惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
WordPress大学
WordPress大学
T
Tailwind CSS Blog
V
Visual Studio Blog
月光博客
月光博客
Hugging Face - Blog
Hugging Face - Blog
小众软件
小众软件
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园 - Franky
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Last Week in AI
Last Week in AI
阮一峰的网络日志
阮一峰的网络日志
量子位
有赞技术团队
有赞技术团队
酷 壳 – CoolShell
酷 壳 – CoolShell
Apple Machine Learning Research
Apple Machine Learning Research
博客园_首页
Jina AI
Jina AI
雷峰网
雷峰网
博客园 - 【当耐特】
博客园 - 叶小钗
美团技术团队
宝玉的分享
宝玉的分享
IT之家
IT之家

Power Technology

APAC dominates solar PV additions globally, forecasts GlobalData - Power Technology DEME secures offshore wind turbine installation contract in Japan SSE reports 4% drop in annual profit for March 2026 ContourGlobal launches Victor Jara hybrid plant in Chile Centre Manche seeks approval for 1.5GW offshore wind project Opening the UK grid to competition could cut bills and boost growth Bangladesh solar PV capacity to reach 8.5GW by 2035, forecasts GlobalData - Power Technology Client Challenge Qualitas Energy funds 211MW battery projects in Italy New episode: Glut or shortage - what lies ahead for LNG? - Power Technology RWE secures CIS Tender 7 for 1.1GW Theodore Wind Farm Egypt solar PV capacity to reach 34.3GW by 2035, forecasts GlobalData - Power Technology South Korea's nuclear power to reach 219.2TWh by 2035, forecasts GlobalData - Power Technology Nordex begins production at new rotor blade plant in Türkiye AirPlus Renewables prepares for UK launch of XEVA edge wind turbine - Power Technology AIKO wins modules contract for Nefer Benban solar project Spearmint Energy secures $450m for Red Egret BESS project Sungrow to supply 7.5GWh of storage for Masdar's RTC project Grenergy to deploy 1.5GWh of CATL batteries at Oviedo Escuderos Statkraft to reinvest Nkr80bn in Norwegian hydropower - Power Technology CIM unveils Permanent Power Company with $400m support Offshore Technology Conference: OTC 2026 in review - Power Technology ASL selects AGL, Enel X for 532MW of new NSW firming capacity Sunraycer secures $901m for Texas solar and storage projects UK grants development consent for offshore wind farms South America reshapes its hydropower future amid climate, investment and AI pressures - Power Technology Cadeler installs inaugural commissioned monopile at Hornsea 3 IAEA leads Venezuela HEU removal - Power Technology Why gas engine power plants are crucial in the energy transition Matrix connects two new renewable projects to Spanish grid
Iberdrola launches 195MW Tâmega Norte wind farm in Portugal
Shree Mishra · 2026-05-15 · via Power Technology

The wind farm, part of the Tâmega Complex, is the first grid-connected wind-hydro hybrid project on the Iberian Peninsula.

The complex includes two wind farms integrated with a substantial pumped-storage hydroelectric system. Credit: Iberdrola, S.A.

Iberdrola has commissioned the 195MW Tâmega Norte wind farm, situated between Braga and Vila Real in Portugal’s Cabeceiras de Basto and Montalegre municipalities.

The Tâmega Norte wind farm, part of the Tâmega Complex, is the first grid-connected wind-hydro hybrid project on the Iberian Peninsula.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

The complex includes two wind farms, north and south, integrated with a substantial pumped-storage hydroelectric system. This setup enables the technologies to work together, storing energy for release as needed by the grid.

The farms aim to reduce CO₂ emissions by more than 230,000t annually, comparable to the carbon absorption of millions of trees or the yearly emissions of around 100,000 vehicles.

Tâmega Norte utilises 27 Vestas wind turbines, each generating 7.2MW with a rotor height of 172m.

The project timeline was challenged by spring and summer weather and environmental conditions including impacts on local wildlife, which disrupted the construction schedule.

At peak construction, around 150 people were employed across transport, installation, crane operations, health and safety, and supervision roles, including personnel from Vestas.

The Tâmega Norte wind farm is expected to produce approximately 414GW-hours (GWh) annually, with Tâmega Sul adding 185GWh once completed.

The electricity distribution will use the existing infrastructure, connecting via the Red Eléctrica Nacional hub at Ribeira de Pena from the Daivões and Gouvães substations.

The two wind farms represent a total investment of €346m ($404.6m), with €237m allocated to Tâmega Norte and €109m to Tâmega Sul.

The project involves multiple international and national suppliers including Haizea Wind and Vestas, along with Portuguese civil engineering companies.

Development has followed environmental licence conditions, with Iberdrola implementing measures to minimise environmental impact.

The project is funded by the European Investment Bank, with Norges Bank partnering with a 49% stake upon completion.

Technologies employed include BladeLifter for transporting large turbine blades through terrains without extensive road alterations. This technique minimised the environmental footprint and preserved local landscapes.

In February this year, Iberdrola completed the sale of its French onshore renewable energy portfolio to Technique Solaire.

The agreement involves transferring 118MW of operational wind assets along with a development pipeline of 639MW in onshore wind and solar photovoltaic projects.