惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

I
InfoQ
S
SegmentFault 最新的问题
N
Netflix TechBlog - Medium
B
Blog
Jina AI
Jina AI
人人都是产品经理
人人都是产品经理
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
H
Hackread – Cybersecurity News, Data Breaches, AI and More
博客园 - 聂微东
Last Week in AI
Last Week in AI
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
V
V2EX
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
大猫的无限游戏
大猫的无限游戏
U
Unit 42
J
Java Code Geeks
IT之家
IT之家
aimingoo的专栏
aimingoo的专栏
博客园 - 叶小钗
T
The Blog of Author Tim Ferriss
博客园 - 【当耐特】
Hugging Face - Blog
Hugging Face - Blog
WordPress大学
WordPress大学
腾讯CDC

ianVisits

London’s weekly railway news The London Buzz – 18th June 2026 Jewish Museum London awarded £1 million grant while it looks for a new home Pontoon Dock DLR upgrade delayed by a few months Stranger Things meets South Bank in Anish Kapoor’s new exhibition London Museum confirms November opening date for its new Smithfield home London Underground roundel unveiled on Japan’s Tokyo Metro Winning design chosen for Clapham railway bridge makeover London’s Pocket Parks: Sam Philp Recreation Ground, Hayes, UB3 The London Buzz – 17th June 2026 Zip wire across Twickenham stadium to raise funds for children’s charity Tickets Alert: Tours of the 350-year-old Stationers’ Hall London’s ULEZ may be easing pressure on hospitals Floating temples and porcelain heads in the V&A’s new art show Visiting St Mary’s Church, Buttsbury in Essex The London Buzz – 16th June 2026 London’s Shaftesbury Theatre to be renamed after Dame Judi Dench Tickets Alert: See a miniature model of the Victorian artists Leighton House ImberBus 2026 reveals timetable and £10 all-day fare Barbara Hepworth’s colourful side revealed in new Courtauld exhibition London–Bedford railway to be closed for two consecutive weekends Tickets Alert: Tours of the ancient Westminster School Exhibition explores the thinking behind TfL’s trial bus shelter upgrades The London Buzz – 15th June 2026 Gandhi autograph and suffragette protests among treasures in new London archive Tower of London doubles price of late-night Ceremony of the Keys Exhibition celebrates the women who made a living painting dogs Lumo to launch Starlink based Wi-Fi on East Coast trains this autumn Government strips Epping Forest Council of major planning powers London’s Alleys: Bride Court, City of London, EC4
Parliament spending £2m a week to stop crumbling palace f...
ianVisits · 2026-06-25 · via ianVisits

The cost of the major repairs needed for the Houses of Parliament is rising by up to £420 million per year due to ongoing delays in starting work on it.

Victoria Tower from Millbank Tower (c) ianVisits

That comes from a National Audit Office report into the ongoing issue of what to do with the crumbling edifice of the UK Parliament estate. It’s an issue that’s been kicked down the grass for so long that the scaffolding poles that prop up parts of the building are in danger of becoming heritage items themselves.

Parliament currently spends around £1.5 million a week on maintenance of the Palace, including major refurbishment projects. This is forecast to increase to around £2 million a week between 2026 and 2030.

Although Parliament passed an act that will allow funding for the restoration works, there’s still a lot of debate about how they will be carried out.

The most cost-effective and least risky option for the project would be to empty the building entirely and relocate politicians elsewhere during the works.

Politicians are unhappy with the idea and are considering alternatives, such as partially emptying the building and relocating offices during the restoration works. That pushes costs up considerably and adds a decade or more to the delivery time.

Some of the options would take so long that a stonecarver could start work on the project as an apprentice, and still be working on it the day they retire.

The costs range from £11 billion to an eye-watering £56 billion.

However, each year of delay is estimated to add £320 million to £420 million to the overall cost of delivering the Programme. That’s mainly due to inflation, but also the longer the damage is left unrepaired, the more damage is caused, and repairs end up costing more to carry out.

While politicians dither and delay, the independent Restoration and Renewal Programme is seeking an initial £3 billion for a seven-year set of repairs, and also the work to develop and acquire temporary accommodation for the Houses – if they agree to move out.

In the meantime, look for mice running around behind politicians when they give interviews on the telly.

The full report is here.