惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

H
Help Net Security
大猫的无限游戏
大猫的无限游戏
雷峰网
雷峰网
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
博客园 - 聂微东
V
Visual Studio Blog
爱范儿
爱范儿
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
美团技术团队
有赞技术团队
有赞技术团队
云风的 BLOG
云风的 BLOG
Google DeepMind News
Google DeepMind News
Blog — PlanetScale
Blog — PlanetScale
The Cloudflare Blog
Engineering at Meta
Engineering at Meta
博客园 - 三生石上(FineUI控件)
WordPress大学
WordPress大学
Vercel News
Vercel News
F
Fortinet All Blogs
Last Week in AI
Last Week in AI
M
MIT News - Artificial intelligence
小众软件
小众软件
月光博客
月光博客
A
About on SuperTechFans

Construction Management

Government rolls out digital planning tool to all local authorities - Construction Management CIOB Fellow recognised in King’s Birthday Honours - Construction Management Low-carbon road job: Emissions cut in half with hydrogen and electric gear plus recycled asphalt - Construction Management How new towns offer a chance to revolutionise housing delivery - Construction Management New mental health code aims to stop workplace pressures reaching crisis point - Construction Management CITB backs Scottish prison employment programme - Construction Management Heat on site: is it time for a maximum working temperature? - Construction Management FE students tackle infrastructure projects in Constructionarium pilot - Construction Management Into the deep: Barhale picked for £12.5m tunnel inspection contract for Thames Water - Construction Management Resin injection provides quick fix for Kier’s rotting-tunnel problem - Construction Management Labour shortages are now fuelling construction disputes - Construction Management Companies fined after platform collapse breaks man’s neck - Construction Management Rick Willmott awarded OBE in King’s Birthday Honours List - Construction Management Construction professionals invited to take part in salary survey - Construction Management Estate management leadership must be driven by data Laing O’Rourke: design phase collaboration is key to MMC success HSE prepares guidance for using robots alongside humans Bluebeam extends functions and adds more AI to Max Toasty for £1.19 a day: heat pumps beat boilers in new home tests Companies fined after CCTV captures harrowing fall through skylight Video | BAM uses helicopter to install heat pumps on top of London’s Broadgate Tower Sorry, what’s a data centre? Survey shows 89% of people have no idea Video | Reds10’s ambitious targets for industrialisation Quieter decisions, greater impact: why social value must move from metrics to meaning AI recruitment platform launches to address construction skills shortage CITB launches accelerated apprenticeships Pride in Property 2026 launches with support from major real estate firms Can an assignee adjudicate under the Construction Act? Robertson to restore Grade II Henderson Hall after devastating blaze Shetlanders mull ditching ferries for subsea tunnels between islands
How designing for repeatability could reshape constructio...
Paul Taylor · 2026-06-17 · via Construction Management
industrialised construction - A GenZero school design by Mott MacDonald. Image: Mott MacDonald
A GenZero school design by Mott MacDonald. Image: Mott MacDonald

Product platforms are starting to move from theory to reality, but they need a fundamental shift in how buildings are conceived and coordinated. Mott MacDonald’s Paul Taylor explains.

The UK’s Construction Playbook first set out to push the sector away from one-off, high-risk projects and towards a more industrialised model with its 2022 update. Yet for many building designers, the product platform concept set out in the report still feels abstract, almost four years on.

That’s a problem, because platforms are no longer a niche procurement idea. They are becoming a practical design framework for delivering more quickly, more predictably and with less waste.

At its simplest, a product platform is a stable design and delivery system that can be used across many projects. It includes repeatable components, agreed interfaces, production methods, digital information and the delivery relationships needed to assemble them.

For a building designer, that means designing within a clear set of rules rather than starting from scratch each time. The aim is not uniformity for its own sake; it is to repeat what adds value, while keeping enough flexibility to respond to site, brief and user needs.

This is a major cultural shift for an industry shaped by bespoke thinking. Designers, clients and contractors have long been rewarded for treating each project as unique, even when many parts are repeated. That habit slows learning, increases coordination risk and makes industrialised delivery harder to achieve. It also keeps manufacturers and specialist suppliers too far from early design decisions, where their input is most valuable.

