惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

WordPress大学
WordPress大学
Project Zero
Project Zero
Engineering at Meta
Engineering at Meta
Microsoft Azure Blog
Microsoft Azure Blog
小众软件
小众软件
T
The Blog of Author Tim Ferriss
S
SegmentFault 最新的问题
量子位
V
Visual Studio Blog
F
Full Disclosure
博客园 - 叶小钗
Recent Announcements
Recent Announcements
G
Google Developers Blog
博客园 - Franky
F
Fortinet All Blogs
有赞技术团队
有赞技术团队
B
Blog
aimingoo的专栏
aimingoo的专栏
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
N
Netflix TechBlog - Medium
L
LINUX DO - 最新话题
S
Security @ Cisco Blogs
Google DeepMind News
Google DeepMind News
B
Blog RSS Feed
Cloudbric
Cloudbric
Exploit-DB.com RSS Feed
Exploit-DB.com RSS Feed
Last Week in AI
Last Week in AI
SecWiki News
SecWiki News
H
Hackread – Cybersecurity News, Data Breaches, AI and More
云风的 BLOG
云风的 BLOG
阮一峰的网络日志
阮一峰的网络日志
N
News and Events Feed by Topic
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
Microsoft Security Blog
Microsoft Security Blog
D
DataBreaches.Net
人人都是产品经理
人人都是产品经理
Schneier on Security
Schneier on Security
Webroot Blog
Webroot Blog
T
Troy Hunt's Blog
P
Proofpoint News Feed
Application and Cybersecurity Blog
Application and Cybersecurity Blog
Jina AI
Jina AI
PCI Perspectives
PCI Perspectives
Martin Fowler
Martin Fowler
O
OpenAI News
Hacker News: Ask HN
Hacker News: Ask HN
S
Secure Thoughts
P
Privacy International News Feed
I
InfoQ
C
Cyber Attacks, Cyber Crime and Cyber Security

Hacker News - Newest: "AI"

