






















SAP XI DEV step.
1、log on XI
2、config. SLD,enter System Landscape Directory
2.0 Products: create product,
2.1 Software Components:create Software Components
2.2 Technical System:create tech .system and assign Software Components done above
2.3 Business System: create Business system according to Tech. system.
3、Integration Repository
3.0 Import Software components from SLD
3.1 create DataType
3.2 create MessageType
3.3 create MessageInterface
3.4 create MessageMapping
3.5 create Interface Mapping
4、Integration Directory
If there'is Scenario in IR ,Transfer integaration scenarion from IR.
4.0 create Party ,apply to the system with many interfaces or sub-systems.usually needn't do this step for common dev.
4.1 Assign business system
4.2 create Business Service
4.3 config. Communication Channel
4.4 config. Receiver Determination
4.5 config. Interface Determination
4.6 config. Sender Agreement :it's not necessary for IDOC
4.7 config. Receiver Agreement
refere to :http://blog.csdn.net/heicm/archive/2009/09/07/45226421.aspx
test my signature
posted on 2009-09-24 21:27 NextStep-V 阅读(237) 评论() 收藏 举报
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。