惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

The GitHub Blog
The GitHub Blog
Martin Fowler
Martin Fowler
Vercel News
Vercel News
U
Unit 42
Engineering at Meta
Engineering at Meta
aimingoo的专栏
aimingoo的专栏
MyScale Blog
MyScale Blog
Y
Y Combinator Blog
阮一峰的网络日志
阮一峰的网络日志
爱范儿
爱范儿
Apple Machine Learning Research
Apple Machine Learning Research
博客园_首页
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
B
Blog RSS Feed
N
Netflix TechBlog - Medium
GbyAI
GbyAI
F
Fortinet All Blogs
MongoDB | Blog
MongoDB | Blog
大猫的无限游戏
大猫的无限游戏
C
Check Point Blog
M
MIT News - Artificial intelligence
D
Docker
IT之家
IT之家
Stack Overflow Blog
Stack Overflow Blog

Hacker News: Front Page

SPICE simulation → oscilloscope → verification with Claude Code — Lucas Gerads Introducing Claude Opus 4.7 Qwen Studio The Future of Everything is Lies, I Guess: Where Do We Go From Here? GitHub - SeanFDZ/macmind: Single-layer transformer in HyperTalk for the classic Macintosh Show HN: Agent-cache – Multi-tier LLM/tool/session caching for Valkey and Redis Ancient DNA reveals pervasive directional selection across West Eurasia [pdf] AI cybersecurity is not proof of work Moving a large-scale metrics pipeline from StatsD to OpenTelemetry / Prometheus GitHub - Nightmare-Eclipse/RedSun: The Red Sun vulnerability repository GitHub - SethPyle376/hiraeth: Local AWS emulator focused on fast integration testing, with SQS support, SQLite-backed state, and a debug-friendly web UI. A Better Ludum Dare; Or, How to Ruin a Legacy GitHub - macOS26/Agent: Any AI, replaces Claude Code, Cursor, OpenClaw. Over 18 LLM providers (Claude, OpenAI, Gemini, Ollama, Zai, HF, Qwen) wired into a native Mac app that writes code, builds Xcode projects, bumps versions, manages git, automates Safari, use AppleScript, JS or Accessibility, extend Agent! w/ MCP Servers, run tasks from your iPhone via Messages. YouTube now lets you turn off Shorts I Made a Terminal Pager Burgers | マクドナルド公式 Commands — HackerNews CLI documentation ChatGPT for Excel PiCore - Raspberry Pi Port of Tiny Core Linux Live Nation illegally monopolized ticketing market, jury finds Google Broke Its Promise to Me. Now ICE Has My Data. Founding Engineer at Adaptional | Y Combinator CRISPR takes important step toward silencing Down syndrome’s extra chromosome GitHub - saffron-health/libretto: The AI toolkit for building reliable browser automations US v. Heppner (S.D.N.Y. 2026) no attorney-client privilege for AI chats [pdf] Unexpected €54k billing spike in 13 hours: Firebase browser key without API restrictions used for Gemini requests Fragments: April 14 Cal.com Goes Closed Source: Why AI Security Is Forcing Our Decision | Cal.com - Scheduling Software for Online Bookings Laravel raised money and now injects ads directly into your agent Codex Hacked a Samsung TV
1.4 GW: Huge battery storage at former Grohnde nuclear po...
2026-04-30 · via Hacker News: Front Page

In 2021, the Grohnde nuclear power plant in Lower Saxony on the Weser River was shut down. Now, immediately next to it, the Emmerthal energy cluster is growing with three very large battery storage systems, ground-mounted photovoltaic systems, and a new substation for several 380-kilovolt high-voltage lines.

The villages of Grohnde and Kirchohsen on the Weser River belong to the municipality of Emmerthal. This municipality has decided to approve up to three battery storage systems (BESS) on a maximum of 35 hectares of land in the “Energiecluster Emmerthal”.

According to public documents from the municipality, three BESS projects from the operators Green Energy Storage Initiative (GESI), FRV, and Elements Green have already received commitments for their respective grid connections.

The connection to large power lines will be via the new Emmerthal substation (UW), which the grid operator TenneT is building. It replaces the previous Grohnde substation, whose capacity is no longer sufficient. The Emmerthal substation will couple two 380 kV power lines, which are also to be reinforced, with several 110 kV lines. The future RheinMainLink power line runs close by.

In this region, the RheinMainLink runs parallel to the SüdLink, which is already under construction and is also designed as a 525 kV underground cable with High Voltage Direct Current (HVDC) transmission. The two lines are only about 19 kilometers apart in this area.