AI can't read an investor deck AI as an attorney? Student uses ChatGPT, Gemini to sue UW over alleged racial discrimination Hacking MCP Servers in AI Systems – The Rug Pull: Tool Changes After Approval GitHub - MeepCastana/KubeezCut: Free Web based video editor GitHub - GenAI-Gurus/awesome-eu-ai-act: Curated tools, official sources, OSS, templates, and guides for EU AI Act compliance. Can AI judge journalism? A Thiel-backed startup says yes, even if it risks chilling whistleblowers Coming soon: 10 Things That Matter in AI Right Now DARPA built an AI to fact-check enemy weapons claims What explains heterogeneity in AI adoption? When AI Meets Muscle: Context-Aware Electrical Stimulation Promises a New Way to Guide Human Movements - Department of Computer Science AI Changed How We Build. It Did Not Change What Matters. Linux rules on using AI-generated code - Copilot is OK, but humans must take 'full responsibility for the… Meta spins up AI version of Mark Zuckerberg to engage with employees Code Mode: Let Your AI Write Programs, Not Just Call Tools | TanStack Blog GitHub - Delavalom/graft: Go framework for building AI agents. Type-safe tools, multi-provider (OpenAI, Anthropic, Gemini, Bedrock), zero vendor SDKs. India's TCS tops estimates, says new AI models did not dent services demand Gen Z's fading AI hype Strong feeling: we are in a folded AI reality GitHub - machinarii/total-recall-catalog: A reference catalog of latest knowledge retrieval, memory & RAG systems GitHub - mensfeld/code-on-incus: Give each AI agent its own isolated machine with root, Docker, and systemd. Active defense detects and stops threats automatically.. Quantization, LoRA, and the 8% Problem: Benchmarking Local LLMs for Production AI Iran war: We spoke to the man making Lego-style AI videos that experts say are powerful propaganda Powell, Bessent discussed Anthropic's Mythos AI cyber threat with major U.S. banks GitHub - immartian/bellamem: Persistent belief-graph memory for AI agents. Retrieves decisive context by importance — not recency, not RAG, not /compact. recursive-mode: The Repo-Native Operating System for AI Engineering After the attack on Sam Altman's home, will AI CEO's go on the offensive? The biggest advance in AI since the LLM Opus 4.6 vs GPT 5.4 One Prompt Unity World Generation Test “AI polls” are fake polls Client Challenge Can AI be a 'child of God'? Inside Anthropic's meeting with Christian leaders How to Switch AI Chatbots and Why You Might Want To GitHub - MattMessinger1/agentic_refund_guardrail: Safe refund policy layer for AI agents — Python + TypeScript. Same behavior, shared tests. Adam/papers/emergent_values_whitepaper.md at master · strangeadvancedmarketing/Adam Ask HN: How do you stop playing 20 questions with your AI coding tools How far can automation and AI support psychotherapy? - @theU GitHub - stagas/rtdiff: realtime git diff gui and AI-assisted commits A Mac Studio for Local AI — 6 Months Later A History of the Early Years of AI at the University of Edinburgh Why AI Coding Tools Still Feel Stuck on Localhost MSN AI Datacenters Are Becoming Strategic Targets twitter.com Penn Researchers Use AI to Surface Unreported GLP-1 Side Effects in Reddit Posts Show HN: MoodSense AI (ML and FastAPI and Gradio, Deployed on Hugging Face) Moodsense Ai - a Hugging Face Space by aman179102 AI models are terrible at betting on soccer—especially xAI Grok GitHub - xialeistudio/echoic GitHub - HimashaHerath/github-dev-wrapped: AI-powered weekly GitHub activity reports deployed to GitHub Pages GitHub - alejandrobalderas/claude-code-from-source: Architecture, patterns & internals of Anthropic's AI coding agent — reverse-engineered from source maps AI and Tech brief: Ireland ascendant GitHub - Titovilal/context0: Context0 - Never Surrender Training for a Marathon with an AI Coach: What Worked and What Didn't Cyber Pulse: Agentic Intel - Apps on Google Play I Built an AI PR Reviewer That Catches Bugs by Not Looking for Bugs Gen Z workers are so fearful AI will take their job they’re intentionally sabotaging their company’s AI rollout | Fortune How AI Is Reimagining the Game of Golf–For Both Players and Courses GitHub - nattergabriel/reseed: A CLI tool for managing and distributing agent skills across projects Is SVG the final frontier? My AI workflow evolved from prompts to a near-autonomous workflow MLSharp Help - 3DGS Viewer & Generator I put my cognitive field based AI's runtime on GitHub Is Numble the first AI-proof game? A3: Kubernetes for autonomous AI agent fleets | Emergent Principles Deepali Vyas ("The Elite Recruiter") GitHub - msmarkgu/RelayFreeLLM: A restful API designed to route user prompts to various AI model providers. Unionized ProPublica staff are on strike over AI, layoffs, and wages Unleashing the Advantage of Quantum AI We're heading for an AI-fueled 'dementia crisis,' brain scientist warns The AI-Assisted Breach of Mexico's Government Infrastructure [pdf] GitHub - stef41/lmscan: 🔍 Detect AI-generated text and fingerprint which LLM wrote it. Open-source GPTZero alternative. Zero dependencies, works offline. MSN GitHub - visionscaper/collabmem: Enabling long-term collaboration with Agentic AI - building up episodic and world model memory over time with in-context awareness We gave an AI a 3 year retail lease in SF and asked it to make a profit | Andon Labs AI Code is Hollowing Out Open Source, and Maintainers are Looking the Other Way What leaked "SteamGPT" files could mean for the PC gaming platform's use of AI AI is the boss at this retail store. What could go wrong? GitHub - Wuzu11517/agentic-proxy: Local proxy meant to help reduce With Drones, Geophysics and ArtificiaI Intelligence, Researchers Prepare to Do Battle Against Land Mines A Single Operator, Two AI Platforms, Nine Government Agencies: The Full Technical Report 在 Steam 上购买 FriedrichAI: Offline AI 立省 10% GitHub - inevolin/resume-cli: Hit Claude usage limits? Resume any AI coding session elsewhere. Switch tools at zero friction. GitHub - atripati/ark: AI Runtime Kernel — a context operating system for AI agents. Eliminates tool bloat, loads only what’s needed, and gives LLMs their reasoning space back. How to Build a Secure AI PR Reviewer with Claude, GitHub Actions, and JavaScript This Startup Wants You to Pay Up to Talk With AI Versions of Human Experts Intel Arc Pro B70 Brings 32GB VRAM to Local AI for $949 WordPress 7.0: The Good, the AI, and the Still Missing AI on the couch: Anthropic gives Claude 20 hours of psychiatry IatroBench: Pre-Registered Evidence of Iatrogenic Harm from AI Safety Measures AI Agents Know About Supabase. They Don't Always Use It Right. The history and future of AI at Google, with Sundar Pichai Inside an AI‑enabled device code phishing campaign How Meta Used AI to Map Tribal Knowledge in Large-Scale Data Pipelines AI for Systems: Using LLMs to Optimize Database Query Execution Forecasting the Economic Effects of AI Introducing Tinker: Play with AI, bring your ideas to life AI sheds light on an ancient gaming mystery People really hate AI but not as much as Iran—or Democrats | Fortune What is an AI Product Engineer? Phoebe Gates wants her $185 million AI startup to succeed with 'no ties to my privilege or my last name': 'I have a chip on my shoulder' | Fortune
What Leopold's $5.5B portfolio reveals about powering the AI boom
agordhandas · 2026-04-27 · via Hacker News - Newest: "AI"

