惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Security Archives - TechRepublic
Security Archives - TechRepublic
罗磊的独立博客
T
The Blog of Author Tim Ferriss
The GitHub Blog
The GitHub Blog
Apple Machine Learning Research
Apple Machine Learning Research
The Register - Security
The Register - Security
J
Java Code Geeks
V2EX - 技术
V2EX - 技术
Vercel News
Vercel News
N
News and Events Feed by Topic
腾讯CDC
P
Proofpoint News Feed
N
News | PayPal Newsroom
www.infosecurity-magazine.com
www.infosecurity-magazine.com
爱范儿
爱范儿
O
OpenAI News
酷 壳 – CoolShell
酷 壳 – CoolShell
月光博客
月光博客
Martin Fowler
Martin Fowler
Engineering at Meta
Engineering at Meta
D
Docker
Y
Y Combinator Blog
博客园 - 聂微东
G
Google Developers Blog
S
Security @ Cisco Blogs
Simon Willison's Weblog
Simon Willison's Weblog
S
Schneier on Security
H
Hackread – Cybersecurity News, Data Breaches, AI and More
S
SegmentFault 最新的问题
云风的 BLOG
云风的 BLOG
阮一峰的网络日志
阮一峰的网络日志
C
CXSECURITY Database RSS Feed - CXSecurity.com
CTFtime.org: upcoming CTF events
CTFtime.org: upcoming CTF events
C
CERT Recently Published Vulnerability Notes
I
Intezer
G
GRAHAM CLULEY
有赞技术团队
有赞技术团队
Attack and Defense Labs
Attack and Defense Labs
V
Visual Studio Blog
博客园 - Franky
博客园 - 三生石上(FineUI控件)
W
WeLiveSecurity
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
Hugging Face - Blog
Hugging Face - Blog
Scott Helme
Scott Helme
T
Troy Hunt's Blog
Hacker News - Newest:
Hacker News - Newest: "LLM"
L
LINUX DO - 最新话题
C
Cybersecurity and Infrastructure Security Agency CISA

Icebreaker One

Perseus Advisory Group 4 (Communications & Engagement) Summary Minutes July 2026 – Icebreaker One Equipping the future Digital Coordination Entity for Success – Icebreaker One Open Energy Steering Group July Meeting Summary – Icebreaker One Perseus Advisory Group 1 (User Needs & Impact) Summary Minutes June 2026 – Icebreaker One Perseus Advisory Group 2 (Technical Infrastructure) Summary Minutes June 2026 – Icebreaker One Key insights from our I&C Flexibility workshop – Icebreaker One Stream Steering Group June Meeting Summary – Icebreaker One Perseus Advisory Group 4 (Communications & Engagement) Summary Minutes May 2026 – Icebreaker One a data sharing Scheme to scale I&C flexibility – Icebreaker One Stream Advisory Group 2 May Meeting Summary – Icebreaker One Perseus Steering Group Summary Minutes May 2026 – Icebreaker One IB1 response to DBT’s Smart Data 2035: The UK’s Smart Data Strategy – Icebreaker One Open Energy Steering Group May Meeting Summary – Icebreaker One Perseus Advisory Group 1 (User Needs & Impact) Summary Minutes May 2026 – Icebreaker One Defining the data infrastructure for I&C flexibility – Icebreaker One Perseus Advisory Group 2 (Technical Infrastructure) Summary Minutes April 2026 – Icebreaker One Stream Steering Group April Meeting Summary – Icebreaker One IB1 response to DESNZ’s Data for AI in the energy system call for evidence – Icebreaker One IB1 response to Ofgem’s Connections end-to-end review consultation – Icebreaker One IB1 response to Elexon’s P494 Assessment Procedure consultation – Icebreaker One IB1 response to Ofgem’s Enhancing asset visibility: DNO options consultation – Icebreaker One The UK Smart Data Strategy & Perseus – Icebreaker One Stream Advisory Group 2 April Meeting Summary – Icebreaker One Stream Advisory Group 1 April Meeting Summary – Icebreaker One Perseus gas expansion helps SMEs manage risk – Icebreaker One Perseus is infrastructure, not a product – Icebreaker One Smart Data frameworks – Icebreaker One Perseus Advisory Group 4 (Communications & Engagement) Summary Minutes March 2026 – Icebreaker One UK Smart Data Strategy – to 2035 – Icebreaker One I&C flex ready to scale. Is the data infrastructure? – Icebreaker One Stream Steering Group March Meeting Summary – Icebreaker One Perseus Steering Group Summary Minutes February 2026 – Icebreaker One Stream Advisory Group 2 February Meeting Summary – Icebreaker One Open Energy Steering Group February Meeting Summary – Icebreaker One Stream Advisory Group 1 February Meeting Summary – Icebreaker One Why Scope 3 accounting needs a common approach  – Icebreaker One Perseus Advisory Group 2 (Technical Infrastructure) Summary Minutes February 2026 – Icebreaker One Perseus Advisory Group 1 (User Needs & Impact) Summary Minutes February 2026 – Icebreaker One Perseus Advisory Group 4 (Communications & Engagement) Summary Minutes February 2026 – Icebreaker One Carbon Commons Steering Group January 2026 Minutes – Icebreaker One Unlocking sustainable finance with assurable smart data – Icebreaker One Stream Steering Group January Meeting Summary – Icebreaker One IB1 response on Ofgem’s Energy digitalisation governance – Icebreaker One Perseus response to the GHG Protocol’s Scope 2 Public Consultation – Icebreaker One Response to Ofgem Modifications to RIIO-3 consultation – Icebreaker One
Stream Advisory Group 1 May Meeting Summary – Icebreaker One
Janice Hollo · 2026-05-27 · via Icebreaker One

We reconvened the Stream Market & User Needs Advisory Group, Co-chaired by Icebreaker One and Northumbrian Water.

Date: 14 May 2026 10:00-11:30 BST

Location: Online

Co-Chairs: Charlotte Hillenbrand (IB1), Katy Woodward (United Utilities) and Josh Evans (Pennon Group) 

Secretariat: Icebreaker One 

Meeting Aims:

  1. Create a clear set of recommendations for the SG members in regards to the upcoming outcomes
  2. Endorse Q3 outcomes
  3. Review and comment on the new website outline

Summary:

It was agreed that:

  • A website testing group should be set up, with interested members invited to register by email.
  • The outcomes for the two pillars would be presented as a high level summary to Steering Group:
    • Use Cases and Datasets this quarter will focus on aligning data standards for priority use cases, so members are ready for adoption and data publishing while keeping delivery as far as possible within Stream’s control.
    • Ecosystem this quarter will focus on strengthening Stream’s visibility and stakeholder engagement, including a refreshed web presence, to support the transition toward an independent entity.

It was noted that:

  • Several Q2 outcomes have been deferred because they depend on external projects outside Stream’s control, including:
    • CReDO has clarified the scope but funding confirmation is still outstanding
    • CaSTCo – a response on next steps is still pending
  • APR is making strong progress in Q2
  • The data portal would remain on ESRI for now, while the website front end would be rebuilt separately.

It was discussed that:

  • There is a tension between Stream’s convening role, which depends on external partners, and the need to set outcomes that are within Stream’s control.
  • Future outcomes may need to focus more on readiness and responsiveness, rather than on external milestones.
  • Website content and navigation should better show Stream’s value, services, products, governance, and impact.
  • The distinction between active use cases and retrospective case studies was useful and should be reflected clearly on the website.

Next meeting: Thursday 25 June 2026 10:00-11:30 BST

Formal records, including attendees, are maintained by the secretariat. 

These are confidential to the Advisory Group Members.