惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

有赞技术团队
有赞技术团队
M
MIT News - Artificial intelligence
Hugging Face - Blog
Hugging Face - Blog
博客园 - 聂微东
量子位
S
SegmentFault 最新的问题
V
Visual Studio Blog
博客园 - 【当耐特】
Apple Machine Learning Research
Apple Machine Learning Research
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
小众软件
小众软件
Stack Overflow Blog
Stack Overflow Blog
Vercel News
Vercel News
D
Docker
J
Java Code Geeks
博客园 - 三生石上(FineUI控件)
博客园 - Franky
Recent Announcements
Recent Announcements
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
MongoDB | Blog
MongoDB | Blog
D
DataBreaches.Net
Y
Y Combinator Blog
云风的 BLOG
云风的 BLOG
V
V2EX

IT Jungle

Finally: Some Pricing Information On The Power S1112 Entry Server - IT Jungle Rocket Automates Manual IBM i Tasks With AI - IT Jungle Guru: Where’s The Table? - IT Jungle LaserVault Goes iSCSI With Virtual Tape Library - IT Jungle IBM i PTF Guide, Volume 28, Number 31 - IT Jungle Will Power Chips Get A Converged Arm Instruction Set Like Z Mainframe CPUs? - IT Jungle Thinking About Moving IBM i To The Cloud? Don't Start With The Quote - IT Jungle Precisely To Add Ransomware Protection In MIMIX 11 - IT Jungle It’s D-Day For Cybersecurity, AI Firms Warn - IT Jungle IBM i PTF Guide, Volume 28, Number 30 - IT Jungle Oracle Dips A Toe Into IBM’s EBCDIC World - IT Jungle When Your Small IBM i Team Is Really A Team Of One - IT Jungle Guru: Putting Failure Handling In Its Place - IT Jungle Inside The Security Enhancements In ACS - IT Jungle IBM i PTF Guide, Volume 28, Number 28: A Crazy Number of Security Vulnerability Patches - IT Jungle IBM i PTF Guide, Volume 28, Number 29 - IT Jungle IBM i PTF Guide, Volume 28, Number 28: A Crazy Number of Security Vulnerability Patches - IT Jungle Inside The Encryption Key Management Changes In IBM i 7.6 - IT Jungle FalconStor Moved To The Blue Lagoon, And Is Poised For Growth Because Of It - IT Jungle Guru: Claude’s SQL Tip - IT Jungle Astera Makes Extracting Legacy Report Data an AI Specialty - IT Jungle IBM i PTF Guide, Volume 28, Number 27 - IT Jungle Welcoming The New IBM i Chief Architect And Other New Top Brass - IT Jungle A Deep Dive Into That Power S1112 Entry Power11 Server - IT Jungle Guru: Beyond Three-Part Naming – Running SQL Across Remote IBM i Systems - IT Jungle How IBM Bolstered IBM i Resilience In The Summer Tech Refreshes - IT Jungle IBM i PTF Guide, Volume 28, Number 26 - IT Jungle Power Systems Has A Great Quarter; System Z, Not So Much - IT Jungle Does AI Mark The End Of The ERP Era? - IT Jungle Guru: Deterministic Application Development With AI - IT Jungle
What Can IBM Do To Make The Future Power S1112 Mini Syste...
2026-04-13 · via IT Jungle

April 13, 2026

The Power11-based Power Systems lineup remains incomplete, with the single-socket, half-width “Bonnell” system that debuted back in May 2024 still only available with Power10 processors and not yet upgraded to Power11. We know such a machine is in the works, because Big Blue has been clear about the need to ship a machine in the IBM i P05 software tier, the lowest rung on the IBM i ladder.

We have not heard anything precise about the Bonnell kicker, and we would have thought it would have been launched in February or March. It has not. It is reasonable to expect it to come out around the time of the POWERUp 2026 conference, which runs from May 19 through 22 in New Orleans. It would be unusual if that were not the case, but we live in unusual times. IBM may be in no hurry to put a new Bonnell machine into the field even though it does really need to give customers who want Power11 a P05-class system.

Right now, if you want a new P05-class machine, you can use the Power S1012 Bonnell machine, or a regular rack or tower configuration of the Power S1014 with only four cores activated on the system board. There are also Power8 and Power9 machines that have lower core counts that are priced in the P05 tier as well.

