惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

U
Unit 42
罗磊的独立博客
T
Tailwind CSS Blog
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
Jina AI
Jina AI
V
V2EX
美团技术团队
阮一峰的网络日志
阮一峰的网络日志
酷 壳 – CoolShell
酷 壳 – CoolShell
月光博客
月光博客
量子位
MyScale Blog
MyScale Blog
G
Google Developers Blog
M
MIT News - Artificial intelligence
L
LangChain Blog
Microsoft Azure Blog
Microsoft Azure Blog
Recent Announcements
Recent Announcements
MongoDB | Blog
MongoDB | Blog
N
Netflix TechBlog - Medium
有赞技术团队
有赞技术团队
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
D
DataBreaches.Net
云风的 BLOG
云风的 BLOG
B
Blog

Construction Management

Government rolls out digital planning tool to all local authorities - Construction Management How designing for repeatability could reshape construction - Construction Management CIOB Fellow recognised in King’s Birthday Honours - Construction Management Low-carbon road job: Emissions cut in half with hydrogen and electric gear plus recycled asphalt - Construction Management How new towns offer a chance to revolutionise housing delivery - Construction Management New mental health code aims to stop workplace pressures reaching crisis point - Construction Management CITB backs Scottish prison employment programme - Construction Management Heat on site: is it time for a maximum working temperature? - Construction Management FE students tackle infrastructure projects in Constructionarium pilot - Construction Management Into the deep: Barhale picked for £12.5m tunnel inspection contract for Thames Water - Construction Management Resin injection provides quick fix for Kier’s rotting-tunnel problem - Construction Management Labour shortages are now fuelling construction disputes - Construction Management Companies fined after platform collapse breaks man’s neck - Construction Management Rick Willmott awarded OBE in King’s Birthday Honours List - Construction Management Construction professionals invited to take part in salary survey - Construction Management Estate management leadership must be driven by data Laing O’Rourke: design phase collaboration is key to MMC success HSE prepares guidance for using robots alongside humans Bluebeam extends functions and adds more AI to Max Toasty for £1.19 a day: heat pumps beat boilers in new home tests Companies fined after CCTV captures harrowing fall through skylight Video | BAM uses helicopter to install heat pumps on top of London’s Broadgate Tower Sorry, what’s a data centre? Survey shows 89% of people have no idea Video | Reds10’s ambitious targets for industrialisation Quieter decisions, greater impact: why social value must move from metrics to meaning AI recruitment platform launches to address construction skills shortage CITB launches accelerated apprenticeships Pride in Property 2026 launches with support from major real estate firms Can an assignee adjudicate under the Construction Act? Robertson to restore Grade II Henderson Hall after devastating blaze
De-gumming BSR Gateway 2: Approvals rise to 75%, 9,499 ho...
Rod Sweet · 2026-06-04 · via Construction Management
Cladding remediation underway at a UK residential high-rise. Image: Richardjohnsonuk | Dreamstime.com.

The latest building control Gateway 2 update from the Building Safety Regulator (BSR) shows a continuing de-gumming of this new and complex process.

In the 12 weeks to 30 May, approval rates increased across all application categories, including existing building safety projects, after BSR introduced an external remediation improvement plan in April.

The plan introduced a multidisciplinary team to mirror the Innovation Unit (IU) set up last September. This streamlines communication and processing through dedicated account managers.

A recruitment drive also cut individual caseloads from an average of 25 to around 10.

For new builds, IU decisions overtook the number of new cases received in the period.

Across all categories, BSR made 358 Gateway 2 decisions, with a 75% approval rate. 65% of all decisions related to London cases.

Applications representing 14,928 residential units were determined, of which 9,499 (64%) were approvals.

There are currently 38,775 residential units in live cases. New applications for 13,964 units came in during the period.

External remediation approvals up

The IU approved 90% of its cases – 28 out of 31 – in the period. London saw a 100% approval rate for its 19 case decisions.

The regulator said this reflects extra engagement with applicants.

All-time IU approvals now stand at 43, with a median approval time of 22 weeks. The IU is currently managing 131 applications, representing 30,369 residential units.

On external remediation, approval rates rose to 79% over the last 12 weeks, well above the minimum 65% end-of-year target for 2026. BSR credits its own improvements and intensive work to improve the quality of applications.

Currently, 16 legacy remediation applications from 2024 remain. A further 10 are on track to be determined in June. This is down from 42 outstanding at the beginning of 2026.

BSR said the data shows that 2026 applications are progressing faster than before. The average approval time is still 39 weeks in a rolling 12-week period, but BSR said this was “being skewed by our focus on closing out the older 2024/2025 applications”.

People still waiting

“We continue to see positive improvements in numbers of approvals for both new build and existing building remediation cases, as well as significantly faster decision times,” said acting BSR chief executive Charlie Pugsley.

“This includes continued positive results from our Innovation Unit by working closely with applicants to safely resolve complex technical challenges. This positive engagement has seen a growing number of decisions and rising approval rates.”

He added: “However, we recognise that people living in other unremediated buildings still want them to be fixed safely, and at pace.”

Story for CM? Get in touch via email: [email protected]