惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Blog — PlanetScale
Blog — PlanetScale
Y
Y Combinator Blog
G
Google Developers Blog
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
L
LangChain Blog
S
SegmentFault 最新的问题
J
Java Code Geeks
V
Visual Studio Blog
H
Help Net Security
Stack Overflow Blog
Stack Overflow Blog
aimingoo的专栏
aimingoo的专栏
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
T
Tailwind CSS Blog
Microsoft Azure Blog
Microsoft Azure Blog
博客园_首页
H
Hackread – Cybersecurity News, Data Breaches, AI and More
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园 - Franky
B
Blog RSS Feed
The Cloudflare Blog
MyScale Blog
MyScale Blog
月光博客
月光博客
Microsoft Security Blog
Microsoft Security Blog
美团技术团队

BloombergNEF

Japan’s Energy Transition Enters New Phase Shaped by Rising Electricity Demand and Energy Security Needs, Per BloombergNEF’s New Energy Outlook 2026: Japan Global Gas Turbine Manufacturing Outlook: Crunch, for Now | BloombergNEF Global Gas Turbine Manufacturing Outlook: Crunch, for Now | BloombergNEF BloombergNEF’s South Africa Transition Factbook: Power-Market Reform and Private Investments Drive Energy Transition | BloombergNEF test social MENA Clean Energy Market Outlook 2026 | BloombergNEF Six Months In: The Iran War’s Global Impact | BloombergNEF Renewable Energy Investments Show One Booming Sector | BloombergNEF Bank of America’s ‘Robust’ AI Data Center Deal Pipeline: Q and A | BloombergNEF test social Six Things to Know About BNEF’s New US Data Center Capacity Outlook | BloombergNEF Sustainable Aviation Fuel Price Outlook: Leveling Off | BloombergNEF Solar Set to Rule World’s Power Supply: Three Things to Know | BloombergNEF Energy Transition Impacts: Sector and Country Impacts from a Demand-Driven Model | BloombergNEF BloombergNEF Turkey Transition Factbook 2026: Clean Power Growth Positions Turkey for the Next Phase of Its Energy Transition | BloombergNEF Competitiveness, Cost and Climate: Five Themes From the BNEF Summit Amsterdam | BloombergNEF Electric Vehicle Outlook | BloombergNEF BloombergNEF’s Electric Vehicle Outlook 2026: Global EV Sales Set For Another Record-Breaking Year, But Growth in Some Major Markets Slows | BloombergNEF Mexico Transition Factbook 2026 Have Oil Prices Already Peaked? Three Things to Know Liebreich: The Great Clean Energy Acceleration 2.0 Global Clean-Energy Trade Rebounds to $479 Billion in 2025 Despite Tariffs and Geopolitical Turmoil: BloombergNEF New Energy Outlook 2026 New Energy Outlook 2026 BloombergNEF’s New Energy Outlook 2026: Transition to Newer Technologies, Expanded Electrification to Strengthen Nations’ Energy Security Energy Transition Bank Financing Struggles to Pull Ahead of Fossil Fuels in Asia Data Centers and the Future of Energy Storage Data Centers and the Future of Energy Storage Energy Storage Enters the 100-Gigawatt Era: Three Things to Know AI Data Centers, Energy and Finance: Dispatch from the BNEF Summit New York 2026
New Data Center Hotspots Are Emerging: Four Things to Know
2026-03-06 · via BloombergNEF

March 6, 2026

By Lloyd Arnold, Data Center Analyst, BloombergNEF

A massive buildout of data center capacity is underway. BloombergNEF has tracked 22.8 gigawatts of IT capacity (or compute capacity) currently under construction globally. This is likely to come online in the next three years, and is more than a third of the size of the existing market. As challenges emerge in existing data center hubs, developers are looking to new geographies for the next phase of growth.

1. Energy and land are the most important factors in data center development

Through conversations with data center developers, BNEF developed a framework to assess the how friendly a market is for new data centers. Energy availability and land permitting emerged as the most important factors, together making up 58% of a markets overall score. Tax policy, fiber connectivity and existing data center capacity rounded out the scoring system, which consists of 43 metrics per market.

2. US is the market leader, and will likely stay at top position

The US is the most important data center market in the world, representing 51% of current live IT capacity (29.9 gigawatts) and 72% of capacity under construction. The country has significant historical importance as a data center market, and it is experiencing outsized gains from increasing AI demand due to the concentration of AI companies on its shores. Virginia and Texas both have more live data center capacity than most national markets, and scored as the top two markets in BNEF’s recent market ranking.

There are challenges in both the top US markets, as their power grids come under growing strain and public attitudes shift. Community opposition to data center projects is growing, and several high profile projects have been stalled, such as the Digital Gateway development in Prince William County, Virginia. Despite this, they remain highly desirable – over 66GW of data center IT capacity is planned across the two states.

3. Middle East is high-risk, high-reward for data center developers

Saudi Arabia and the United Arab Emirates came in at third and fourth in BNEF’s ranking, lifted by strong scores on energy availability and land permitting. Power in the region is cheap, and installations are growing. Both governments are also very supportive of developing data centers in the markets, and construction permits can be obtained quickly.

BNEF’s assessment did not include geopolitical risk, but this could affect future development in the region. Export controls on advanced chips were introduced by the Biden administration, and then partially lifted by the Trump administration but could be re-introduced. There are also questions about the willingness of American technology companies to operate in the market – AI firm Anthropic has indicated that it will not use data center capacity in the market.

4. Europe is increasingly two-track

Historically, the European data center market has been centered around “FLAP-D” – the metropolitan areas around Frankfurt, London, Amsterdam, Paris and Dublin. These cities are hubs of the technology and finance sectors, both of which drove early demand for compute, and they have also developed into important fiber hubs. However, grid congestion, high power prices, long interconnection queues and lack of available land now serve as major headwinds in these regions and, to varying extents, in their national markets.

As challenges mount in traditional hubs, early stage capacity is increasingly shifting to the Nordics, and to Spain. These markets offer a similar pitch: lots of land, cheap and clean energy as well as and generally, more supportive attitudes to data center development. This is demonstrated when we look at our average scores for Europe’s second tier markets against those for FLAP-D. The former achieved significantly stronger scores on energy and land permitting.

Related Content

The latest from BloombergNEF delivered to your inbox

Sign up for BNEF’s free newsletter.