TL;DR: There are nine ways to get electricity to a data center. Leopold Aschenbrenner’s $5.5B hedge fund is concentrated in the two that deliver power fastest, and last week Oracle validated the bet. This piece walks through all nine.

Leopold Aschenbrenner made $1.3 billion last week. He is 24.

He had $875 million riding on the stock of a company called Bloom Energy. Last week, Oracle signed a deal to buy 2.8 gigawatts of fuel cells from Bloom Energy1. Bloom’s stock jumped 24% the next day, hit an all-time high, and closed the week up 60%. By Friday Aschenbrenner’s Bloom position was worth roughly $2.2 billion2.

Two years ago, OpenAI fired him. His version is that he raised security concerns internally and got pushed out. He responded by publishing “Situational Awareness,” a 165 page essay predicting AGI by 20273, and starting a hedge fund with the same name.

Here is the part that should bother you if you allocate capital. In Q4 2025, Aschenbrenner exited Nvidia entirely. He had been holding puts against the stock, actively shorting the consensus AI trade. He closed out Broadcom and TSMC the same quarter. Then he put the money into a fuel cell manufacturer, seven Bitcoin mining companies, and CoreWeave call options. A fund built on an AGI thesis had become, to a large extent, a power infrastructure fund.

And last Monday, Oracle validated the bet.

His read is simple: the market has priced in the demand for compute. It has not priced in what powers the compute

The numbers explain why he might be right. Meta’s planned Hyperion campus in Richland Parish, Louisiana will draw 5GW at full build, the output of five nuclear reactors, for one building complex. AWS’s Project Rainier in Indiana is the first campus to reach 1GW. Across the industry, roughly 550 planned data centers carry a combined power requirement of about 125 GW. S&P Global projects US data center power demand will roughly triple, from about 50GW in 2024 to 134 GW by 2020.

Those numbers land in a context that makes them much scarier. For twenty years, from roughly 2005 to 2023, US electricity demand was flat. LED lighting, deindustrialization, efficiency mandates and the 2008 recession had decoupled economic growth from electricity consumption. The entire power sector, from utility capital plans to workforce pipelines, had calibrated to zero load growth. Utilies stopped hiring linemen at replacement rates.

Then came the age of LLMs. Starting in 2023, the flatline broke. AI training clusters consuming hundreds of megawatts each began appearing in grid queues that were never designed for them. The US plugged a new industrial revolution in to a system built for maintenance mode.

Leopold’s portfolio is a bet on who solves that problem. Last week’s Oracle deal was the first proof point.

There are exactly nine ways to get power to a data center. Leopold’s holdings concentrate on the ones he thinks work on realistic timescales.

The grid is of course the default option, but it’s also broken. Connecting anything new to it currently takes five to seven years. Behind-the–meter generation, building your own power plant on your own site bypasses the grid completely. That is the escape route. Then there are the emerging paths, geothermal, nuclear, better transmission technology. Each of these have a different timeline and a different probability of succeeding.