What product platforms look like in practice

Good examples already exist. The Department for Education’s GenZero programme shows how a platform approach can combine repeatable components, repeatable processes and repeatable relationships in one system. Using a standardised kit of parts and a digitally defined design logic, Mott MacDonald worked with the programme to explore how schools could be delivered with greater consistency, lower carbon and less design rework.

Paul Taylor of Mott MacDonald

“The aim is not uniformity for its own sake. It is to repeat what adds value, while keeping enough flexibility to respond to site, brief and user needs.”

Paul Taylor

Using a digitally defined structural grid layout based on repeatable blocks, GenZero configured 72 standard school types – some of which are now in procurement or construction – from the same underlying component catalogue. The designs deployed prefabricated timber panels alongside offsite volumetric modules to slash design cycles and carbon.

For designers, the lesson is clear: standardisation does not remove creativity, but it does move effort towards where it has the most impact.

The same thinking is shaping healthcare. Historically, NHS acute facilities have been delivered individually by local trusts as bespoke projects, often affected by budget overruns and delays.

The New Hospital Programme’s Hospital 2.0 model is intended to move hospital delivery away from isolated schemes and towards a repeatable design and delivery system. Its promise lies in reducing unnecessary variation, improving coordination and creating a pipeline that gives suppliers more confidence to invest in capability and capacity.

That matters because platforms work best when they operate across programmes, not isolated buildings. Repetition at scale allows teams to improve details, validate performance and reduce cost over time.

Research from the Construction Innovation Hub’s The Value of Platforms report, published after the 2022 update to the Construction Playbook, suggests that wider adoption of product platforms across public social infrastructure could cut construction costs. The report suggests that a 31% reduction is possible, which could save up to £1.8bn a year and add up to £7.8bn annually to UK GDP.

What this means for design teams

For building designers, two priorities matter most if platform thinking is to move from strategy documents into deliverable schemes.

First, interfaces must be defined earlier and with more discipline. Platform-based design depends on clear rules for how structural, architectural and building services systems connect. If those interfaces remain loose, the claimed efficiency quickly disappears in late redesign and site fixes. For designers, this means more effort up front on coordination, tolerances and information quality, so repeatable elements can be configured within stable boundaries.

Second, demand has to be aggregated. A product platform only performs well when manufacturers, fabricators and specialist partners have enough certainty to invest in tooling, workflows and skills. That is why public programmes matter so much. They create the repeatable demand needed to support industrialised supply chains, which in turn makes platform-based design more viable.

How designers can respond now

The next phase is less about advocacy and waiting for the perfect platform strategy to emerge and more about practical adoption. For design teams and their supply chains, the starting point depends on how far they have already progressed.

If platform thinking is new to an organisation, it is best to begin with a tightly defined area of repetition. That could be an MEP riser module, plant room arrangement, standard room layout or defined repetitive interface, such as a partition connection detail. The objective is to prove where repeatability can reduce risk and improve outcomes, pilot it on a live project and then build a feedback loop around that starting point.

“Platform-based design depends on clear rules for how structural, architectural and building services systems connect. If those interfaces remain loose, the claimed efficiency quickly disappears in late redesign and site fixes.”

Paul Taylor

If an organisation is already using repeated components, the next step is broader integration to accelerate product platform use.

That means using automated configuration tools and digital-twin environments to dynamically validate equipment access zones, maintenance clearances and complex multi-system routing.

In parallel, governance and exception processes must be established to protect platforms. Without that discipline, variations by locally-based project teams can quickly dilute the benefits that platforms are meant to create.

Industry transformation

If new users can get on board and existing users can step up their platform use, then the construction sector could look fundamentally different in five to 10 years.

The change will deliver a shift away from a fragmented industry toward a high-productivity, product-led manufacturing ecosystem. The traditional site will evolve into an efficient, low-risk logistics and assembly environment, operating with millimetre precision and near-zero material waste.

For clients, this transformation means absolute financial and schedule predictability; assets will be delivered on time and on budget, insulated from market volatility. For the people using these facilities – whether they are clinical staff navigating a high-pressure hospital ward, or teachers working within a modern school environment – this approach ensures day-one operational readiness.

If this shift happens, the role of the building designer will change significantly. Design will become less about reinventing every element and more about configuring proven systems intelligently. That is where the real opportunity lies for building designers.

Paul Taylor is a principal consultant for industrialised construction at Mott MacDonald.

Story for CM? Get in touch via email: [email protected]