Apparently, the operators of BESS near the two new north-south power lines hope to buy wind power surpluses from northern Germany cheaply and sell them at a higher price to southern Germany when needed.

Update

Originally, the report stated that the Emmerthal substation offered a connection to the RheinMainLink power line. However, according to the current planning status, no HVDC converter station is planned there, which would be necessary for such a coupling.

For both RheinMainLink and SüdLink, HVDC converters are currently only planned at the respective endpoints of the lines. Therefore, the battery power can only flow through the alternating current lines, which are mapped by, for example, ENTSO-E.

Map Emmerthal energy cluster, planning 2025

Site plan of the Emmerthal energy cluster, as of March 1, 2025

(Image: Gemeinde Emmerthal)

The operators GESI and FRV have already published relatively concrete plans for their BESS in the Emmerthal energy cluster. GESI intends to install containers with Lithium Iron Phosphate (LiFePo) batteries, which will store a total of 3.84 gigawatt-hours (GWh) of energy and deliver up to 870 megawatts (MW) of power. This is referred to as a 4-hour system because a complete discharge would take that long.

FRV is also planning a 4-hour system: The BESS “Grohnde III” is intended to store 2.4 GWh and deliver up to 600 MW. It cooperates with a 53-hectare ground-mounted PV system operated by Solizer in direct proximity, which is supposed to deliver a peak output of 72 MW (MWp). Due to changes in tender conditions, large solar power projects and battery storage systems are increasingly being planned together. The two BESS from GESI and FRV alone, with 1.47 GW, deliver more power than the former Grohnde nuclear power plant with its net 1.36 GW.

The British project developer Elements Green, on the other hand, has not yet provided any data for Emmerthal. However, Elements Green plans to invest two billion euros in Germany and is building, among other things, a 400 MW BESS in Elsfleth. If Elements Green also builds 400 MW in Emmerthal, the site will have a total capacity of 1.87 GW and store 7.8 GWh.

Update: According to the website battery-charts.de, large battery storage systems with a total capacity of 5.2 GWh are currently in operation in Germany, capable of delivering around 3.2 GW of power. According to this, another 10 GWh are to be put into operation by the end of 2027. So-called home storage systems in Germany currently already have a capacity of more than 21 GWh. The figures on battery-charts are derived from the Market Master Data Register (MaStR).

It is still unclear when exactly the battery storage systems in Emmerthal will become operational. The operators mention years starting from 2026. However, the 25-hectare Emmerthal substation is not scheduled to be completed until the end of 2030. RheinMainLink could provide a transport capacity of approximately 8 GW from 2033. SüdLink (4 GW) hopes for completion of construction work by 2028.

Construction site of Kyon Energy's battery storage near Alfeld on September 21, 2025.

Construction site of Kyon Energy's battery storage near Alfeld on September 21, 2025. In the background, the Godenau substation.

(Image: Christof Windeck / heise medien)

The respective project developers are often not the operators of a BESS in the end. For example, Allianz Global Investors (Allianz GI) recently acquired 51 percent of GESI. The 137 MW BESS currently being built by Kyon Energy in Alfeld has in turn been sold to the Danish investor Obton. It is located at the Godenau substation, about 27 kilometers as the crow flies from the Emmerthal energy cluster and near the SüdLink line. However, it is connected via the Lamspringe substation to the new 380 kV Wahle-Mecklar line.

Originally, the companies Hansa Battery and Kyon Energy had also planned two other, smaller BESS in Emmerthal, but have abandoned these plans.

The Emmerthal energy cluster also provides for commercial areas to attract businesses. The municipality intends to favor local and medium-sized companies to avoid causing too much additional road traffic. The nearest motorway connection to the A2 is more than 30 kilometers away.

The grid operator TenneT intends to strengthen the existing 380 kV lines in the region through “re-stringing”. According to information from the provider Wiretec, special aluminum-steel overhead line cables can withstand temperatures up to 150 degrees Celsius and thus higher currents. This means that the current-carrying capacity of the “hot cables” should be up to 50 percent higher than that of old cables with the same diameter and similar weight per kilometer. Additionally, a black coating can improve heat radiation.

From the previous Grohnde substation, a 90-kilometer-long 380 kV connection leads, among other things, to the substation at the former Mehrum coal-fired power plant, which is currently being demolished. A large data center, also a BESS, and possibly a new gas-fired power plant are planned there.

(ciw)

Don't miss any news – follow us on Facebook, LinkedIn or Mastodon.

This article was originally published in German. It was translated with technical assistance and editorially reviewed before publication.