惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

爱范儿
爱范儿
H
Help Net Security
Jina AI
Jina AI
T
The Blog of Author Tim Ferriss
宝玉的分享
宝玉的分享
博客园 - 叶小钗
Y
Y Combinator Blog
罗磊的独立博客
大猫的无限游戏
大猫的无限游戏
WordPress大学
WordPress大学
C
Check Point Blog
Recent Announcements
Recent Announcements
IT之家
IT之家
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
美团技术团队
云风的 BLOG
云风的 BLOG
雷峰网
雷峰网
H
Hackread – Cybersecurity News, Data Breaches, AI and More
S
SegmentFault 最新的问题
MyScale Blog
MyScale Blog
Apple Machine Learning Research
Apple Machine Learning Research
Microsoft Azure Blog
Microsoft Azure Blog
V
Visual Studio Blog
B
Blog

IT Jungle

Finally: Some Pricing Information On The Power S1112 Entry Server - IT Jungle Rocket Automates Manual IBM i Tasks With AI - IT Jungle Guru: Where’s The Table? - IT Jungle LaserVault Goes iSCSI With Virtual Tape Library - IT Jungle IBM i PTF Guide, Volume 28, Number 31 - IT Jungle Will Power Chips Get A Converged Arm Instruction Set Like Z Mainframe CPUs? - IT Jungle Thinking About Moving IBM i To The Cloud? Don't Start With The Quote - IT Jungle Precisely To Add Ransomware Protection In MIMIX 11 - IT Jungle It’s D-Day For Cybersecurity, AI Firms Warn - IT Jungle IBM i PTF Guide, Volume 28, Number 30 - IT Jungle Oracle Dips A Toe Into IBM’s EBCDIC World - IT Jungle When Your Small IBM i Team Is Really A Team Of One - IT Jungle Guru: Putting Failure Handling In Its Place - IT Jungle Inside The Security Enhancements In ACS - IT Jungle IBM i PTF Guide, Volume 28, Number 28: A Crazy Number of Security Vulnerability Patches - IT Jungle IBM i PTF Guide, Volume 28, Number 29 - IT Jungle IBM i PTF Guide, Volume 28, Number 28: A Crazy Number of Security Vulnerability Patches - IT Jungle Inside The Encryption Key Management Changes In IBM i 7.6 - IT Jungle FalconStor Moved To The Blue Lagoon, And Is Poised For Growth Because Of It - IT Jungle Guru: Claude’s SQL Tip - IT Jungle Astera Makes Extracting Legacy Report Data an AI Specialty - IT Jungle IBM i PTF Guide, Volume 28, Number 27 - IT Jungle Welcoming The New IBM i Chief Architect And Other New Top Brass - IT Jungle A Deep Dive Into That Power S1112 Entry Power11 Server - IT Jungle Guru: Beyond Three-Part Naming – Running SQL Across Remote IBM i Systems - IT Jungle How IBM Bolstered IBM i Resilience In The Summer Tech Refreshes - IT Jungle IBM i PTF Guide, Volume 28, Number 26 - IT Jungle Power Systems Has A Great Quarter; System Z, Not So Much - IT Jungle Does AI Mark The End Of The ERP Era? - IT Jungle Guru: Deterministic Application Development With AI - IT Jungle
Brace Yourself: Another Power Systems Price Hike Coming M...
Timothy Pric · 2026-04-20 · via IT Jungle

April 20, 2026

A few weeks ago, when we talked about the price increases on main memory and flash for Power Systems machines as well as some other price increases, we told you that this would probably not be the end of it. The market for DRAM and flash is so crazy right now that demand is well exceeding supply and that is driving up prices almost continuously. That’s because supply cannot be increased for either.

To that end, Sam Werner, general manager of IBM Storage, and Ivo Körner, vice president of worldwide sales for IBM Power, Cloud, and Storage, sent out a letter to business partners on April 10 that warns customers that price changes for storage could be made monthly, on the first of each month, “as required to reflect market conditions.”

