惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
T
The Blog of Author Tim Ferriss
博客园 - 司徒正美
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
有赞技术团队
有赞技术团队
量子位
S
SegmentFault 最新的问题
博客园 - 聂微东
博客园 - 【当耐特】
J
Java Code Geeks
美团技术团队
Hugging Face - Blog
Hugging Face - Blog
H
Help Net Security
V
V2EX
人人都是产品经理
人人都是产品经理
博客园 - Franky
罗磊的独立博客
Engineering at Meta
Engineering at Meta
A
About on SuperTechFans
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
酷 壳 – CoolShell
酷 壳 – CoolShell
云风的 BLOG
云风的 BLOG
Y
Y Combinator Blog
Apple Machine Learning Research
Apple Machine Learning Research

Hacker News: Best

madhadron - The seven programming ur-languages GitHub - smol-machines/smolvm: Tool to build & run portable, lightweight, self-contained virtual machines. I Measured Claude 4.7's New Tokenizer. Here's What It Costs You. Introducing Claude Design by Anthropic Labs It Is Time to Ban the Sale of Precise Geolocation The creative software industry has declared war on Adobe Isaac Asimov: The Last Question Newly unsealed records reveal Amazon’s price-fixing tactics, California attorney general claims Clojure - Documentary Android CLI and skills: Build Android apps 3x faster using any agent Qwen3.6-35B-A3B on my laptop drew me a better pelican than Claude Opus 4.7 Codex:全能型助手 Introducing Claude Opus 4.7 Qwen Studio The Future of Everything is Lies, I Guess: Where Do We Go From Here? Virginia Bans Sale of Geolocation Data YouTube now lets you turn off Shorts Burgers | マクドナルド公式 ChatGPT for Excel Ask HN: Who is using OpenClaw? Live Nation illegally monopolized ticketing market, jury finds Google Broke Its Promise to Me. Now ICE Has My Data. Open Source Isn't Dead. The Future of Everything is Lies, I Guess: New Jobs Unexpected €54k billing spike in 13 hours: Firebase browser key without API restrictions used for Gemini requests IPv6 – Google Your Backpack Got Worse On Purpose Good sleep, good learning, good life Fixing a 20-year-old bug in Enlightenment E16. Does Gas Town 'steal' usage from users' LLM credits & paid services to improve itself?
Energy minister plans 'nuclear renaissance' with up to 10...
Nick Murray · 2026-06-23 · via Hacker News: Best

Politics

The federal government is looking to build up to 10 new nuclear reactors over the next 15 years, with at least one of them outside of Ontario.

New federal nuclear strategy could cost more than $100B, officials say

· The Canadian Press ·

Text to Speech Icon

Listen to this article

Estimated 5 minutes

The audio version of this article is generated by AI-based technology. Mispronunciations can occur. We are working with our partners to continually review and improve the results.

A man in a suit standing in the House of Commons.
Energy and Natural Resources Minister Tim Hodgson said the nuclear strategy was necessary for Canada's ambition to double the capacity of its electricity grid. (Adrian Wyld/The Canadian Press)

Canada is looking to build up to 10 new nuclear reactors over the next 15 years, sell Canadian-made reactors to more countries and double uranium exports, Energy Minister Tim Hodgson said Monday as he released a new national strategy for nuclear power.

Hodgson called it a plan for a "new civilian nuclear renaissance" as the federal government looks to double the capacity of the country's electrical grid by 2050.

"If our goal is to double our grid and build a low-carbon economy in less than 25 years, there is no credible plan to do that without nuclear energy and the clean, reliable baseload power it provides," Hodgson told a news conference in Newmarket, Ont.

"There is no credible plan for Canada to become an energy superpower if we choose not to build upon one of the strongest energy advantages we have."

WATCH | Minister says strategy would create tens of thousands of jobs:

Canada's nuclear strategy will lead 'to at least a doubling' of industry jobs: minister

Announcing Canada's new nuclear strategy on Monday, Energy Minister Tim Hodgson said the government believes its new national strategy for nuclear power — which aims to build up to 10 new reactors over the next 15 years — will double employment in the sector, 'going from roughly 90,000 jobs today to 180,000-plus jobs in the coming decades.'