Leopold is not spread across all nine. He is concentrated in two, the ones that deliver power on the timescale AI needs it, not the timescale the grid operates on. His largest positions are a fuel cell company and a set of bitcoin miners. To understand why, you need to understand what each of those businesses is.

Bloom Energy was Aschenbrenner's largest position at the time of his Q4 2025 filing: $876 million, 21% of the portfolio. After last week's Oracle deal sent the stock up 60%, that position is worth roughly $2.2 billion.

Bloom makes solid oxide fuel cells (SOFCs). The distinction from a gas turbine matters. A gas turbine burns natural gas: combustion, a spinning shaft, a generator. An SOFC converts natural gas to electricity electrochemically, the same basic principle as a battery but with fuel flowing through continuously, which means there is no spinning parts or combustion. The result is 54% electrical efficiency (versus 35% for a simple-cycle gas turbine), rising above 90% when you capture the waste heat. Emissions are near zero for NOx and SOx because nothing is burning.

That emissions profile is load-bearing for the investment thesis. An SOFC installation can often be permitted locally, without the air quality reviews and state PUC proceedings that a combustion turbine triggers. In a regulatory environment where permitting timelines determine project viability, that advantage converts directly to speed.

The speed is the point. A Bloom deployment takes 12 to 18 months from contract to electrons. That is faster than a gas plant (two to three years), faster than a solar farm with storage (two to four years depending on interconnection), and dramatically faster than a grid interconnection (five to seven years). The fuel cells sit on the customer’s site, behind the utility meter, and do not require a grid interconnection agreement at all.

In the first quarter of 2026, the deals came fast. Oracle signed a master services agreement for up to 2.8 GW of Bloom fuel cells to power data centers. AEP finalized a $2.65 billion, 20-year agreement for up to 1 GW. Brookfield committed a $5 billion financing framework for Bloom deployments. That is $7.65 billion in committed deals in roughly 90 days. Bloom is now racing to double its manufacturing capacity from 1 GW to 2 GW annually4.

The open question is scale. Bloom has proven the technology at 10 to 50 MW deployments. The new contracts call for hundreds of megawatts, eventually gigawatts, at single campuses. Scaling an electrochemical manufacturing process by 10x or more is not the same as scaling a software product. It requires ceramic supply chains, quality control at volume, and field reliability data that does not yet exist at the target scale. Whether Bloom can deliver 500 MW to a single campus with the same reliability it demonstrated at 50 MW is not proven. That is the bet Leopold is making. It is his largest position because he (presumably) believes the answer is yes.

The second concentration in the portfolio is a cluster of Bitcoin mining companies. Core Scientific at roughly $419 million, Riot Platforms at $78 million, Hut 8 at $40 million, plus smaller positions in Cipher Mining, CleanSpark, Bitfarms, and Bitdeer.

These are not crypto bets. They are infrastructure bets. To understand why, you need to understand the interconnection queue.

Every new generator or large electrical load that wants to connect to the US power grid must go through a formal study process managed by the regional grid operator (PJM, MISO, ERCOT, or one of the other ISOs). The grid operator has to model what happens to power flows across the entire system when the new project plugs in. Does any transmission line overload? Does any substation exceed its rating? The study identifies every piece of equipment that needs to be upgraded before the project can connect, and the applicant typically pays for those upgrades. The process has three sequential stages (feasibility study, system impact study, facilities study), each taking months to more than a year. The total timeline, from application to an executed interconnection agreement, averages five to seven years in congested regions like PJM5.

There are currently about 2,600 GW of projects waiting in interconnection queues nationwide. For context, total US installed generation capacity is about 1,300 GW. The queue is roughly twice the size of the entire existing system. Most of those projects will never be built (completion rates run 20 to 30 percent), but the real ones still have to wait behind the speculative ones while studies proceed. FERC Order 2023 attempted to fix this by shifting from serial studies to cluster studies and requiring financial deposits upfront to deter speculative filings, but the reform is still being implemented and the backlog is measured in years.

