惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Recent Announcements
Recent Announcements
爱范儿
爱范儿
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
宝玉的分享
宝玉的分享
T
Tailwind CSS Blog
博客园_首页
IT之家
IT之家
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - 三生石上(FineUI控件)
有赞技术团队
有赞技术团队
大猫的无限游戏
大猫的无限游戏
雷峰网
雷峰网
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园 - 司徒正美
WordPress大学
WordPress大学
Last Week in AI
Last Week in AI
人人都是产品经理
人人都是产品经理
Jina AI
Jina AI
月光博客
月光博客
小众软件
小众软件
S
SegmentFault 最新的问题
量子位
阮一峰的网络日志
阮一峰的网络日志
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知

Front - Globes

Thu: Insurance, energy stocks lead rise "Israel can be a window to the Mediterranean" India signs $1.1b IAI tanker aircraft deal - report Indian co KPIT to acquire Israeli startup Cymotive Strengthening shekel nears NIS 2.90/$ threshold Wizz Air Israel hub talks break down Sakal makes shock bid to buy ZIM Israeli defense-tech co Kela raising $200m at $1.2b valuation Tue: Insurance stocks lead TASE higher Israel’s most expensive home up for sale TASE readying for big wave of IPOs this month AI ecommerce co ZyG raises $60m at $500m valuation Canadian real estate co Almadev plans TASE IPO Cisco to acquire Israeli co Astrix Security Rafael close to buying VW plant Mon: Nice lifts TASE to new record Israeli startup BridgeWise teams with Elon Musk�s X Leumi Partners invests NIS 200m in Landora Ministers approve two new combat aircraft squadrons Fri: Main indices rise, Tower surges Beilinson Hospital receives record donation for cancer research Thu: Main indices edge higher Keystone joining Hot Mobile acquisition Mekorot teams with nT-Tao on nuclear fusion Lufthansa Group suspends Israel flights until June Check Point disappoints on revenue, beats on profit SuperPlay earnout payments weigh on Playtika Tel Aviv Park HaMesila penthouse sells for NIS 55m Israeli credit card players eye potential of Wizz Air loyalty club Elon Musk to visit Israel next month
Soroka reconstruction plan comprises five new buildings
Yuval Nisani · 2026-05-27 · via Front - Globes
Direct missile hit on Soroka Hospital  credit: screenshot, under section 27a of the Copyright Law

Direct missile hit on Soroka Hospital credit: screenshot, under section 27a of the Copyright Law

AI forces Israeli unicorn BigID to lay off 150 Elbit Systems unit buys Israeli AI company

In June 2025, an Iranian missile hit the Beersheva hospital's surgical wing, causing huge damage. The new plan includes three 30-floor towers.

Soroka Hospital in Beersheva has a new development plan, almost a year after an Iranian missile hit the hospital’s surgical building, causing extensive damage. The Southern Planning and Building Committee has approved the plan, which calls for three towers of up to 30 floors each, and a new, reinforced in-patient building that will be called "Binyan Hatekumah" (the "Resurrection Building").

In June 2025, the hospital sustained a direct hit from an Iranian missile. Fortunately there were no fatalities in the incident; a few people were slightly hurt. This was because the building had been evacuated to an underground facility, for fear of just such a hit. The damage to the building, however, was huge: to the structure itself, and to wards, operating theaters, laboratories, professional units, and offices. An entire floor of research laboratories was completely burnt out, and eight out of nineteen operating theaters were put out of action.

The new plan calls for the construction of 230,000 square meters of space, and includes 80 hotel rooms, and 300 special housing units for hospital staff. There are also 140,000 square meters of offices and 6,500 square meters of commercial space. The plan extends over 45 dunams (11.25 acres) along Rager Boulevard from Ben Gurion Street in the north to Wingate Street in the south.

The proposed "Resurrection Building" will be a new, eleven-floor in-patient building reinforced against missile attack. This is the implementation of government decision 3449 of November 2025 which states that the Clalit Health Fund, the owner of the hospital, will construct "a new reinforced tower in the Soroka Medical Center that will provide a protective solution for at least 70% of the in-patient beds at the hospital and for other critical functions." Altogether, the plan comprises five buildings. It was drawn up by OKA Architects. The government decision budgets NIS 360 million for the project for the period 2026-2030.

Published by Globes, Israel business news - en.globes.co.il - on May 27, 2026.

© Copyright of Globes Publisher Itonut (1983) Ltd., 2026.