

























Abstract:Tie-line power (TLP) shaping is a key requirement for the grid-friendly operation of industrial microgrids (IMGs). This paper studies the coordination of multi-timescale heterogeneous adjustable resources in a steel IMG to shape a grid-friendly TLP trajectory considering multiple objectives. A sequential heterogeneous-agent coordination (SHAC) framework is proposed, where process loads, hydrogen storage, and battery storage are modeled as functionally heterogeneous agents with cross-role observations, asynchronous decision intervals, role-specific rewards and critics. This design captures the heterogeneous temporal effects of different resources on the TLP trajectory and alleviates ambiguous credit assignment and weak inter-agent coordination. To ensure feasible real-time execution, process-knowledge-based action masking and feasibility projection are embedded into policy execution, and a role-aware multi-timescale actor--critic training scheme is developed for agents with different action structures and decision intervals. Numerical studies using real renewable generation and electricity market data show that SHAC effectively eliminates the dependence on predefined reference trajectories and enables adaptive 1-min online decision-making, achieving zero production failures with an average computational time of only 0.4 ms per step. Compared with the original operation, SHAC reduces the total grid purchase cost, contract-demand exceedance time, and cumulative ramp excess by 91.27\%, 98.64\%, and 96.91\%, respectively. These results demonstrate that the proposed framework improves the economic efficiency and grid friendliness of industrial microgrid operation while satisfying strict process-safety constraints and real-time computational requirements.
From: Daniyaer Paizulamu [view email]
[v1]
Wed, 24 Jun 2026 09:06:12 UTC (3,006 KB)
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。