The letter from Werner and Körner was clear that prices will be honored and locked the moment an order is placed and will not be changed by any price hikes subsequent to when an order is placed and the machinery is delivered. That said, business partners are also being told that going forward, all quotes to customers will expire at the end of month and also that they will need to refresh any system configurations that are in process at the beginning of every month.

I didn’t catch wind of the May 1 price hike, which was announced on April 10 as well, until late in the day on April 13, and we were already long since on press with our Monday issue. Which is why we are telling you about it now. As with the April 1 price hike, which I told you about here, there has been no formal customer announcement letter that I can point you to.

These price changes are cumulative. So if you had a price of something before April 1, you have to add in the April price hike and then the May 1 price hike, and in many cases, the cost of DRAM or flash modules has nearly than doubled in two months. In some cases, the price hikes are a lot larger than that.

The announcement letter to business partners provided “directional price changes” that IBM said could vary by configuration and timing, as follows:

  • FlashSystem X600 and C200 models, up 45 percent
  • Previous generation FlashSystem models, up 65 percent
  • IBM SAN Volume Controller nodes, up 10 percent
  • DS8000 R9 SAN storage arrays, up 90 percent
  • DS8000 G10 SAN storage arrays, up 25 percent
  • Virtual Tape System, up 20 percent
  • Deep Archive Servers (excluding attached libraries), up 275 percent
  • Diamondback tape drives, up 20 percent
  • Ready Node servers, up 40 percent, and
  • Power Systems servers, up 16 percent and by which we assume IBM means the base server chassis

The price on industry standard DIMM memory for Power Systems machines – which come in 32 GB, 64 GB, or 128 GB modules using DDR4 memory – have doubled. The price on higher-end differential DIMM memory has been increased by 25 percent, 30 percent, or 35 percent, depending on the type of memory and the machine it is used in. Buried in the memory announcement was a 66 percent price increase on the four-core Power11 processor that runs at a base 3.6 GHz.

As we said a few weeks ago, machines are only going to get more expensive as 2026 rolls on. So if you need to get a new system or do an upgrade, get the lead out. This supply-demand imbalance is not going away any time soon. The GenAI boom has made the hyperscalers, the cloud builders, and the AI model builders want big wonking CPUs with heavy memory and flash configurations to push the performance of their servers laden with GPUs and XPUs.

What we hear, in fact, is that all of the GPUs, all of the HBM memory, and all of the CPUs that can be made in 2026 have already been allocated to their customers and channels. IBM controls its own fate with Power10 and Power11 CPUs, of course, and in such an environment, it could probably sell a bunch if it actually had any appreciable volume made by Samsung, its foundry partner, and stockpiled in a barn somewhere.

We strongly suspect that this is not the case, but we could be wrong. It would have been nice if Power10 and Power11 had kept support for NVLink ports for memory coherency with the Nvidia GPUs and their HBM memory.

RELATED STORIES

No Joke: Big Memory And Flash Price Hikes Coming April 1

Price Increases Are Here, Or Pending, And For Sure For Memory

What Price Power?

The Power And Storage Price Wiggling Continues – Again

The Price Tweaking Continues For Power Systems

Now, IBM Is Jacking Up Hardware Maintenance Prices

Big Blue Raises IBM i License Transfer Fees, Other Prices

IBM Preserves Memory Investments Across Power10 And Power11

Power11 Takes Memory Bandwidth Up To, Well, Eleven

IBM Is Running Out Of DDR4 Memory Faster Than It Thought

IBM Tweaks Power10 Hardware: Fatter Memory, Other Stuff

IBM Doubles Up Memory And I/O On Power Iron To Bend The Downturn

IBM Tweaks Prices Up And Down On Memory And Storage

Power9 Prime Previews Future Power10 Memory Boost

The Road Ahead For Power Is Paved With Bandwidth

IBM Brings DDR4 Memory To Bear On Power Systems