This is why Bitcoin miners are valuable to Leopold’s thesis. Miners arrived early. They applied for grid connections years ago, endured the study process, signed interconnection agreements, and built substations and cooling systems on land they own. They have the three things an AI data center needs most: a signed interconnection agreement (the legal right to pull power from the grid), physical infrastructure (land, substations, cooling), and a power contract with known pricing. Each of those took years to obtain. You cannot replicate them quickly.

Core Scientific has already pivoted significantly toward AI hosting. It signed a 12-year, 200 MW deal with CoreWeave in 2024 to convert mining capacity to AI compute hosting6. The economics make sense: AI hosting generates higher and more stable revenue per megawatt than Bitcoin mining. The rest of the mining companies face the same calculation. They can mine Bitcoin at thin margins, or they can lease their power and infrastructure to AI companies at a premium. The interconnection agreement is the asset. The Bitcoin mining was just the original use case.

Behind the meter refers to the arrangement where power is generated at the same site that it’s used, effectively bypassing the grid altogether. If time is the biggest cost, behind the meter is a tempting setup. A new interconnection to the grid takes 3-5 years. Behind the meter generation short circuits that (no pun intended), and the limiting function becomes simply how long it takes to fire up the power generation.

Meta is building ten gas plants at its Richland Parish campus in Louisiana alone7. A 200 MW plant at its New Albany, Ohio, campus, approved in 20258. A $473 million, 366 MW plant in El Paso that will exclusively serve Meta’s data center for its first five years.

The economics are straightforward. A combined-cycle gas plant costs $800 to $1,200 per kilowatt to build and produces electricity at $50 to $80 per megawatt-hour depending on gas prices. It takes two to three years from decision to first power. That is too slow for the AI training cycle (which moves in 18-month increments) but far faster than a grid interconnection. And because the plants sit behind the meter on the data center site, they bypass the queue entirely.

The constraint on this path is the gas pipeline, not the power grid. Securing a new gas interconnection is its own multi-year process, and pipeline capacity in many regions is already committed. But in Louisiana, Texas, and parts of the Midwest where pipeline infrastructure is dense, the path from decision to power is as direct as it gets for large-scale generation.

This is the ugly bridge. Burning gas to power AI while claiming carbon neutrality through offsets and renewable energy credits is not a story anyone wants to tell, but it is the story that is actually happening. For the current demand shock, behind-the-meter gas is the fastest path to hundreds of megawatts of reliable power. The hyperscalers know it. Their procurement teams are acting accordingly.

Small modular reactors (SMRs) are nuclear reactors with output under ~300 MW, designed to be factory-built in modules and shipped to site on trucks rather than custom-constructed on location like traditional gigawatt-scale plants (Vogtle, for example). Think: Ikea furniture equivalent of nuclear power plants. The pitch is shorter construction timelines, lower upfront capital, and standardized designs that get cheaper with each unit.

NuScale was the furthest along. It had an NRC design certification, a customer (Utah Associated Municipal Power Systems), and a site. In late 2023, the project was canceled when costs rose from $58 to $89 per megawatt-hour and the customer walked away9.

Kairos Power, X-energy, and TerraPower are still developing their designs. Kairos uses fluoride salt cooling. X-energy uses high-temperature gas. TerraPower’s Natrium design uses liquid sodium. All three are technically interesting, however none will produce commercial power before 2030 at the earliest. NRC licensing alone takes years. First-of-a-kind construction risk is severe, as every nuclear project in recent US history has demonstrated.

An obvious question: if you can put a gas plant behind the meter, why not a reactor? Skip the grid entirely, put an SMR on your data center campus. Some micro-reactor companies, like Sam Altman’s Oklo, are pitching exactly this. The problem is that a behind-the-meter gas plant needs air quality permits. A behind-the-meter nuclear reactor needs NRC site-specific licensing, a security perimeter, an emergency planning zone, armed guards, spent fuel storage, and a decommissioning bond. The physical footprint might be small, but the regulatory footprint is anything but.

For the demand shock happening right now, between 2024 and 2028, small modular reactors will unfortunately not contribute anything. The technology may matter in the 2030s, but it does not matter for the capital allocation decisions being made today. This is relevant because nuclear power purchase agreements (PPAs) are being signed by hyperscalers (Microsoft with Constellation for Three Mile Island Unit 1 restart, Google with Kairos, Amazon with X-energy and Talen), but the power from these won’t get delivered for a few years.

