惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

aimingoo的专栏
aimingoo的专栏
G
Google Developers Blog
B
Blog RSS Feed
A
About on SuperTechFans
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
V
V2EX
Stack Overflow Blog
Stack Overflow Blog
C
Check Point Blog
H
Hackread – Cybersecurity News, Data Breaches, AI and More
Engineering at Meta
Engineering at Meta
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
博客园 - 司徒正美
D
Docker
F
Fortinet All Blogs
Hugging Face - Blog
Hugging Face - Blog
Last Week in AI
Last Week in AI
H
Help Net Security
WordPress大学
WordPress大学
MyScale Blog
MyScale Blog
博客园 - Franky
人人都是产品经理
人人都是产品经理
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
Blog — PlanetScale
Blog — PlanetScale
L
LangChain Blog

NASA Science

Cosmic Origins at AAS 248, June 2026 - NASA Science Cosmic Structure SIG Seminar, 30 April 2026 - NASA Science CMB SAG Meeting, 24 April 2026 - NASA Science BBX SAG Meeting, 30 April 2026 - NASA Science Early Career Investigator Program – Earth Science (ROSES A.11) - NASA Science XR SIG Seminar, 1 May 2026 - NASA Science Night and (Earth) Day - NASA SWERV: High-Impact Historical Case Study - NASA Science AAS Meeting 248, June 2026 - NASA Science Earth Day 2026: Posters and Virtual Backgrounds - NASA Science Advancing Earth Observation at NASA since Release of Earthrise Photo - NASA Science X-59 Adds Freedom 250 Logo - NASA Belts of Green in the Washington Suburbs - NASA Science Artemis II Mission Milestones: An Image and Video Recap Curiosity Blog, Sols 4867-4872: Sand Fill In Antofagasta Crater and Finding Our Next Drill Target NASA Invites Media to Jordan Artemis Accords Signing Ceremony New NASA Views of Earth, From (S)PACE - NASA Science Crew Studies Biotech on Tuesday to Advance Health and Space Economy NASA Invests in Small Businesses Innovating for Space and Earth NASA at SXSW: Johnson Director Vanessa Wyche on Why Artemis Changes Everything Researchers: How Would You Extract Meaningful Insights from Just Four Astronauts? BBX SAG Meeting, 23 April 2026 - NASA Science Thailand’s Krabi Coast - NASA Science AI/ML STIG Lecture Series, 20 April 2026 - NASA Science SWERV: Training Overview and Agenda - NASA Science SWERV: REAL-TIME CAPABILITIES AND IONOSPHERIC DISRUPTIONS OF COMMUNICATIONS - NASA Science SWERV: Operationally Significant Phenomena and Impacts for Ground Operations - NASA Science SWERV: Space Weather Impacts on Satellites - NASA Science SWERV: Space Weather Chain of Events - NASA Science CSDA Quality Assessment Report Evaluates Satellogic NewSat Data - NASA Science
NASA’s Artemis III Moon Rocket Hardware Progressing
2026-04-29 · via NASA Science

NASA’s Artemis III Moon Rocket Hardware Arrives, Artemis II Capsule Returns to Kennedy

On the heels of a successful Artemis II test flight, teams at NASA’s Kennedy Space Center in Florida are pressing forward for the next Artemis mission. Technicians maneuvered NASA’s massive core stage of the SLS (Space Launch System) rocket inside the agency’s Vehicle Assembly Building (VAB) at NASA Kennedy on April 28 in preparation for Artemis III, as the Artemis II crew module arrived back at Kennedy for post-flight analysis. 

The Artemis III core stage will be placed horizontally in the transfer aisle of the VAB before being lifted into High Bay 2, where it will be connected to the engine section and its boat-tail, which were integrated in August 2025. At 212 feet tall when fully assembled, the core stage houses two propellant tanks that collectively hold more than 733,000 gallons of super-chilled liquid propellant to fuel four RS-25 engines, as well as the flight computers, or avionics, that act as the brains of the rocket to control flight during ascent. This marks the first time core stage assembly operations are taking place at NASA Kennedy.

Booster Motor Segments for Artemis III Processing 

Other SLS hardware for Artemis III is arriving in Florida. The first shipment of booster motor segments for the flight arrived at Kennedy on April 13. These components will form the twin solid rocket boosters for SLS, which generate more than 75% of the rocket’s thrust at liftoff. A second shipment of booster motor segments is expected this summer.

Shipped by rail across eight states in specialized transporters, the segments were manufactured by Northrop Grumman in Utah before making their journey to the spaceport. Teams are now processing the hardware inside Kennedy’s Rotation, Processing and Surge Facility, where each segment will be inspected and prepared for integration.

Once ready, the motor segments will be moved to the VAB and stacked with forward and aft assemblies to form the towering, 17-story-tall boosters. Working together with the SLS core stage and its four RS-25 engines, the boosters will help produce 8.8 million pounds of thrust—powering Artemis III and future missions as NASA continues its campaign of lunar exploration. 

Artemis II Orion Arrives at Kennedy  

Arriving on the opposite side of the spaceport after carrying NASA astronauts Reid Wiseman, Victor Glover, and Christina Koch, and CSA (Canadian Space Agency) astronaut Jeremy Hansen around the Moon and returning them safely to Earth, the Artemis II Orion spacecraft arrived back at NASA Kennedy’s Multi-Processing Payload Facility. 

Now at Kennedy, technicians will begin de-servicing operations on the spacecraft. This includes removing payloads from the crew module, removing avionics boxes for reuse, and retrieving data on the spacecraft to better understand how it performed to inform procedures and plans for future Artemis missions. Orion’s heat shield and other elements will be removed for extensive analysis, and remaining hazards such as excess propellant will be offloaded. 

While detailed Artemis II post-flight assessments are underway, engineers are completing major functional testing of the Artemis III Orion crew module at NASA Kennedy before joining it with its service module later this summer. All 186 Avcoat blocks for its upgraded heat shield have been installed, cured, and inspected. Teams also completed thermal cycle testing and ultrasonic inspections of the heat shield. The Artemis III Orion service module has successfully undergone thermal cycle testing, deployment checks of all four solar array wings, and installation of the adapter cone that connects Orion to the SLS rocket. NASA plans to integrate the crew and service modules with the launch abort system later this year. 

Next year’s Artemis III mission will launch astronauts to Earth’s orbit aboard the Orion spacecraft on top of SLS to test rendezvous and docking capabilities between Orion and commercial spacecraft needed to land Artemis IV astronauts on the Moon in 2028.