惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Engineering at Meta
Engineering at Meta
D
Docker
IT之家
IT之家
博客园_首页
罗磊的独立博客
V
V2EX
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
美团技术团队
Y
Y Combinator Blog
博客园 - 聂微东
量子位
阮一峰的网络日志
阮一峰的网络日志
GbyAI
GbyAI
Microsoft Security Blog
Microsoft Security Blog
博客园 - Franky
Martin Fowler
Martin Fowler
Jina AI
Jina AI
大猫的无限游戏
大猫的无限游戏
C
Check Point Blog
月光博客
月光博客
G
Google Developers Blog
B
Blog
T
The Blog of Author Tim Ferriss
爱范儿
爱范儿

Power Technology

APAC dominates solar PV additions globally, forecasts GlobalData - Power Technology DEME secures offshore wind turbine installation contract in Japan SSE reports 4% drop in annual profit for March 2026 ContourGlobal launches Victor Jara hybrid plant in Chile Centre Manche seeks approval for 1.5GW offshore wind project Opening the UK grid to competition could cut bills and boost growth Bangladesh solar PV capacity to reach 8.5GW by 2035, forecasts GlobalData - Power Technology Client Challenge Qualitas Energy funds 211MW battery projects in Italy New episode: Glut or shortage - what lies ahead for LNG? - Power Technology RWE secures CIS Tender 7 for 1.1GW Theodore Wind Farm Egypt solar PV capacity to reach 34.3GW by 2035, forecasts GlobalData - Power Technology South Korea's nuclear power to reach 219.2TWh by 2035, forecasts GlobalData - Power Technology Nordex begins production at new rotor blade plant in Türkiye AirPlus Renewables prepares for UK launch of XEVA edge wind turbine - Power Technology AIKO wins modules contract for Nefer Benban solar project Spearmint Energy secures $450m for Red Egret BESS project Sungrow to supply 7.5GWh of storage for Masdar's RTC project Grenergy to deploy 1.5GWh of CATL batteries at Oviedo Escuderos Statkraft to reinvest Nkr80bn in Norwegian hydropower - Power Technology CIM unveils Permanent Power Company with $400m support Offshore Technology Conference: OTC 2026 in review - Power Technology ASL selects AGL, Enel X for 532MW of new NSW firming capacity Sunraycer secures $901m for Texas solar and storage projects UK grants development consent for offshore wind farms Iberdrola launches 195MW Tâmega Norte wind farm in Portugal South America reshapes its hydropower future amid climate, investment and AI pressures - Power Technology Cadeler installs inaugural commissioned monopile at Hornsea 3 IAEA leads Venezuela HEU removal - Power Technology Why gas engine power plants are crucial in the energy transition
IESO signs 20-year contracts for 14 renewable energy proj...
2026-04-13 · via Power Technology

The new contracts deliver a 21% cost reduction compared with previous large-scale renewable agreements.

The selection comprises 12 solar projects and two wind projects. Credit: Peter Adams Photography/Shutterstock.com.

Ontario’s Independent Electricity System Operator (IESO) has signed 20-year agreements for 14 renewable energy projects through its Long-Term 2 – Energy Stream 1 Request for Proposals (LT2(e-1) RFP), aiming to introduce more than three terawatt-hours of electricity supply annually.

The selection comprises 12 solar projects and two wind projects, all designed to meet the growing energy demands projected for the early 2030s in Ontario.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

The newly secured contracts were awarded through competitive bidding, enabling the IESO to obtain these resources at a cost 21% lower than previous large-scale renewable contracts in the region.

Indigenous communities play a prominent role, with each of the 14 projects involving at least 50% indigenous equity ownership.

Additionally, projects located within municipalities received Municipal Support Confirmations, demonstrating local community engagement from the proposal stage onward.

The projects include the 15.75MW Chatsworth Solar Project in the Township of Chatsworth; the 167.2MW CarbonFree Fort Frances Project in the unincorporated territory of the Rainy River District; the 154MW CarbonFree Kynoch Project in Iron Bridge, Algoma District; the 60MW CarbonFree Rainy River Project in the Township of Chapple; and the 200MW Dunns Valley Solar Project in Searchmont on Crown land.

The projects also include the 19.2MW Elmbrook Agrivoltaics Project in Picton, Prince Edward County; the 57.2MW Fort Frances Solar Project in the Town of Fort Frances; and the Gichigami Wind Project in Nipigon on Crown land, which will generate wind power with a capacity of 200MW.

The projects also include the 9MW Golden Leaf Agrivoltaics facility in Perth and the 17.6MW Cedar Agrivoltaics site in Hanover. The Massey Solar Project in the Township of Sables-Spanish Rivers has a capacity of 141.25MW and Paradis Bay Solar in North Cobalt adds 50MW.

In addition, the Northern Breeze Wind Project in the Thunder Bay area provides 200MW of wind capacity, while the Timmins Mountjoy Solar Project in the City of Timmins contributes a further 23.9MW.

The LT2(e-1) marks the first extensive undertaking for large-scale renewable developments in the country for more than ten years.

The outcomes from the initial phase of the LT2 capacity stream are anticipated in June. Additionally, three more LT2 phases are scheduled, making it the most extensive electricity procurement effort in Ontario’s history.

As demand surges and the energy landscape evolves, the IESO’s procurement efforts continue to focus on ensuring that future energy and capacity needs are met.

Planning forecasts indicate that the new energy and capacity needs will emerge beyond 2029, and the IESO will continue its series of RFP submission windows to meet these demands.