Traditional geothermal requires naturally occurring underground heat near the surface, limiting it to Iceland, parts of California, and a few spots in Nevada. Fervo Energy changed the question by applying horizontal drilling techniques from the fracking revolution to geothermal wells. Drill deep, fracture hot rock, circulate fluid, extract heat. Their insight was that the oil and gas industry have spent decades perfecting precision drilling and hydraulic stimulation. That entire workforce and technology base transfers to generating geothermal energy.

Google is the signal to watch here. In 2023, Fervo’s pilot project in Nevada (Project Red) delivered 3.5 MW of 24/7 carbon-free energy to the grid supplying Google’s data centers. That was proof of concept. Then Google kept going: a 400 MW project in Beaver County, Utah (Cape Station), with first power expected by 2026 and full operation by 2028. Fervo raised $462 million Series E round in December 2025, with Google participating. In April 2026, a non-binding framework agreement for up to 3 GW of geothermal capacity by 2033 was signed between Google and Fervo10.

Three gigawatts is serious. That is more than the entire existing US geothermal fleet. Google is not doing this for the press release — it has access to better energy market data than most utilities, and it is writing checks that only make sense if the technology works at scale.

Fervo’s pilot results suggest costs could reach $50 to $70 per megawatt-hour. The output is baseload (runs 24/7, unlike solar or wind), carbon-free, and has a small physical footprint. Scaling from a pilot well field to gigawatts requires proving that the drilling economics hold across different geologies, that reservoir performance sustains over years, and that the supply chain for deep drilling rigs can support dozens of simultaneous projects. Those are real questions. But if the answers come back positive, geothermal is the only option that runs 24/7, produces zero carbon, and does not need the grid.

This is the path nobody talks about.

The rated capacity of a transmission line is based on worst-case assumptions: hottest day of the year, no wind, maximum conductor sag. In reality, conditions are usually better. Dynamic line rating (DLR) systems, built by companies like LineVision, attach sensors to existing lines that measure actual conductor temperature and wind conditions in real time, allowing operators to push 20 to 40% more power through the same wires. Advanced power flow controllers from companies like Smart Wires actively redirect electricity across parallel transmission paths, reducing congestion on overloaded lines by shifting load to underutilized ones. Topology optimization software reconfigures switching patterns to improve flows with no new hardware at all.

DLR sensors cost thousands of dollars per mile. A new transmission line costs millions per mile. The capacity gain is immediate. Installation takes months. Permitting is trivial compared to new construction. By any rational engineering or economic metric, grid-enhancing technologies should be deployed across every congested transmission corridor in the country.

They are not deployed at scale, and the reason is structural. US utilities operate under cost-of-service regulation: they earn a rate of return on capital they invest. Build a $2 billion transmission line, earn a regulated return on $2 billion for 40 years. Install $20 million in DLR sensors that deliver comparable capacity gains, earn a return on $20 million. The utility’s financial incentive is to build new expensive things, not to optimize existing ones. This is not a conspiracy; it is the predictable outcome of a regulatory structure designed for a different era.

FERC Order 1920 (2024) included provisions encouraging the adoption of such grid enhancing tech, but “encouraging” is not “requiring,” and utility incentive structures remain unchanged. This is a pure market failure: a proven, cheap, fast technology that does not get deployed because the entities responsible for deployment are financially penalized for using it.

Readers familiar with power transmission likely know that most of the world transmits power in the form of AC (alternating current). The reasons are mostly rooted in history, but recent advances in technology have made possible the transmission of high voltage power in a DC (direct current) form.

China has built over 10,000 miles of high-voltage direct current transmission lines, carrying hydropower from western provinces to eastern load centers across distances that would lose unacceptable amounts of energy on AC lines. The US has almost none.

HVDC converts alternating current to direct current at one end, transmits it over long distances with very low losses, and converts back at the other end. It also allows connecting the three US interconnections (Eastern, Western, ERCOT) that cannot share AC power directly. The total transfer capacity between the Eastern and Western Interconnections today is approximately 1,300 MW, carried by a handful of small DC links. A single hyperscale campus now draws 300 to 500 MW. The bridges between the three machines are smaller than one announced campus.