The strategy calls for construction to start on two new large-scale reactors by 2035, for five more to be planned or under development by 2040 and for at least one reactor to be under construction outside Ontario by 2035.

It also calls for a Canadian-made microreactor to be finalized by 2035 and deployed to a remote community by the late 2030s.

Taking questions from reporters in Vancouver ahead of the announcement, Conservative Leader Pierre Poilievre said he wasn't sold on the plan.

"An announcement will not build anything," he said.

"And this is the problem we've had with the Carney Liberals is their promises are being reported on as results and so far there have been no results."

Right now, Canada has four nuclear power plants — three in Ontario and one in New Brunswick — which generate about 15 per cent of Canada's electricity.

A new proposed facility at the existing nuclear plant in Darlington, Ont., would see the first small modular reactor in the G7, capable of producing up to 300 megawatts per unit. Saskatchewan is also looking at the potential to bring small nuclear reactors online by the mid 2030s.

The energy deal between Ottawa and Alberta also committed to collaborating on developing a strategy to build a nuclear power plant.

Officials from Natural Resources Canada told reporters in a background briefing that construction of the reactors outlined in the new national strategy could cost more than $100 billion.

The strategy does not say how Canada would pay for them, though an official pointed to the Canadian Infrastructure Bank and the Canada Growth Fund as possible funding sources.

Hodgson said the strategy would double the 90,000 jobs in Canada's nuclear sector "over the coming decades."

Carney's ethics screen in place

The plan also looks to expand sales of Candu reactors to new export markets. It says the government wants to break into at least four new international markets by 2040 and "engage six to 10 new nuclear entrant markets over a 15-year horizon, cementing Canada as their partner of choice."

Thirty Candu reactors currently operate around the world, including in South Korea, China, India, Argentina, Pakistan and Romania, and there are plans to build two more.

The document says Prime Minister Mark Carney was not shown the strategy and government officials said he had no role in developing it due to the ethics screen he has in place.

Carney had stock options and deferred shares in both Brookfield Corporation and Brookfield Asset Management that were put into a blind trust after he became prime minister. Candu competes with a reactor model co-owned by Brookfield.

The move to sell Candu to new markets is an attempt to establish Canada as a reliable uranium export partner and to use nuclear energy as a geopolitical lever.

"Reactor exports are not transactional. They establish multi-decade partnerships, creating durable geopolitical and commercial relationships that advance Canada's broader foreign policy interests," the strategy says.

"As Canada works to diversify its trading relationships and strengthen ties with middle powers, Candu can be a central instrument of that strategy."

WATCH | Carney, Ford announced small modular reactor investment in 2025:

Carney, Ford announce $3B combined investment in small modular reactors

Prime Minister Mark Carney announced $2 billion in federal funding and Ontario Premier Doug Ford announced the province will invest $1 billion to build Canada’s first small modular reactors, new nuclear energy technology to be built next door to the Darlington power plant.

If Ottawa fails to sell more Candu reactors worldwide, the strategy suggests Canada look into boosting domestic uranium enrichment to fuel other reactors.

Unlike most other nuclear reactors, Candu reactors don't require enriched uranium. Ottawa says Western allies are turning away from Russia, one of the world's key suppliers of enriched uranium.

Earlier this year, the government launched a discussion paper which proposed having impact assessments for nuclear projects be handed over to the Canadian Nuclear Safety Commission from the Impact Assessment Agency of Canada.

The strategy on Monday reaffirmed that proposal, however it has not been implemented while the government consults on it. The consultation period was extended last month after pushback from environment and Indigenous groups.

"Our approach is to repeal the anti-development laws, depoliticize the Canadian Nuclear Safety Commission, stop the Liberal obstacles so that we can actually produce more affordable and abundant electricity and other forms of energy across the country," Poilievre said.

"But the focus has to be on results, not yet more promises and illusions."

ABOUT THE AUTHOR

Nick Murray is a reporter with The Canadian Press.