmission Line in north-western Ontario.

The Red Lake Transmission Line will extend from the Dryden Transformer Station to the Red Lake Switching Station via Ear Falls, reinforcing energy capacity and reliability in the region.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

The anticipated completion date is in the early 2030s.

Once completed, the 162km Red Lake Transmission Line is projected to increase electricity capacity in the region by approximately 400MW, nearly four-times the current capacity.

It aims to improve grid stability for remote communities and the broader area.

Close collaboration with First Nations is planned through Hydro One’s equity partnership model, allowing local First Nations to invest in up to 50% equity in the transmission line.

Hydro One capital portfolio delivery executive vice-president Ryan Docherty said: “Ontario’s long-term growth depends on strong and reliable electricity infrastructure. The Red Lake Transmission Line will support northern reliability, enable growth and help power communities north of Dryden.

“We continue to work with First Nations as partners to develop these projects, ensuring they reflect local priorities and support economic reconciliation. We thank the government for its continued trust as we invest in a strong and secure electricity system for the future.”

Designating this as a priority project by the provincial government expedites the regulatory process through the Ontario Energy Board, providing certainty for development and enabling further engagement with indigenous communities.

The transmission line is a strategic part of Ontario’s efforts to bolster infrastructure and economic growth, contributing to job creation and investment in the mining-rich northern region.

Lecce said: “Our government is on a mission to grow our economy by generating more reliable hydropower in the north and electrifying one of Ontario’s most mineral-rich regions with a new transmission line.

“We are accelerating the transmission line to power new mines, strengthen energy security and create good jobs. Ontario’s plan will unlock more than 5,800 good-paying jobs and unlock $830m [C$1.14bn] in economic potential, all delivered in true partnership with First Nations.”