Two major US HVDC projects are under construction. SunZia, 550 miles from New Mexico to Arizona, will deliver 3,500 MW and is the largest clean energy infrastructure project in US history. Champlain Hudson Power Express will carry Canadian hydropower to New York City. Each took roughly a decade from conception to construction start. The Clean Line Energy projects, well-funded and well-designed HVDC proposals, failed entirely due to permitting opposition and state-by-state siting fights.

The pattern is clear. HVDC is the right long-term technology for moving large amounts of power across the US. The US institutional and regulatory environment makes building it extraordinarily difficult. Each project faces NEPA review, state siting authority in every state it crosses, eminent domain battles, and cost allocation disputes. A single landowner or a single state commission can delay a billion-dollar project for years.

A microgrid assembles solar panels, batteries, small generators, and sometimes fuel cells into a locally managed power system that can operate independently of the main grid. This works well at the 1 to 20 MW scale: a military base, a hospital complex, a remote facility.

It does not work at hyperscale. An AI training cluster needs hundreds of megawatts to gigawatts of continuous, perfectly reliable power. Assembling that from dozens of small distributed sources, each with its own intermittency profile and failure mode, does not match the reliability requirement. No hyperscaler is building a gigawatt-scale microgrid. The concept solves a different problem.

Leopold’s portfolio is a thesis about time.

Fuel cells deliver power in 12 to 18 months. Bitcoin miner conversions deliver power now, because the infrastructure already exists. Gas plants deliver in two to three years. Geothermal might deliver in five. Nuclear might deliver in ten. Grid reform and HVDC might deliver in twenty. He is concentrated in the paths that produce megawatts on the timescale AI companies will pay for them, not the timescale regulators, utilities, and construction crews operate on.

You can disagree with his specific positions. Maybe Bloom cannot scale manufacturing fast enough. Maybe the Bitcoin miners are overvalued relative to their power contracts. Maybe gas plants face emissions regulations that slow them down. But the structural read is hard to argue with: the market has spent two years pricing in AI compute demand and almost no time pricing in the physical infrastructure that makes compute possible. The semiconductor supply chain responds to price signals on 18-month cycles. The power grid responds on 10-to-20-year cycles. That mismatch is the trade.

This newsletter covers the plumbing. Each piece that follows goes deeper into these questions.

If the power problem determines who wins the AI buildout, understanding it early is worth real money. That goes for hedge funds sizing infrastructure bets, developers choosing sites, and regulators deciding how fast to let it all happen. The demand is here. The grid is not.

1

Oracle Corporation and Bloom Energy, expanded Master Services Agreement announcement (April 13, 2026). Bloomberg, “Oracle Agrees to Buy Power From Bloom for AI Data Centers” (April 14, 2026). CNBC, “Oracle jumps for a second day, Bloom Energy soars 22% on AI data center power deal” (April 14, 2026).

2

Benzinga, "24-Year-Old Turns $875 Million Into $2.2 Billion Via Bloom Energy Stock" (April 14-15, 2026).

4

Oracle Corporation and Bloom Energy, Master Services Agreement announcement; Bloom energy announces gigawatt fuel cell procurement agreement with AEP to power AI data centers; Brookfield and Bloom Energy Announce $5 Billion Strategic AI Infrastructure Partnership

5

Lawrence Berkeley National Laboratory, “Queued Up” report (latest edition, 2025). Queue size (~2,600 GW), completion rates (20-30%), and average timelines cited here. FERC Order 2023 (issued July 2023) introduced cluster study reforms and financial commitment requirements.

6

Core Scientific and CoreWeave, 12-year hosting agreement (press release). 200 MW of data center capacity converted from Bitcoin mining to AI compute hosting.

7

Meta orders ten gas-fired power plants for its Hyperion AI campus in rural Louisiana […] (article)

8

New 200-MW Gas-Fired Plant in Ohio Will Power Meta Data Center (article)

9

NuScale Power and Utah Associated Municipal Power Systems, Carbon Free Power Project cancellation (November 2023).