In the absence of the Bonnell kicker based on Power11, we are wondering what IBM might do to improve upon the Bonnell design. The Power11 package has some power distribution and efficiency enhancements that have allowed for the clock speeds to be raised a few percent, so it is reasonable to expect that. This would not be much of a barn burner announcement when you put it that way. In a real sense, Power11 was only an incremental step.

We would like for IBM to do better, and do something specifically for P05 customers.

The first thing is to create a hybrid disk-flash storage sled that slides in next to the Bonnell compute tray. Something that manages the placement of data on the disk and the flash to optimize for price/performance on storage, not for raw performance. We live in a world where main memory and flash prices are going nuts, and if the Power S1112 Bonnell+ system is going to do right by entry IBM i customers, it should aim for a lower-cost storage option because entry customers are very price sensitive. IBM can’t just assume they will spend more on flash than they do on compute. Considering that P05 machines with one to four cores running IBM i often have crimped main memory, it is important to have IBM i do hierarchical storage management across main memory, flash, and disk transparently and efficiently.

The second thing we would do, and this is particularly true for any single-core and maybe dual-core machines, is to overclock the hell out of the CPUs. In theory, the Power11 chip can get up into the 5 GHz range. Many IBM i shops could give a care about energy efficiency, but they would care if their many batch jobs finished a lot faster. The overclocking could be keyed, in fact, to nighttime batch runs, not to online transaction processing workloads commonly embodied in ERP, CRM, and SCM systems that typically run on the IBM i platform.

The third thing we would do is offer shadow Red Hat Enterprise Linux partitions with IBM’s AI tools running in those partitions so customers can get a feel for how they might start adding AI functions to their applications. A starter kit version of the Watson.X stack would be appropriate, with wizards to link to it and possibly Project Bob acting as a front end to integrate AI development with VS Code IDEs. If IBM wants to get customers using its AI tools, the IBM i base is the biggest customer base that it has in terms of unique customers, even if it does not drive as much revenues as the AIX on Power and System z mainframe bases. You have to bring all customers along for the GenAI ride.

It seems very unlikely that IBM will offer the Power11-based Bonnell+ kicker that the same price as the discounted Power10-based Bonnell system from two years ago, but that would be nice. Call that ask number four, then.

We wonder how well the Bonnell machines sold, and what IBM’s enthusiasm is for the effort. Big Blue has been pretty quiet about it. But then again, it is generally pretty quiet about Power Systems and spends a lot of its time talking up System Z mainframes. Just go to the IBM homepage and try to find Power Systems or IBM i without using the search engine and you will see what I mean.

So as a fifth ask, we would like that to change. We would like IBM to talk as much about Power Systems as it does System Z.

RELATED STORIES

Stacking Up Entry IBM i-Power11 Systems Against Windows X86 Platforms

Stacking Up Power10 And Power11 Systems Price/Performance

Bang For The Buck On Entry Power10 And Power11 Machines

What Price Power?

Stacking Up Power11 Entry Server Performance To Older Iron

Price Cut On Power S1012 Mini Since Power S1112 Ain’t Coming Until 2026

Power11 Entry Machines: The Power S1124 And Power L1124

With Power11, Power Systems “Go To Eleven”

What, And Who, The New Power S1012 Server Is Aimed At

Power10 Entry Machines: The Power S1012 (Deep Dive)

IBM Sharpens Its Edge With “Bonnell” Entry Power10 System

It Would be Uncommon For IBM Announcements To Not Be In May

Power10 Entry Machines: The Power S1014 (Deep Dive)

Power10 Entry Machines: The Power S1022s (Deep Dive)

Power10 Entry Machines: The Power S1022 And Power L1022 (Deep Dive)

Power10 Entry Machines: The Power S1024 And Power L1024 (Deep Dive)

The Power10 Machines That Will Take IBM i To 2025

Power S812 Gets Another Reprieve, And Other Power Systems Stuff

Entry Power S812 Gets A New – But Still Short – Lease On Life

The Necessity Of A Power Systems 911

The Bang For The Buck Of Entry IBM i Servers

The Lowdown On Pricing For The Power S812 Mini

IBM i License Transfer Deal Comes To The Power S812 Mini

IBM Gives The Midrange A Valentine’s Day (Processor) Card

More Insight Into The Rumored Power Mini System

Geared Down, Low Cost Power IBM i Box Rumored